{"id":10830,"date":"2026-11-06T18:30:42","date_gmt":"2026-11-06T10:30:42","guid":{"rendered":"https:\/\/meettfit.com\/?p=10830"},"modified":"2026-11-06T17:06:34","modified_gmt":"2026-11-06T09:06:34","slug":"what-belongs-in-esd-vinyl-flooring-as-built-drawings","status":"publish","type":"post","link":"https:\/\/meettfit.com\/id\/blog-lantai-pvc\/apa-saja-yang-harus-tercantum-dalam-gambar-as-built-lantai-vinil-esd\/","title":{"rendered":"Apa Saja yang Harus Tercantum dalam Gambar As-Built Lantai Vinyl ESD"},"content":{"rendered":"<p><strong>Gambar as-built lantai vinil ESD harus menampilkan tata letak pemasangan, zona lantai, sambungan pembumian, serta lokasi pengujian jika diperlukan. Catatan bahan, hasil pengujian lengkap, dan catatan pemeliharaan harus dimuat dalam dokumen serah terima yang terkait. Spesifikasi proyek menentukan ruang lingkup akhir.<\/strong><\/p>\n<p>Saya membagi informasi tersebut menjadi dua kelompok. Gambar as-built mencatat apa saja yang telah dipasang dan di mana lokasinya. Dokumen serah terima pendukung memuat rincian yang memerlukan ruang lebih luas, seperti data batch, hasil pengujian lengkap, dan petunjuk pembersihan. Nomor gambar atau ID lokasi menghubungkan keduanya.<\/p>\n<p>The table below shows how I usually divide the work. Your contract, the approved design, and the manufacturer&#8217;s instructions have the final say.<\/p>\n<table>\n<thead>\n<tr>\n<th>Apa yang Harus Direkam<\/th>\n<th>Ke Mana Arahnya<\/th>\n<th>Prioritas<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Identifikasi dan pengendalian gambar: nama proyek, nomor gambar, skala, tanggal, revisi, legenda, serta rincian persetujuan jika diperlukan<\/td>\n<td>Blok judul dan legenda<\/td>\n<td>Inti<\/td>\n<\/tr>\n<tr>\n<td>Batas ruangan dan zona lantai<\/td>\n<td>Denah lantai sesuai kondisi sebenarnya<\/td>\n<td>Inti<\/td>\n<\/tr>\n<tr>\n<td>Lokasi sebenarnya dari strip grounding, di tempat-tempat yang menggunakannya<\/td>\n<td>Pemasangan grounding sesuai kondisi aktual<\/td>\n<td>Inti<\/td>\n<\/tr>\n<tr>\n<td>Titik sambungan ke tanah dan ID-nya<\/td>\n<td>Pemasangan grounding sesuai kondisi aktual<\/td>\n<td>Inti<\/td>\n<\/tr>\n<tr>\n<td>Tata letak lantai dan sambungan utama<\/td>\n<td>Denah lantai sesuai kondisi sebenarnya<\/td>\n<td>Penting<\/td>\n<\/tr>\n<tr>\n<td>Jenis bahan dan identifikasi batch<\/td>\n<td>Daftar bahan atau indeks gambar<\/td>\n<td>Penting<\/td>\n<\/tr>\n<tr>\n<td>Lokasi ujian yang mewajibkan penyerahan dokumen<\/td>\n<td>Gambar lokasi pengujian<\/td>\n<td>Inti<\/td>\n<\/tr>\n<tr>\n<td>Hasil uji operasional<\/td>\n<td>Laporan pengujian terpisah<\/td>\n<td>Inti<\/td>\n<\/tr>\n<tr>\n<td>Rincian perimeter dan transisi<\/td>\n<td>Rincian pemasangan<\/td>\n<td>Per proyek<\/td>\n<\/tr>\n<tr>\n<td>Petunjuk pembersihan dan perawatan<\/td>\n<td>Panduan Pengoperasian dan Pemeliharaan<\/td>\n<td>Mendukung<\/td>\n<\/tr>\n<tr>\n<td>Riwayat revisi<\/td>\n<td>Blok judul dan catatan revisi<\/td>\n<td>Inti<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\"Inti\" berarti saya memeriksa hal-hal ini terlebih dahulu. Hal ini tidak berarti bahwa suatu standar mewajibkan setiap hal tersebut.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/11\/ESD-Flooring1-3.jpg&quot;\" alt=\"Denah lantai aktual lantai vinil ESD dengan zona bernomor, titik ground, dan legenda; hanya sebagai contoh\" \/><\/p>\n<h2>Detail tata letak apa saja yang harus ditampilkan dalam gambar as-built lantai ESD?<\/h2>\n<p><strong>Tunjukkan batas-batas ruangan, zona lantai, arah pemasangan, sambungan utama, hambatan tetap, dan setiap titik di mana lantai ESD bersinggungan dengan jenis lantai lainnya. Bandingkan tata letak tersebut dengan kondisi di lokasi sebelum Anda memastikannya.<\/strong><\/p>\n<p>Denah lantai merupakan dasar bagi semua catatan lainnya. Titik-titik pembumian, lokasi pengujian, dan area perbaikan semuanya mengacu pada denah tersebut. Kondisi di lapangan bisa berbeda dari desain awal, sehingga saya memverifikasi tata letak yang telah dipasang di lokasi dan memperbarui gambar desain untuk mencerminkan perubahan-perubahan relevan yang terjadi di lapangan. Saya menggunakan pengukuran lapangan jika diperlukan untuk menentukan lokasi komponen pembumian yang tersembunyi secara akurat. Saya tidak mengukur ulang setiap dimensi.