{"id":9838,"date":"2026-08-17T15:00:01","date_gmt":"2026-08-17T07:00:01","guid":{"rendered":"https:\/\/meettfit.com\/?p=9838"},"modified":"2026-08-17T11:17:52","modified_gmt":"2026-08-17T03:17:52","slug":"what-pvc-flooring-data-should-a-bim-model-include","status":"publish","type":"post","link":"https:\/\/meettfit.com\/pl\/blog-o-podlogach-pcv\/jakie-dane-dotyczace-podlog-z-pvc-powinien-zawierac-model-bim\/","title":{"rendered":"Jakie dane dotycz\u0105ce pod\u0142\u00f3g z PVC powinny znale\u017a\u0107 si\u0119 w modelu BIM?"},"content":{"rendered":"<p><strong>Model BIM pod\u0142ogi z PVC powinien zawiera\u0107 dane dotycz\u0105ce identyfikacji, geometrii, materia\u0142u, w\u0142a\u015bciwo\u015bci u\u017cytkowych, zr\u00f3wnowa\u017conego rozwoju, monta\u017cu, koszt\u00f3w oraz cyklu \u017cycia w ramach zarz\u0105dzania obiektem (FM), przy czym ka\u017cda z tych kategorii powinna by\u0107 ustrukturyzowana z uwzgl\u0119dnieniem odpowiedniego typu parametru, jednostki miary oraz odniesienia do bada\u0144.<\/strong><\/p>\n<p>Od lat zajmuj\u0119 si\u0119 produkcj\u0105 pod\u0142\u00f3g PCV i ci\u0105gle natrafiam na ten sam problem. Model przedstawia p\u0142aski prostok\u0105t z opisem \u201epod\u0142oga winylowa\u201d \u2013 i nic wi\u0119cej. Potem pojawiaj\u0105 si\u0119 zapytania o informacje (RFI), proces zam\u00f3wie\u0144 si\u0119 wstrzymuje, a zespo\u0142y odpowiedzialne za obiekty otrzymuj\u0105 pod\u0142og\u0119 bez \u017cadnych danych dotycz\u0105cych konserwacji. Przydatny obiekt BIM to kontener danych, a nie tylko kszta\u0142t, i musi mie\u0107 zdefiniowan\u0105 struktur\u0119.<\/p>\n<p>Poni\u017cej przedstawiono, co powinien zawiera\u0107 ten kontener, jak go uporz\u0105dkowa\u0107 oraz w jaki spos\u00f3b odpowiada on otwartym standardom, takim jak IFC i COBie.<\/p>\n<h2>Dlaczego szczeg\u00f3\u0142owe dane maj\u0105 wi\u0119ksze znaczenie ni\u017c obiekty og\u00f3lne<\/h2>\n<p><strong>Generic flooring objects cause RFIs and procurement errors. The required data depth should follow the project&#8217;s information requirements and BIM Execution Plan, not a fixed LOD assumption.<\/strong><\/p>\n<p>A model with no product code, fire rating, or slip value forces every downstream team to chase missing specs manually. Rather than assuming a fixed LOD target, the model&#8217;s detail should match what the project&#8217;s exchange requirements actually demand at each stage \u2014 enough to support coordination, specification, and procurement by construction stage.<\/p>\n<h2>G\u0142\u00f3wne kategorie danych<\/h2>\n<p><strong>Dane BIM dotycz\u0105ce pod\u0142\u00f3g z PVC dziel\u0105 si\u0119 na siedem grup: geometria, materia\u0142\/produkt, w\u0142a\u015bciwo\u015bci u\u017cytkowe, zr\u00f3wnowa\u017cony rozw\u00f3j, monta\u017c, koszt oraz zarz\u0105dzanie obiektem\/cykl \u017cycia.<\/strong><\/p>\n<ul>\n<li><strong>Geometria:<\/strong> ca\u0142kowita grubo\u015b\u0107, wymiary desek\/p\u0142ytek lub szeroko\u015b\u0107 rolki, schemat uk\u0142adania, pod\u0142o\u017ce oraz szczeg\u00f3\u0142y dotycz\u0105ce przej\u015b\u0107. Modelowanie schematu u\u0142atwia koordynacj\u0119 rozplanowania, jednak rezerwa na odpady powinna pozosta\u0107 odr\u0119bn\u0105 pozycj\u0105 w zam\u00f3wieniu, poniewa\u017c rzeczywista ilo\u015b\u0107 odpad\u00f3w zale\u017cy od kszta\u0142tu pomieszczenia, planu \u0142\u0105czenia element\u00f3w oraz dopasowania partii, a nie wy\u0142\u0105cznie od geometrii.