{"id":9838,"date":"2026-08-17T15:00:01","date_gmt":"2026-08-17T07:00:01","guid":{"rendered":"https:\/\/meettfit.com\/?p=9838"},"modified":"2026-08-17T11:17:52","modified_gmt":"2026-08-17T03:17:52","slug":"what-pvc-flooring-data-should-a-bim-model-include","status":"publish","type":"post","link":"https:\/\/meettfit.com\/pt\/blogue-sobre-pavimentos-em-pvc\/que-dados-relativos-ao-pavimento-em-pvc-deve-incluir-um-modelo-bim\/","title":{"rendered":"Que dados relativos aos pavimentos em PVC deve incluir um modelo BIM?"},"content":{"rendered":"<p><strong>Um modelo BIM de pavimento em PVC deve incluir dados relativos \u00e0 identifica\u00e7\u00e3o, geometria, material, desempenho, sustentabilidade, instala\u00e7\u00e3o, custo e ciclo de vida da gest\u00e3o de instala\u00e7\u00f5es (FM), cada um deles estruturado com o tipo de par\u00e2metro, a unidade e a refer\u00eancia de ensaio adequados.<\/strong><\/p>\n<p>Passei anos na \u00e1rea da produ\u00e7\u00e3o de pavimentos em PVC e vejo o mesmo problema a repetir-se constantemente. Um modelo apresenta um ret\u00e2ngulo plano com a indica\u00e7\u00e3o \u00abpavimento em vinil\u00bb, nada mais. Depois, come\u00e7am os pedidos de informa\u00e7\u00e3o (RFI), o processo de aquisi\u00e7\u00e3o fica paralisado e as equipas das instala\u00e7\u00f5es ficam com um pavimento sem quaisquer dados de manuten\u00e7\u00e3o. Um objeto BIM utiliz\u00e1vel \u00e9 um reposit\u00f3rio de dados, n\u00e3o apenas uma forma, e necessita de uma estrutura definida.<\/p>\n<p>A seguir, apresentamos o que esse contentor deve conter, como organiz\u00e1-lo e como se articula com normas abertas como o IFC e o COBie.<\/p>\n<h2>Por que raz\u00e3o os dados detalhados s\u00e3o mais importantes do que os objetos gen\u00e9ricos<\/h2>\n<p><strong>Generic flooring objects cause RFIs and procurement errors. The required data depth should follow the project&#8217;s information requirements and BIM Execution Plan, not a fixed LOD assumption.<\/strong><\/p>\n<p>A model with no product code, fire rating, or slip value forces every downstream team to chase missing specs manually. Rather than assuming a fixed LOD target, the model&#8217;s detail should match what the project&#8217;s exchange requirements actually demand at each stage \u2014 enough to support coordination, specification, and procurement by construction stage.<\/p>\n<h2>Categorias principais de dados<\/h2>\n<p><strong>Os dados BIM relativos aos pavimentos em PVC dividem-se em sete grupos: geometria, material\/produto, desempenho, sustentabilidade, instala\u00e7\u00e3o, custo e gest\u00e3o de instala\u00e7\u00f5es\/ciclo de vida.<\/strong><\/p>\n<ul>\n<li><strong>Geometria:<\/strong> espessura total, dimens\u00f5es das t\u00e1buas\/ladrilhos ou largura do rolo, padr\u00e3o de instala\u00e7\u00e3o, subpavimento e detalhes de transi\u00e7\u00e3o. A modela\u00e7\u00e3o do padr\u00e3o ajuda na coordena\u00e7\u00e3o do tra\u00e7ado, mas a margem para desperd\u00edcio deve continuar a ser um valor de aquisi\u00e7\u00e3o separado, uma vez que o desperd\u00edcio real depende da forma da divis\u00e3o, do plano de jun\u00e7\u00f5es e da correspond\u00eancia entre lotes, e n\u00e3o apenas da geometria.<\/li>\n<li><strong>Material\/Produto:<\/strong> fabricante, c\u00f3digo do produto, tipo de pavimento (homog\u00e9neo, heterog\u00e9neo, LVT), cor e base. No caso do vinil heterog\u00e9neo\/LVT, registe a espessura da camada de desgaste separadamente da espessura total. No caso do vinil homog\u00e9neo, registe, em vez disso, o tipo de constru\u00e7\u00e3o, uma vez que \u00e9 uniforme em toda a sua espessura.