<\/p>\n<p>Beberapa bagian perlu diberi tanda yang jelas. Tunjukkan arah gulungan atau ubin serta garis tengah awal, karena tim perbaikan memerlukan keduanya untuk menyesuaikan dengan pola aslinya. Tunjukkan hambatan tetap seperti pilar, kotak lantai, penutup parit, dan alas peralatan, agar orang-orang mengetahui di mana lantai dipotong atau diselesaikan di sekitarnya. Tandai rute sambungan utama dan persimpangannya, karena hal ini membantu tim merencanakan pemotongan dan penambalan.<\/p>\n<p>Titik peralihan perlu diberi label. Lantai ESD yang berakhir di ambang pintu bisa terlihat sama dengan yang berlanjut. Tandai garisnya dan beri nama jenis lantai di masing-masing sisi, baik itu vinil standar, epoksi, maupun lantai akses bertingkat.<\/p>\n<h2>Bagaimana Cara Mencatat Strip Arde dan Titik Sambungan?<\/h2>\n<p><strong>Record what was actually installed. That may include copper grounding strips, conductive adhesive, and numbered ground terminals. The layout depends on the approved design and the manufacturer&#8217;s instructions, so do not assume one standard grid.<\/strong><\/p>\n<p>Setiap sistem berbeda-beda. Ada yang menggunakan strip tembaga dengan jarak tertentu. Ada pula yang menggunakan sejumlah sambungan ground yang terbatas. Ada juga yang mengikuti metode lain yang ditetapkan oleh produsen. Gambar as-built harus menunjukkan komponen-komponen yang digunakan pada lantai ini, bukan tata letak umum dari proyek lain.<\/p>\n<table>\n<thead>\n<tr>\n<th>Elemen<\/th>\n<th>Apa yang Harus Direkam<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Strip pembumian, jika digunakan<\/td>\n<td>Rute dan jarak sebenarnya sesuai dengan yang dipasang<\/td>\n<\/tr>\n<tr>\n<td>Rincian sambungan pembumian<\/td>\n<td>Setiap terminal pembumian lantai, ID uniknya, susunan sambungannya, serta referensi pembumian yang disetujui atau gambar kelistrikan<\/td>\n<\/tr>\n<tr>\n<td>Zona<\/td>\n<td>Batas-batas zona pembumian terpisah, jika ditentukan dalam desain<\/td>\n<\/tr>\n<tr>\n<td>Peralatan pemantauan<\/td>\n<td>Di tempat-tempat di mana monitor atau kabel penghubung ke ground terpasang, jika digunakan<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Beberapa proyek menggunakan zona pembumian terpisah. Proyek lainnya memerlukan sambungan antara area. Desain sistem kelistrikan dan pengendalian ESD yang telah disetujui menentukan mana yang berlaku. Saya mencatat batas-batas dan pengaturan sambungan sesuai kondisi yang telah dibangun, serta merujuk pada gambar desain yang menjelaskan maksudnya. Saya tidak menambahkan isolasi atau sambungan secara sepihak.<\/p>\n<p>Jika tata letak sistem pembumian yang dipasang berbeda dari desain yang telah disetujui, catat kondisi aktualnya dan sampaikan penyimpangan tersebut kepada perancang atau insinyur yang bertanggung jawab untuk ditinjau. Setiap pekerjaan perbaikan yang diperlukan atau persetujuan resmi harus diselesaikan dan didokumentasikan sebelum serah terima akhir. Gambar as-built menunjukkan kondisi lapangan. Gambar tersebut tidak berarti menyetujui adanya perubahan.<\/p>\n<p>Gunakan ID yang sama untuk setiap titik ground pada gambar dan dalam laporan pengujian. Tandai strip yang tersembunyi dan titik sambungan dengan jelas. Tim yang memotong atau melepas lantai selama renovasi perlu mengetahui letak titik-titik tersebut.<\/p>\n<h2>Bagaimana Cara Menghubungkan Bahan, Batch, dan Rincian Pemasangan?<\/h2>\n<p><strong>Simpan data produk secara lengkap dalam catatan bahan dan tautkan ke gambar teknis. Jika lebih dari satu batch telah dipasang, tunjukkan batch mana yang dipasang di mana, atau cantumkan referensi ke catatan alokasi batch.