<\/li>\n<li><strong>Materia\u0142\/produkt:<\/strong> producent, kod produktu, rodzaj pod\u0142ogi (jednorodna, niejednorodna, LVT), kolor oraz pod\u0142o\u017ce. W przypadku pod\u0142\u00f3g niejednorodnych\/LVT nale\u017cy oddzielnie poda\u0107 grubo\u015b\u0107 warstwy u\u017cytkowej oraz ca\u0142kowit\u0105 grubo\u015b\u0107. W przypadku pod\u0142\u00f3g winylowych jednorodnych nale\u017cy poda\u0107 rodzaj konstrukcji, poniewa\u017c maj\u0105 one jednolit\u0105 grubo\u015b\u0107 na ca\u0142ej powierzchni.<\/li>\n<li><strong>Wydajno\u015b\u0107:<\/strong> odporno\u015b\u0107 na po\u015blizg, klasyfikacja ogniowa, w\u0142a\u015bciwo\u015bci akustyczne, odporno\u015b\u0107 na wgniecenia, odporno\u015b\u0107 chemiczna, dane dotycz\u0105ce lotnych zwi\u0105zk\u00f3w organicznych (VOC). Do ka\u017cdej warto\u015bci eksploatacyjnej nale\u017cy do\u0142\u0105czy\u0107 odpowiedni\u0105 metod\u0119 badawcz\u0105 i norm\u0119 \u2014 sama warto\u015b\u0107 DCOF lub R nie wystarczy, poniewa\u017c progi r\u00f3\u017cni\u0105 si\u0119 w zale\u017cno\u015bci od normy i klasyfikacji zastosowania.<\/li>\n<li><strong>Zr\u00f3wnowa\u017cony rozw\u00f3j:<\/strong> certyfikaty (FloorScore, EPD), zawarto\u015b\u0107 materia\u0142\u00f3w pochodz\u0105cych z recyklingu, okres gwarancji, zgodno\u015b\u0107 z regionalnymi przepisami.<\/li>\n<li><strong>Instalacja:<\/strong> rodzaj kleju, dopuszczalne warto\u015bci wilgotno\u015bci i r\u00f3wno\u015bci pod\u0142o\u017ca, metoda monta\u017cu, wymagania dotycz\u0105ce dylatacji.<\/li>\n<li><strong>Koszty\/Zaopatrzenie:<\/strong> koszt jednostkowy, dostawca i czas realizacji, a tak\u017ce limit odpad\u00f3w jako osobne pole.<\/li>\n<li><strong>FM\/Cykl \u017cycia:<\/strong> przewidywany okres eksploatacji, harmonogram konserwacji, cykl wymiany, numer identyfikacyjny zasobu w systemie CAFM\/CMMS, numer partii, data instalacji.<\/li>\n<\/ul>\n<p><img decoding=\"async\" src=\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-1-10.jpg&quot;\" alt=\"Kategorie danych dotycz\u0105cych pod\u0142\u00f3g z PVC\" \/><\/p>\n<h2>Pe\u0142na lista kontrolna parametr\u00f3w<\/h2>\n<p><strong>Funkcjonalna lista kontrolna musi zawiera\u0107 dla ka\u017cdego pola parametry, typ danych, jednostk\u0119 miary, status typu\/instancji oraz status \u201ewymagane\u201d lub \u201eopcjonalne\u201d.<\/strong><\/p>\n<table>\n<thead>\n<tr>\n<th>Kategoria<\/th>\n<th>Parametr<\/th>\n<th>Typ danych \/ Jednostka miary<\/th>\n<th>Typ lub instancja<\/th>\n<th>Wymagane<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>To\u017csamo\u015b\u0107<\/td>\n<td>Producent, kod produktu, rodzaj pod\u0142ogi, kod klasyfikacyjny<\/td>\n<td>Tekst<\/td>\n<td>Typ<\/td>\n<td>Wymagane<\/td>\n<\/tr>\n<tr>\n<td>Geometria<\/td>\n<td>Ca\u0142kowita grubo\u015b\u0107 (mm), warstwa u\u017cytkowa (mm), wymiary p\u0142ytek\/desek, szeroko\u015b\u0107 rolki<\/td>\n<td>Liczba\/Wymiar<\/td>\n<td>Typ<\/td>\n<td>Wymagane<\/td>\n<\/tr>\n<tr>\n<td>Geometria<\/td>\n<td>Schemat monta\u017cu, powierzchnia pokrycia (m\u00b2)<\/td>\n<td>Tekst\/Numer<\/td>\n<td>Instancja<\/td>\n<td>Zalecane<\/td>\n<\/tr>\n<tr>\n<td>Wydajno\u015b\u0107<\/td>\n<td>Warto\u015b\u0107 odporno\u015bci na po\u015blizg + metoda badania<\/td>\n<td>Liczba + tekst<\/td>\n<td>Typ<\/td>\n<td>Wymagane<\/td>\n<\/tr>\n<tr>\n<td>Wydajno\u015b\u0107<\/td>\n<td>Klasyfikacja ogniowa, redukcja ha\u0142asu uderzeniowego (dB), pozosta\u0142e wg\u0142\u0119bienie (mm)<\/td>\n<td>Tekst\/Numer<\/td>\n<td>Typ<\/td>\n<td>Wymagane\/Zalecane<\/td>\n<\/tr>\n<tr>\n<td>Zr\u00f3wnowa\u017cony rozw\u00f3j<\/td>\n<td>Certyfikat VOC, numer EPD, zawarto\u015b\u0107 materia\u0142\u00f3w pochodz\u0105cych z recyklingu (%), gwarancja (w latach)<\/td>\n<td>Tekst\/Numer<\/td>\n<td>Typ<\/td>\n<td>Zalecane<\/td>\n<\/tr>\n<tr>\n<td>Instalacja<\/td>\n<td>Rodzaj kleju, dopuszczalny poziom wilgotno\u015bci pod\u0142o\u017ca, metoda monta\u017cu<\/td>\n<td>Tekst\/Numer<\/td>\n<td>Typ<\/td>\n<td>Wymagane<\/td>\n<\/tr>\n<tr>\n<td>Koszt<\/td>\n<td>Koszt jednostkowy, czas realizacji, dopuszczalny poziom odpad\u00f3w (%)<\/td>\n<td>Liczba<\/td>\n<td>Instancja\/Typ<\/td>\n<td>Zalecane<\/td>\n<\/tr>\n<tr>\n<td>FM<\/td>\n<td>Przewidywany okres eksploatacji, harmonogram konserwacji (link), data monta\u017cu, numer partii, data wymiany<\/td>\n<td>Liczba\/Tekst\/Data<\/td>\n<td>Instancja<\/td>\n<td>Wymagane\/Zalecane<\/td>\n<\/tr>\n<tr>\n<td>Weryfikacja<\/td>\n<td>Korekta TDS, norma testowa, numer certyfikatu, data wyga\u015bni\u0119cia certyfikatu, data ostatniej aktualizacji danych<\/td>\n<td>Tekst\/Data<\/td>\n<td>Typ<\/td>\n<td>Zalecane<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><img decoding=\"async\" src=\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-3-9.jpg&quot;\" alt=\"Tabela kontrolna parametr\u00f3w BIM dla pod\u0142\u00f3g z PVC\" \/><\/p>\n<h2>Parametry typu a parametry instancji<\/h2>\n<p><strong>Dane typu opisuj\u0105 sam produkt; dane instancji opisuj\u0105 konkretny, zrealizowany przypadek tego produktu.<\/strong><\/p>\n<p>Producent, kod produktu, grubo\u015b\u0107 i klasa odporno\u015bci ogniowej nale\u017c\u0105 do poziomu \u201eTyp\u201d, poniewa\u017c ka\u017cda sztuka tego produktu ma t\u0119 sam\u0105 warto\u015b\u0107. Pomieszczenie\/strefa, ilo\u015b\u0107 zainstalowana, data instalacji i numer partii nale\u017c\u0105 do poziomu \u201eInstancja\u201d, poniewa\u017c dwa pomieszczenia wyposa\u017cone w identyczny produkt mog\u0105 mie\u0107 r\u00f3\u017cne daty instalacji lub numery partii. Mieszanie tych poziom\u00f3w jest jednym z najcz\u0119stszych b\u0142\u0119d\u00f3w w obiektach dostarczanych przez producent\u00f3w i utrudnia p\u00f3\u017aniejsze planowanie.<\/p>\n<h2>Konwersja do format\u00f3w IFC i openBIM<\/h2>\n<p><strong>Pod\u0142ogi z PVC s\u0105 zazwyczaj mapowane na element IfcCovering o typie PredefinedType \u201eFLOORING\u201d, przy u\u017cyciu standardowych zestaw\u00f3w w\u0142a\u015bciwo\u015bci oraz niestandardowego zestawu przeznaczonego na dane specyficzne dla danego producenta.<\/strong><\/p>\n<p>Some flooring-specific properties already exist in standard IFC property sets, while data like SKU, wear layer thickness, or certificate numbers usually needs a custom property set. buildingSMART&#8217;s Information Delivery Specification (IDS) can define which objects, classifications, properties, and units must exist in a model exchange, and can automatically check whether a delivered IFC model meets that requirement \u2014 useful for validating flooring data without manual review.<\/p>\n<h2>Przekazanie danych COBie i FM<\/h2>\n<p><strong>COBie dzieli dane dotycz\u0105ce pod\u0142\u00f3g na rekordy typu, komponentu, atrybutu i dokumentu, dzi\u0119ki czemu zespo\u0142y zarz\u0105dzaj\u0105ce obiektami mog\u0105 z nich korzysta\u0107 bez konieczno\u015bci otwierania modelu natywnego.