<\/li>\n<li><strong>Desempenho:<\/strong> resist\u00eancia ao deslizamento, classifica\u00e7\u00e3o de resist\u00eancia ao fogo, desempenho ac\u00fastico, resist\u00eancia \u00e0 indenta\u00e7\u00e3o, resist\u00eancia qu\u00edmica, dados relativos aos COV. Cada valor de desempenho deve ser acompanhado do respetivo m\u00e9todo de ensaio e norma \u2014 um valor DCOF ou R, por si s\u00f3, n\u00e3o \u00e9 suficiente, uma vez que os limites variam consoante a norma e a classifica\u00e7\u00e3o de utiliza\u00e7\u00e3o.<\/li>\n<li><strong>Sustentabilidade:<\/strong> certifica\u00e7\u00f5es (FloorScore, EPD), teor de material reciclado, prazo de garantia, conformidade com os c\u00f3digos regionais.<\/li>\n<li><strong>Instala\u00e7\u00e3o:<\/strong> tipo de adesivo, limites de humidade e planicidade do subpavimento, m\u00e9todo de instala\u00e7\u00e3o, necessidades relativas \u00e0s juntas de dilata\u00e7\u00e3o.<\/li>\n<li><strong>Custos\/Aquisi\u00e7\u00f5es:<\/strong> custo unit\u00e1rio, fornecedor e prazo de entrega, bem como a margem de desperd\u00edcio como um campo pr\u00f3prio.<\/li>\n<li><strong>FM\/Ciclo de vida:<\/strong> vida \u00fatil prevista, plano de manuten\u00e7\u00e3o, ciclo de substitui\u00e7\u00e3o, etiqueta de identifica\u00e7\u00e3o do ativo para CAFM\/CMMS, n\u00famero de lote, data de instala\u00e7\u00e3o.<\/li>\n<\/ul>\n<p><img decoding=\"async\" src=\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-1-10.jpg&quot;\" alt=\"Categorias de dados relativos aos pavimentos em PVC\" \/><\/p>\n<h2>A Lista de Verifica\u00e7\u00e3o Completa de Par\u00e2metros<\/h2>\n<p><strong>Uma lista de verifica\u00e7\u00e3o funcional deve incluir o par\u00e2metro, o tipo de dados, a unidade, o estado do tipo\/inst\u00e2ncia e o estado \u00abobrigat\u00f3rio\/opcional\u00bb para cada campo.<\/strong><\/p>\n<table>\n<thead>\n<tr>\n<th>Categoria<\/th>\n<th>Par\u00e2metro<\/th>\n<th>Tipo de dados \/ Unidade<\/th>\n<th>Tipo ou Inst\u00e2ncia<\/th>\n<th>Obrigat\u00f3rio<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Identidade<\/td>\n<td>Fabricante, C\u00f3digo do produto, Tipo de pavimento, C\u00f3digo de classifica\u00e7\u00e3o<\/td>\n<td>Texto<\/td>\n<td>Tipo<\/td>\n<td>Obrigat\u00f3rio<\/td>\n<\/tr>\n<tr>\n<td>Geometria<\/td>\n<td>Espessura total (mm), camada de desgaste (mm), dimens\u00f5es do ladrilho\/t\u00e1bua, largura do rolo<\/td>\n<td>N\u00famero\/Dimens\u00e3o<\/td>\n<td>Tipo<\/td>\n<td>Obrigat\u00f3rio<\/td>\n<\/tr>\n<tr>\n<td>Geometria<\/td>\n<td>Padr\u00e3o de instala\u00e7\u00e3o, \u00e1rea de cobertura (m\u00b2)<\/td>\n<td>Texto\/N\u00famero<\/td>\n<td>Inst\u00e2ncia<\/td>\n<td>Recomendado<\/td>\n<\/tr>\n<tr>\n<td>Desempenho<\/td>\n<td>Valor de resist\u00eancia ao deslizamento + M\u00e9todo de ensaio<\/td>\n<td>N\u00famero + Texto<\/td>\n<td>Tipo<\/td>\n<td>Obrigat\u00f3rio<\/td>\n<\/tr>\n<tr>\n<td>Desempenho<\/td>\n<td>Classifica\u00e7\u00e3o de resist\u00eancia ao fogo, Redu\u00e7\u00e3o do ru\u00eddo de impacto (dB), Indenta\u00e7\u00e3o residual (mm)<\/td>\n<td>Texto\/N\u00famero<\/td>\n<td>Tipo<\/td>\n<td>Obrigat\u00f3rio\/Recomendado<\/td>\n<\/tr>\n<tr>\n<td>Sustentabilidade<\/td>\n<td>Certifica\u00e7\u00e3o VOC, N\u00famero EPD, Teor de material reciclado (%), Garantia (anos)<\/td>\n<td>Texto\/N\u00famero<\/td>\n<td>Tipo<\/td>\n<td>Recomendado<\/td>\n<\/tr>\n<tr>\n<td>Instala\u00e7\u00e3o<\/td>\n<td>Tipo de adesivo, limite de humidade do subpavimento, m\u00e9todo de instala\u00e7\u00e3o<\/td>\n<td>Texto\/N\u00famero<\/td>\n<td>Tipo<\/td>\n<td>Obrigat\u00f3rio<\/td>\n<\/tr>\n<tr>\n<td>Custo<\/td>\n<td>Custo unit\u00e1rio, prazo de entrega, margem de desperd\u00edcio (%)<\/td>\n<td>N\u00famero<\/td>\n<td>Inst\u00e2ncia\/Tipo<\/td>\n<td>Recomendado<\/td>\n<\/tr>\n<tr>\n<td>FM<\/td>\n<td>Vida \u00fatil prevista, calend\u00e1rio de manuten\u00e7\u00e3o (liga\u00e7\u00e3o), data de instala\u00e7\u00e3o, n\u00famero de lote, data de substitui\u00e7\u00e3o<\/td>\n<td>N\u00famero\/Texto\/Data<\/td>\n<td>Inst\u00e2ncia<\/td>\n<td>Obrigat\u00f3rio\/Recomendado<\/td>\n<\/tr>\n<tr>\n<td>Verifica\u00e7\u00e3o<\/td>\n<td>Revis\u00e3o do TDS, Norma de ensaio, N\u00famero do certificado, Data de validade do certificado, Data da \u00faltima atualiza\u00e7\u00e3o<\/td>\n<td>Texto\/Data<\/td>\n<td>Tipo<\/td>\n<td>Recomendado<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><img decoding=\"async\" src=\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-3-9.jpg&quot;\" alt=\"Tabela de verifica\u00e7\u00e3o de par\u00e2metros BIM para pavimentos em PVC\" \/><\/p>\n<h2>Par\u00e2metros de tipo vs. par\u00e2metros de inst\u00e2ncia<\/h2>\n<p><strong>Os dados de tipo descrevem o pr\u00f3prio produto; os dados de inst\u00e2ncia descrevem uma ocorr\u00eancia espec\u00edfica do mesmo.<\/strong><\/p>\n<p>O fabricante, o c\u00f3digo do produto, a espessura e a classe de resist\u00eancia ao fogo pertencem ao n\u00edvel \u00abTipo\u00bb, uma vez que todas as unidades desse produto partilham o mesmo valor. A divis\u00e3o\/zona, a quantidade instalada, a data de instala\u00e7\u00e3o e o n\u00famero de lote pertencem ao n\u00edvel \u00abInst\u00e2ncia\u00bb, uma vez que duas divis\u00f5es com o mesmo produto podem, ainda assim, ter datas de instala\u00e7\u00e3o ou lotes diferentes. A confus\u00e3o entre estes n\u00edveis \u00e9 um dos erros mais comuns nos objetos fornecidos pelo fabricante e compromete o planeamento posterior.<\/p>\n<h2>Convers\u00e3o para IFC e openBIM<\/h2>\n<p><strong>Os pavimentos em PVC correspondem normalmente ao elemento IfcCovering com o PredefinedType \u00abFLOORING\u00bb, utilizando conjuntos de propriedades padr\u00e3o, al\u00e9m de um conjunto personalizado para dados espec\u00edficos do fabricante.<\/strong><\/p>\n<p>Some flooring-specific properties already exist in standard IFC property sets, while data like SKU, wear layer thickness, or certificate numbers usually needs a custom property set. buildingSMART&#8217;s Information Delivery Specification (IDS) can define which objects, classifications, properties, and units must exist in a model exchange, and can automatically check whether a delivered IFC model meets that requirement \u2014 useful for validating flooring data without manual review.<\/p>\n<h2>Transi\u00e7\u00e3o do COBie para o FM<\/h2>\n<p><strong>O COBie divide os dados relativos ao pavimento em registos de Tipo, Componente, Atributo e Documento, para que as equipas respons\u00e1veis pelas instala\u00e7\u00f5es possam utiliz\u00e1-los sem terem de abrir o modelo nativo.<\/strong><\/p>\n<p>Type records carry product-level facts (manufacturer, spec); Component records carry instance-level facts (location, install date); Attribute records carry extra properties (warranty, fire rating); Document records link to files like EPDs or installation guides rather than embedding them. The exact fields required should be set by the asset owner&#8217;s information requirements, not assumed to be identical across every project.<\/p>\n<h2>O que fica no modelo vs. o que deve ter uma liga\u00e7\u00e3o externa<\/h2>\n<p><strong>Os valores individuais estruturados (espessura, classifica\u00e7\u00e3o, resist\u00eancia ao fogo) devem ser inclu\u00eddos como par\u00e2metros. Os documentos completos (manuais de instala\u00e7\u00e3o, EPDs, PDFs de garantia) devem ser inclu\u00eddos como refer\u00eancias com hiperliga\u00e7\u00f5es.<\/strong><\/p>\n<p>A simple rule: if a value drives a calculation, filter, or schedule, make it a parameter. If it&#8217;s a document someone needs to read, link it by URL or document ID instead of embedding it. This keeps file size manageable and keeps referenced documents current at the source.<\/p>\n<h2>Os diferentes tipos de pavimentos em PVC requerem par\u00e2metros distintos<\/h2>\n<p><strong>Os pavimentos heterog\u00e9neos, homog\u00e9neos, desportivos, ESD e LVT requerem, cada um, campos adicionais para al\u00e9m da lista de verifica\u00e7\u00e3o b\u00e1sica.