<\/strong><\/p>\n<p>Type records carry product-level facts (manufacturer, spec); Component records carry instance-level facts (location, install date); Attribute records carry extra properties (warranty, fire rating); Document records link to files like EPDs or installation guides rather than embedding them. The exact fields required should be set by the asset owner&#8217;s information requirements, not assumed to be identical across every project.<\/p>\n<h2>Co pozostaje w modelu, a co powinno zawiera\u0107 linki zewn\u0119trzne<\/h2>\n<p><strong>Dane strukturalne o warto\u015bci pojedynczej (grubo\u015b\u0107, klasyfikacja, klasa odporno\u015bci ogniowej) powinny by\u0107 podane jako parametry. Pe\u0142ne dokumenty (instrukcje monta\u017cu, deklaracje \u015brodowiskowe EPD, pliki PDF z gwarancjami) powinny by\u0107 podane jako odno\u015bniki.<\/strong><\/p>\n<p>A simple rule: if a value drives a calculation, filter, or schedule, make it a parameter. If it&#8217;s a document someone needs to read, link it by URL or document ID instead of embedding it. This keeps file size manageable and keeps referenced documents current at the source.<\/p>\n<h2>R\u00f3\u017cne rodzaje pod\u0142\u00f3g z PVC wymagaj\u0105 r\u00f3\u017cnych parametr\u00f3w<\/h2>\n<p><strong>W przypadku posadzek heterogenicznych, homogenicznych, sportowych, ESD oraz LVT konieczne jest uwzgl\u0119dnienie dodatkowych element\u00f3w wykraczaj\u0105cych poza podstawow\u0105 list\u0119 kontroln\u0105.<\/strong><\/p>\n<table>\n<thead>\n<tr>\n<th>Typ produktu<\/th>\n<th>Dodatkowe parametry<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Arkusz heterogeniczny<\/td>\n<td>Warstwa u\u017cytkowa, pod\u0142o\u017ce, w\u0142a\u015bciwo\u015bci akustyczne<\/td>\n<\/tr>\n<tr>\n<td>Jednorodny<\/td>\n<td>Klasyfikacja konstrukcji\/spoiwa, obr\u00f3bka powierzchni<\/td>\n<\/tr>\n<tr>\n<td>Sportowe wyroby z PVC<\/td>\n<td>Amortyzacja, odkszta\u0142cenie pionowe, odbicie pi\u0142ki, tarcie<\/td>\n<\/tr>\n<tr>\n<td>PVC z ochron\u0105 przed wy\u0142adowaniami elektrostatycznymi (ESD)<\/td>\n<td>Rezystancja elektryczna, wymagania dotycz\u0105ce uziemienia<\/td>\n<\/tr>\n<tr>\n<td>LVT\/deski<\/td>\n<td>Wymiary desek, spos\u00f3b mocowania\/klejenia<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><img decoding=\"async\" src=\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-4-7.jpg&quot;\" alt=\"Parametry poszczeg\u00f3lnych produkt\u00f3w w podziale na rodzaje pod\u0142\u00f3g z PVC\" \/><\/p>\n<h2>Sprawdzanie aktualno\u015bci danych<\/h2>\n<p><strong>Track TDS revision, test standard, certificate number, expiry date, and last update date so specifiers aren&#8217;t working from outdated data.<\/strong><\/p>\n<p>Zdarza\u0142o mi si\u0119 widzie\u0107, jak zespo\u0142y przetargowe korzysta\u0142y ze starego obiektu BIM z wygas\u0142ym certyfikatem lub nieaktualn\u0105 kart\u0105 techniczn\u0105. Widoczna data aktualizacji i data wyga\u015bni\u0119cia pozwalaj\u0105 to natychmiast wykry\u0107, zamiast doprowadza\u0107 do odrzucenia wniosku podczas p\u00f3\u017aniejszej kontroli zgodno\u015bci.<\/p>\n<h2>Nazewnictwo i klasyfikacja<\/h2>\n<p><strong>Nale\u017cy stosowa\u0107 wsp\u00f3lne parametry, sp\u00f3jn\u0105 nomenklatur\u0119 oraz kod klasyfikacyjny (Uniclass\/OmniClass), aby dane zachowa\u0142y swoj\u0105 integralno\u015b\u0107 podczas wymiany mi\u0119dzy platformami.