<\/strong><\/p>\n<table>\n<thead>\n<tr>\n<th>Tipo de produto<\/th>\n<th>Par\u00e2metros adicionais<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Chapa heterog\u00e9nea<\/td>\n<td>Camada de desgaste, suporte, desempenho ac\u00fastico<\/td>\n<\/tr>\n<tr>\n<td>Homog\u00e9neo<\/td>\n<td>Classifica\u00e7\u00e3o da constru\u00e7\u00e3o\/ligante, tratamento da superf\u00edcie<\/td>\n<\/tr>\n<tr>\n<td>PVC desportivo<\/td>\n<td>Amortecimento, deforma\u00e7\u00e3o vertical, ressalto da bola, atrito<\/td>\n<\/tr>\n<tr>\n<td>PVC ESD<\/td>\n<td>Resist\u00eancia el\u00e9trica, requisitos de liga\u00e7\u00e3o \u00e0 terra<\/td>\n<\/tr>\n<tr>\n<td>LVT\/ta\u00e7a<\/td>\n<td>Dimens\u00f5es das t\u00e1buas, m\u00e9todo de fixa\u00e7\u00e3o\/colagem<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><img decoding=\"async\" src=\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-4-7.jpg&quot;\" alt=\"Par\u00e2metros espec\u00edficos do produto por tipo de pavimento em PVC\" \/><\/p>\n<h2>Verificar se os dados est\u00e3o atualizados<\/h2>\n<p><strong>Track TDS revision, test standard, certificate number, expiry date, and last update date so specifiers aren&#8217;t working from outdated data.<\/strong><\/p>\n<p>J\u00e1 vi equipas respons\u00e1veis pela apresenta\u00e7\u00e3o de propostas a utilizarem um objeto BIM antigo com um certificado caducado ou uma ficha t\u00e9cnica desatualizada. Uma data de revis\u00e3o e de validade vis\u00edveis permitem detetar isso imediatamente, em vez de a verifica\u00e7\u00e3o de conformidade dar errado mais tarde.<\/p>\n<h2>Denomina\u00e7\u00e3o e classifica\u00e7\u00e3o<\/h2>\n<p><strong>Utilize par\u00e2metros partilhados, uma nomenclatura consistente e um c\u00f3digo de classifica\u00e7\u00e3o (Uniclass\/OmniClass) para que os dados sejam mantidos na troca entre plataformas.<\/strong><\/p>\n<p>&quot;WearLayer_mm&quot; in one object and &quot;Wear Layer Thickness&quot; in another won&#8217;t match automatically in a schedule or export. Consistent naming plus a classification code keeps data meaningful once it leaves its original Revit file.<\/p>\n<h2>Erros comuns<\/h2>\n<ul>\n<li>Tratar o BIM apenas como geometria, deixando os campos relativos ao desempenho e aos custos em branco<\/li>\n<li>Nomes de par\u00e2metros inconsistentes entre objetos<\/li>\n<li>Misturar dados de tipo e de inst\u00e2ncia ao n\u00edvel errado<\/li>\n<li>Chasing a fixed LOD number instead of the project&#8217;s actual information requirement<\/li>\n<\/ul>\n<h2>M\u00ednimo vs. Pronto para as especifica\u00e7\u00f5es vs. Pronto para FM<\/h2>\n<p><strong>Ajustar a profundidade dos dados \u00e0 fase do projeto, em vez de carregar todos os campos na fase inicial de conce\u00e7\u00e3o.<\/strong><\/p>\n<ul>\n<li><strong>M\u00ednimo:<\/strong> identidade, geometria, propriedades t\u00e9cnicas b\u00e1sicas \u2014 o suficiente para posicionar e visualizar numa fase inicial.<\/li>\n<li><strong>Pronto para especifica\u00e7\u00e3o:<\/strong> inclui dados de desempenho com m\u00e9todos de ensaio, certifica\u00e7\u00f5es de sustentabilidade e requisitos de instala\u00e7\u00e3o \u2014 informa\u00e7\u00e3o suficiente para o concurso.<\/li>\n<li><strong>Compat\u00edvel com FM:<\/strong> inclui garantia, vida \u00fatil, calend\u00e1rio de manuten\u00e7\u00e3o, links para documentos e dados de inst\u00e2ncias alinhados com a norma COBie \u2014 informa\u00e7\u00e3o suficiente para a transfer\u00eancia de responsabilidades.<\/li>\n<\/ul>\n<p><img decoding=\"async\" src=\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-5-6.jpg&quot;\" alt=\"N\u00edveis de dados BIM para pavimentos em PVC\" \/><\/p>\n<h2>Conclus\u00e3o<\/h2>\n<p>Um objeto BIM completo para pavimentos em PVC deve incluir dados relativos \u00e0 identidade, geometria, desempenho, sustentabilidade, instala\u00e7\u00e3o, custo e gest\u00e3o de instala\u00e7\u00f5es, devidamente estruturados e verificados.<\/p>\n<p>If you&#8217;re building a custom or bulk PVC flooring BIM object and want to close any data gaps before production, feel free to send me a message.<\/p>","protected":false},"excerpt":{"rendered":"<p>A PVC flooring BIM model should include identity, geometry, material, performance, sustainability, installation, cost, and FM lifecycle data, each structured with the right parameter type, unit, and test reference. I have spent years on the manufacturing side of PVC flooring, and I see the same problem repeatedly. A model shows a flat rectangle labeled &quot;vinyl&#8230;<\/p>","protected":false},"author":4,"featured_media":9845,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[21],"tags":[],"class_list":["post-9838","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-pvc-floor-blog"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>What PVC Flooring Data Should a BIM Model Include - MF FLOOR<\/title>\n<meta name=\"description\" content=\"Learn what PVC flooring BIM data should include, from geometry and performance to IFC, COBie, installation, cost and FM data.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/meettfit.com\/pt\/blogue-sobre-pavimentos-em-pvc\/que-dados-relativos-ao-pavimento-em-pvc-deve-incluir-um-modelo-bim\/\" \/>\n<meta property=\"og:locale\" content=\"pt_PT\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"What PVC Flooring Data Should a BIM Model Include - MF FLOOR\" \/>\n<meta property=\"og:description\" content=\"Learn what PVC flooring BIM data should include, from geometry and performance to IFC, COBie, installation, cost and FM data.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/meettfit.com\/pt\/blogue-sobre-pavimentos-em-pvc\/que-dados-relativos-ao-pavimento-em-pvc-deve-incluir-um-modelo-bim\/\" \/>\n<meta property=\"og:site_name\" content=\"MF FLOOR\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/profile.php?id=100079773047357\" \/>\n<meta property=\"article:published_time\" content=\"2026-08-17T07:00:01+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2-10.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Leo\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"Leo\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tempo estimado de leitura\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/\"},\"author\":{\"name\":\"Leo\",\"@id\":\"https:\/\/meettfit.com\/#\/schema\/person\/ba93f0ead95f571b725acc83f6544fef\"},\"headline\":\"What PVC Flooring Data Should a BIM Model Include\",\"datePublished\":\"2026-08-17T07:00:01+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/\"},\"wordCount\":1249,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/meettfit.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2-10.jpg\",\"articleSection\":[\"Vinyl Flooring Insights\"],\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/\",\"url\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/\",\"name\":\"What PVC Flooring Data Should a BIM Model Include - MF FLOOR\",\"isPartOf\":{\"@id\":\"https:\/\/meettfit.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2-10.jpg\",\"datePublished\":\"2026-08-17T07:00:01+00:00\",\"description\":\"Learn what PVC flooring BIM data should include, from geometry and performance to IFC, COBie, installation, cost and FM data.\",\"breadcrumb\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#breadcrumb\"},\"inLanguage\":\"pt-PT\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#primaryimage\",\"url\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2-10.jpg\",\"contentUrl\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2-10.jpg\",\"width\":800,\"height\":600,\"caption\":\"PVC Flooring (2)\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/meettfit.