<\/strong><\/p>\n<p>&quot;WearLayer_mm&quot; in one object and &quot;Wear Layer Thickness&quot; in another won&#8217;t match automatically in a schedule or export. Consistent naming plus a classification code keeps data meaningful once it leaves its original Revit file.<\/p>\n<h2>Typowe b\u0142\u0119dy<\/h2>\n<ul>\n<li>Traktowanie modelu BIM wy\u0142\u0105cznie jako geometrii, pozostawiaj\u0105c pola dotycz\u0105ce wydajno\u015bci i koszt\u00f3w puste<\/li>\n<li>Niesp\u00f3jne nazewnictwo parametr\u00f3w w r\u00f3\u017cnych obiektach<\/li>\n<li>Mieszanie danych typu i instancji na niew\u0142a\u015bciwym poziomie<\/li>\n<li>Chasing a fixed LOD number instead of the project&#8217;s actual information requirement<\/li>\n<\/ul>\n<h2>\u201eMinimum\u201d a \u201egotowo\u015b\u0107 do spe\u0142nienia specyfikacji\u201d a \u201egotowo\u015b\u0107 do FM\u201d<\/h2>\n<p><strong>Nale\u017cy dostosowa\u0107 poziom szczeg\u00f3\u0142owo\u015bci danych do etapu projektu, zamiast \u0142adowa\u0107 wszystkie pola ju\u017c na wczesnym etapie projektowania.<\/strong><\/p>\n<ul>\n<li><strong>Minimum:<\/strong> to\u017csamo\u015b\u0107, geometria, podstawowe w\u0142a\u015bciwo\u015bci techniczne \u2014 wystarczaj\u0105ce do wczesnego umiejscowienia i wizualizacji.<\/li>\n<li><strong>Gotowe do specyfikacji:<\/strong> zawiera dane dotycz\u0105ce wydajno\u015bci wraz z metodami testowymi, certyfikatami zr\u00f3wnowa\u017conego rozwoju oraz wymaganiami instalacyjnymi \u2014 wystarczaj\u0105ce do udzia\u0142u w przetargu.<\/li>\n<li><strong>Obs\u0142uga FM:<\/strong> dodaje informacje o gwarancji, okresie eksploatacji, harmonogramie konserwacji, linki do dokument\u00f3w oraz dane instancji zgodne ze standardem COBie \u2014 wystarczaj\u0105ce do przekazania obiektu.<\/li>\n<\/ul>\n<p><img decoding=\"async\" src=\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-5-6.jpg&quot;\" alt=\"Poziomy szczeg\u00f3\u0142owo\u015bci danych BIM dotycz\u0105cych pod\u0142\u00f3g z PVC\" \/><\/p>\n<h2>Wnioski<\/h2>\n<p>Kompletny obiekt BIM dotycz\u0105cy pod\u0142\u00f3g z PVC musi zawiera\u0107 dane dotycz\u0105ce identyfikacji, geometrii, w\u0142a\u015bciwo\u015bci u\u017cytkowych, zr\u00f3wnowa\u017conego rozwoju, monta\u017cu, koszt\u00f3w oraz zarz\u0105dzania obiektem, kt\u00f3re powinny by\u0107 prawid\u0142owo uporz\u0105dkowane i zweryfikowane.<\/p>\n<p>If you&#8217;re building a custom or bulk PVC flooring BIM object and want to close any data gaps before production, feel free to send me a message.<\/p>","protected":false},"excerpt":{"rendered":"<p>A PVC flooring BIM model should include identity, geometry, material, performance, sustainability, installation, cost, and FM lifecycle data, each structured with the right parameter type, unit, and test reference. I have spent years on the manufacturing side of PVC flooring, and I see the same problem repeatedly. A model shows a flat rectangle labeled &quot;vinyl&#8230;<\/p>","protected":false},"author":4,"featured_media":9845,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[21],"tags":[],"class_list":["post-9838","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-pvc-floor-blog"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>What PVC Flooring Data Should a BIM Model Include - MF FLOOR<\/title>\n<meta name=\"description\" content=\"Learn what PVC flooring BIM data should include, from geometry and performance to IFC, COBie, installation, cost and FM data.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/meettfit.com\/pl\/blog-o-podlogach-pcv\/jakie-dane-dotyczace-podlog-z-pvc-powinien-zawierac-model-bim\/\" \/>\n<meta property=\"og:locale\" content=\"pl_PL\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"What PVC Flooring Data Should a BIM Model Include - MF FLOOR\" \/>\n<meta property=\"og:description\" content=\"Learn what PVC flooring BIM data should include, from geometry and performance to IFC, COBie, installation, cost and FM data.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/meettfit.com\/pl\/blog-o-podlogach-pcv\/jakie-dane-dotyczace-podlog-z-pvc-powinien-zawierac-model-bim\/\" \/>\n<meta property=\"og:site_name\" content=\"MF FLOOR\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/profile.php?id=100079773047357\" \/>\n<meta property=\"article:published_time\" content=\"2026-08-17T07:00:01+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2-10.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Leo\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Napisane przez\" \/>\n\t<meta name=\"twitter:data1\" content=\"Leo\" \/>\n\t<meta name=\"twitter:label2\" content=\"Szacowany czas czytania\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minut\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/\"},\"author\":{\"name\":\"Leo\",\"@id\":\"https:\/\/meettfit.com\/#\/schema\/person\/ba93f0ead95f571b725acc83f6544fef\"},\"headline\":\"What PVC Flooring Data Should a BIM Model Include\",\"datePublished\":\"2026-08-17T07:00:01+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/\"},\"wordCount\":1249,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/meettfit.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2-10.jpg\",\"articleSection\":[\"Vinyl Flooring Insights\"],\"inLanguage\":\"pl-PL\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/\",\"url\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/\",\"name\":\"What PVC Flooring Data Should a BIM Model Include - MF FLOOR\",\"isPartOf\":{\"@id\":\"https:\/\/meettfit.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2-10.jpg\",\"datePublished\":\"2026-08-17T07:00:01+00:00\",\"description\":\"Learn what PVC flooring BIM data should include, from geometry and performance to IFC, COBie, installation, cost and FM data.\",\"breadcrumb\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#breadcrumb\"},\"inLanguage\":\"pl-PL\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"pl-PL\",\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#primaryimage\",\"url\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2-10.jpg\",\"contentUrl\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2-10.jpg\",\"width\":800,\"height\":600,\"caption\":\"PVC Flooring (2)\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/meettfit.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"What PVC Flooring Data Should a BIM Model Include\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/meettfit.com\/#website\",\"url\":\"https:\/\/meettfit.com\/\",\"name\":\"MF FLOOR\",\"description\":\"fitness and sports floor China factory\",\"publisher\":{\"@id\":\"https:\/\/meettfit.com\/#organization\"},\"alternateName\":\"MF FLOOR\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/meettfit.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pl-PL\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/meettfit.com\/#organization\",\"name\":\"MF FLOOR\",\"alternateName\":\"MF FLOOR\",\"url\":\"https:\/\/meettfit.