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"What PVC Flooring Data Should a BIM Model Include\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/meettfit.com\/#website\",\"url\":\"https:\/\/meettfit.com\/\",\"name\":\"MF FLOOR\",\"description\":\"fitness and sports floor China factory\",\"publisher\":{\"@id\":\"https:\/\/meettfit.com\/#organization\"},\"alternateName\":\"MF FLOOR\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/meettfit.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-PT\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/meettfit.com\/#organization\",\"name\":\"MF FLOOR\",\"alternateName\":\"MF FLOOR\",\"url\":\"https:\/\/meettfit.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\/\/meettfit.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2025\/02\/cropped-icon.png\",\"contentUrl\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2025\/02\/cropped-icon.png\",\"width\":512,\"height\":512,\"caption\":\"MF FLOOR\"},\"image\":{\"@id\":\"https:\/\/meettfit.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/profile.php?id=100079773047357\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/meettfit.com\/#\/schema\/person\/ba93f0ead95f571b725acc83f6544fef\",\"name\":\"Leo\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-PT\",\"@id\":\"https:\/\/meettfit.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/848b16970688cfb2f4cc64e85a2e2233183d3242ed0a21ffa4c859df339031f6?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/848b16970688cfb2f4cc64e85a2e2233183d3242ed0a21ffa4c859df339031f6?s=96&d=mm&r=g\",\"caption\":\"Leo\"},\"url\":\"https:\/\/meettfit.com\/pt\/author\/1659230944qq-com\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"What PVC Flooring Data Should a BIM Model Include - MF FLOOR","description":"Learn what PVC flooring BIM data should include, from geometry and performance to IFC, COBie, installation, cost and FM data.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/meettfit.com\/pt\/blogue-sobre-pavimentos-em-pvc\/que-dados-relativos-ao-pavimento-em-pvc-deve-incluir-um-modelo-bim\/","og_locale":"pt_PT","og_type":"article","og_title":"What PVC Flooring Data Should a BIM Model Include - MF FLOOR","og_description":"Learn what PVC flooring BIM data should include, from geometry and performance to IFC, COBie, installation, cost and FM data.","og_url":"https:\/\/meettfit.com\/pt\/blogue-sobre-pavimentos-em-pvc\/que-dados-relativos-ao-pavimento-em-pvc-deve-incluir-um-modelo-bim\/","og_site_name":"MF FLOOR","article_publisher":"https:\/\/www.facebook.com\/profile.php?id=100079773047357","article_published_time":"2026-08-17T07:00:01+00:00","og_image":[{"width":800,"height":600,"url":"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2-10.jpg","type":"image\/jpeg"}],"author":"Leo","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"Leo","Tempo estimado de leitura":"7 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#article","isPartOf":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/"},"author":{"name":"Leo","@id":"https:\/\/meettfit.com\/#\/schema\/person\/ba93f0ead95f571b725acc83f6544fef"},"headline":"What PVC Flooring Data Should a BIM Model Include","datePublished":"2026-08-17T07:00:01+00:00","mainEntityOfPage":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/"},"wordCount":1249,"commentCount":0,"publisher":{"@id":"https:\/\/meettfit.com\/#organization"},"image":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#primaryimage"},"thumbnailUrl":"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2-10.jpg","articleSection":["Vinyl Flooring Insights"],"inLanguage":"pt-PT","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/","url":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/","name":"What PVC Flooring Data Should a BIM Model Include - MF FLOOR","isPartOf":{"@id":"https:\/\/meettfit.