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pl-PL\",\"@id\":\"https:\/\/meettfit.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2025\/02\/cropped-icon.png\",\"contentUrl\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2025\/02\/cropped-icon.png\",\"width\":512,\"height\":512,\"caption\":\"MF FLOOR\"},\"image\":{\"@id\":\"https:\/\/meettfit.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/profile.php?id=100079773047357\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/meettfit.com\/#\/schema\/person\/ba93f0ead95f571b725acc83f6544fef\",\"name\":\"Leo\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pl-PL\",\"@id\":\"https:\/\/meettfit.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/848b16970688cfb2f4cc64e85a2e2233183d3242ed0a21ffa4c859df339031f6?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/848b16970688cfb2f4cc64e85a2e2233183d3242ed0a21ffa4c859df339031f6?s=96&d=mm&r=g\",\"caption\":\"Leo\"},\"url\":\"https:\/\/meettfit.com\/pl\/author\/1659230944qq-com\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"What PVC Flooring Data Should a BIM Model Include - MF FLOOR","description":"Learn what PVC flooring BIM data should include, from geometry and performance to IFC, COBie, installation, cost and FM data.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/meettfit.com\/pl\/blog-o-podlogach-pcv\/jakie-dane-dotyczace-podlog-z-pvc-powinien-zawierac-model-bim\/","og_locale":"pl_PL","og_type":"article","og_title":"What PVC Flooring Data Should a BIM Model Include - MF FLOOR","og_description":"Learn what PVC flooring BIM data should include, from geometry and performance to IFC, COBie, installation, cost and FM data.","og_url":"https:\/\/meettfit.com\/pl\/blog-o-podlogach-pcv\/jakie-dane-dotyczace-podlog-z-pvc-powinien-zawierac-model-bim\/","og_site_name":"MF FLOOR","article_publisher":"https:\/\/www.facebook.com\/profile.php?id=100079773047357","article_published_time":"2026-08-17T07:00:01+00:00","og_image":[{"width":800,"height":600,"url":"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2-10.jpg","type":"image\/jpeg"}],"author":"Leo","twitter_card":"summary_large_image","twitter_misc":{"Napisane przez":"Leo","Szacowany czas czytania":"7 minut"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#article","isPartOf":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/"},"author":{"name":"Leo","@id":"https:\/\/meettfit.com\/#\/schema\/person\/ba93f0ead95f571b725acc83f6544fef"},"headline":"What PVC Flooring Data Should a BIM Model Include","datePublished":"2026-08-17T07:00:01+00:00","mainEntityOfPage":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/"},"wordCount":1249,"commentCount":0,"publisher":{"@id":"https:\/\/meettfit.com\/#organization"},"image":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#primaryimage"},"thumbnailUrl":"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2-10.jpg","articleSection":["Vinyl Flooring Insights"],"inLanguage":"pl-PL","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/","url":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/","name":"What PVC Flooring Data Should a BIM Model Include - MF FLOOR","isPartOf":{"@id":"https:\/\/meettfit.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#primaryimage"},"image":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#primaryimage"},"thumbnailUrl":"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2-10.jpg","datePublished":"2026-08-17T07:00:01+00:00","description":"Learn what PVC flooring BIM data should include, from geometry and performance to IFC, COBie, installation, cost and FM data.","breadcrumb":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#breadcrumb"},"inLanguage":"pl-PL","potentialAction":[{"@type":"ReadAction","target":["https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/"]}]},{"@type":"ImageObject","inLanguage":"pl-PL","@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#primaryimage","url":"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2-10.jpg","contentUrl":"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2-10.jpg","width":800,"height":600,"caption":"PVC Flooring (2)"},{"@type":"BreadcrumbList","@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/meettfit.com\/"},{"@type":"ListItem","position":2,"name":"What PVC Flooring Data Should a BIM Model Include"}]},{"@type":"WebSite","@id":"https:\/\/meettfit.com\/#website","url":"https:\/\/meettfit.com\/","name":"MF FLOOR","description":"fitness and sports floor China factory","publisher":{"@id":"https:\/\/meettfit.com\/#organization"},"alternateName":"MF FLOOR","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/meettfit.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pl-PL"},{"@type":"Organization","@id":"https:\/\/meettfit.com\/#organization","name":"MF FLOOR","alternateName":"MF FLOOR","url":"https:\/\/meettfit.com\/","logo":{"@type":"ImageObject","inLanguage":"pl-PL","@id":"https:\/\/meettfit.com\/#\/schema\/logo\/image\/","url":"https:\/\/meettfit.com\/wp-content\/uploads\/2025\/02\/cropped-icon.png","contentUrl":"https:\/\/meettfit.com\/wp-content\/uploads\/2025\/02\/cropped-icon.png","width":512,"height":512,"caption":"MF FLOOR"},"image":{"@id":"https:\/\/meettfit.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/profile.php?id=100079773047357"]},{"@type":"Person","@id":"https:\/\/meettfit.com\/#\/schema\/person\/ba93f0ead95f571b725acc83f6544fef","name":"Leo","image":{"@type":"ImageObject","inLanguage":"pl-PL","@id":"https:\/\/meettfit.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/848b16970688cfb2f4cc64e85a2e2233183d3242ed0a21ffa4c859df339031f6?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/848b16970688cfb2f4cc64e85a2e2233183d3242ed0a21ffa4c859df339031f6?s=96&d=mm&r=g","caption":"Leo"},"url":"https:\/\/meettfit.com\/pl\/author\/1659230944qq-com\/"}]}},"_links":{"self":[{"href":"https:\/\/meettfit.com\/pl\/wp-json\/wp\/v2\/posts\/9838","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/meettfit.com\/pl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/meettfit.com\/pl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/meettfit.com\/pl\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/meettfit.com\/pl\/wp-json\/wp\/v2\/comments?post=9838"}],"version-history":[{"count":1,"href":"https:\/\/meettfit.com\/pl\/wp-json\/wp\/v2\/posts\/9838\/revisions"}],"predecessor-version":[{"id":9849,"href":"https:\/\/meettfit.com\/pl\/wp-json\/wp\/v2\/posts\/9838\/revisions\/9849"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/meettfit.com\/pl\/wp-json\/wp\/v2\/media\/9845"}],"wp:attachment":[{"href":"https:\/\/meettfit.com\/pl\/wp-json\/wp\/v2\/media?parent=9838"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/meettfit.com\/pl\/wp-json\/wp\/v2\/categories?post=9838"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/meettfit.com\/pl\/wp-json\/wp\/v2\/tags?post=9838"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}