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#primaryimage"},"image":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#primaryimage"},"thumbnailUrl":"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2-10.jpg","datePublished":"2026-08-17T07:00:01+00:00","description":"Learn what PVC flooring BIM data should include, from geometry and performance to IFC, COBie, installation, cost and FM data.","breadcrumb":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#breadcrumb"},"inLanguage":"pt-PT","potentialAction":[{"@type":"ReadAction","target":["https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/"]}]},{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#primaryimage","url":"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2-10.jpg","contentUrl":"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2-10.jpg","width":800,"height":600,"caption":"PVC Flooring (2)"},{"@type":"BreadcrumbList","@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/meettfit.com\/"},{"@type":"ListItem","position":2,"name":"What PVC Flooring Data Should a BIM Model Include"}]},{"@type":"WebSite","@id":"https:\/\/meettfit.com\/#website","url":"https:\/\/meettfit.com\/","name":"MF FLOOR","description":"fitness and sports floor China factory","publisher":{"@id":"https:\/\/meettfit.com\/#organization"},"alternateName":"MF FLOOR","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/meettfit.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-PT"},{"@type":"Organization","@id":"https:\/\/meettfit.com\/#organization","name":"MF FLOOR","alternateName":"MF FLOOR","url":"https:\/\/meettfit.com\/","logo":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/meettfit.com\/#\/schema\/logo\/image\/","url":"https:\/\/meettfit.com\/wp-content\/uploads\/2025\/02\/cropped-icon.png","contentUrl":"https:\/\/meettfit.com\/wp-content\/uploads\/2025\/02\/cropped-icon.png","width":512,"height":512,"caption":"MF FLOOR"},"image":{"@id":"https:\/\/meettfit.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/profile.php?id=100079773047357"]},{"@type":"Person","@id":"https:\/\/meettfit.com\/#\/schema\/person\/ba93f0ead95f571b725acc83f6544fef","name":"Leo","image":{"@type":"ImageObject","inLanguage":"pt-PT","@id":"https:\/\/meettfit.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/848b16970688cfb2f4cc64e85a2e2233183d3242ed0a21ffa4c859df339031f6?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/848b16970688cfb2f4cc64e85a2e2233183d3242ed0a21ffa4c859df339031f6?s=96&d=mm&r=g","caption":"Leo"},"url":"https:\/\/meettfit.com\/pt\/author\/1659230944qq-com\/"}]}},"_links":{"self":[{"href":"https:\/\/meettfit.com\/pt\/wp-json\/wp\/v2\/posts\/9838","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/meettfit.com\/pt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/meettfit.com\/pt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/meettfit.com\/pt\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/meettfit.com\/pt\/wp-json\/wp\/v2\/comments?post=9838"}],"version-history":[{"count":1,"href":"https:\/\/meettfit.com\/pt\/wp-json\/wp\/v2\/posts\/9838\/revisions"}],"predecessor-version":[{"id":9849,"href":"https:\/\/meettfit.com\/pt\/wp-json\/wp\/v2\/posts\/9838\/revisions\/9849"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/meettfit.com\/pt\/wp-json\/wp\/v2\/media\/9845"}],"wp:attachment":[{"href":"https:\/\/meettfit.com\/pt\/wp-json\/wp\/v2\/media?parent=9838"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/meettfit.com\/pt\/wp-json\/wp\/v2\/categories?post=9838"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/meettfit.com\/pt\/wp-json\/wp\/v2\/tags?post=9838"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}