<\/strong><\/p>\n<p>Daftar nomor batch saja tidak cukup untuk proyek berskala besar. Bayangkan sebuah pabrik dengan tiga zona dan dua batch produk. Jika berkas tersebut hanya mencantumkan dua nomor tersebut, tim perbaikan tetap tidak dapat mengetahui batch mana yang berada di area yang rusak. Batch produksi yang berbeda mungkin menunjukkan perbedaan warna atau sifat listrik yang diukur dalam batas toleransi produk, sehingga perbaikan yang sesuai memerlukan informasi mengenai batch asal.<\/p>\n<p>Catatan material harus memuat informasi mengenai produsen, lini produk, SKU atau model, serta kode warna. Catatan tersebut juga harus memuat nomor batch untuk setiap pengiriman beserta lokasi pemasangannya, nama produk perekat dan catatan cakupan jika disebutkan, serta kode warna batang las dan jenis materialnya. Simpanlah nota pengiriman, lembar data, dan petunjuk pemasangan bersama dengan catatan tersebut.<\/p>\n<p>Jenis perekat yang digunakan sangat penting. Dalam banyak sistem, perekat merupakan bagian dari jalur konduktif, sehingga penggunaan perekat yang berbeda pada perbaikan selanjutnya dapat mengubah hasilnya. Catatan sederhana pada gambar, seperti \"Alokasi batch: lihat Catatan Bahan MR-01\", membuat gambar tetap rapi dan memungkinkan detailnya tercantum dalam catatan tersebut.<\/p>\n<h2>Bagaimana Cara Menyebutkan Lokasi Pengujian dan Laporan Uji Coba?<\/h2>\n<p><strong>Apabila lokasi pengujian harus didokumentasikan, tandai area pengujian yang sebenarnya atau lokasi bernomor pada gambar dan hubungkan dengan laporan komisioning. Laporan tersebut memuat nilai pembacaan, metode, batas, dan hasil.<\/strong><\/p>\n<p>Gambar tersebut menunjukkan lokasi pelaksanaan setiap pengujian. Laporan tersebut menunjukkan apa saja yang diukur dan apakah hasilnya memenuhi persyaratan. Pengujian resistansi lantai umumnya mengacu pada ANSI\/ESD STM7.1. Jika program tersebut juga menggunakan sistem alas kaki dan lantai untuk pembumian personel, ANSI\/ESD STM97.1 dan STM97.2 mungkin berlaku, yang mencakup resistansi dan tegangan tubuh saat berjalan. Metode pengujian yang berlaku dan persyaratan proyek menentukan berapa banyak lokasi yang akan diuji serta cara memilihnya. Lokasi yang digunakan pada saat serah terima mungkin berbeda dengan lokasi yang digunakan untuk pemeriksaan berkala selanjutnya.<\/p>\n<table>\n<thead>\n<tr>\n<th>Item Laporan<\/th>\n<th>Catatan<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>ID Lokasi<\/td>\n<td>Cocokkan nomor ID pada gambar, seperti T-01, T-02, T-03<\/td>\n<\/tr>\n<tr>\n<td>Metode pengujian<\/td>\n<td>Sebutkan metode yang digunakan<\/td>\n<\/tr>\n<tr>\n<td>Batas penerimaan<\/td>\n<td>Sebutkan batasan-batasan yang digunakan sebagai acuan untuk memeriksa hasil tersebut<\/td>\n<\/tr>\n<tr>\n<td>Bacaan<\/td>\n<td>Nilai-nilai yang disyaratkan oleh metode tersebut<\/td>\n<\/tr>\n<tr>\n<td>Tanggal ujian<\/td>\n<td>Perlu memeriksa waktu tunggu dari produsen<\/td>\n<\/tr>\n<tr>\n<td>Alat-alat<\/td>\n<td>Model, status kalibrasi, dan rincian elektroda<\/td>\n<\/tr>\n<tr>\n<td>Ketentuan<\/td>\n<td>Suhu dan kelembapan relatif, karena kelembapan memengaruhi hasil pengukuran resistansi<\/td>\n<\/tr>\n<tr>\n<td>Hasil<\/td>\n<td>Lulus atau tidak lulus, serta bagaimana penanganan nilai yang tidak lulus<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Waktu pelaksanaannya perlu diperhatikan. Beberapa produsen menetapkan masa tunggu setelah pemasangan sebelum melakukan pengujian resistansi secara resmi. Hasil pengukuran yang diambil pada hari pemasangan ubin terakhir mungkin tidak dapat dijadikan acuan. Periksa petunjuk pemasangan dan cantumkan tanggal pengujian dalam laporan.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/11\/ESD-Flooring1-2.jpg&quot;\" alt=\"Lokasi pengujian bernomor yang terhubung dengan laporan serah terima, hanya sebagai contoh\" \/><\/p>\n<h2>Seperti apa bentuk kumpulan catatan yang saling terkait?<\/h2>\n<p><strong>Kumpulan yang terhubung menggunakan satu sistem ID untuk semua dokumen. Setiap ID pada gambar mengacu pada satu catatan, sehingga siapa pun dapat melacak titik di lapangan, lokasi pengujian, atau batch.<\/strong><\/p>\n<p>Contoh di bawah ini menggambarkan gagasan tersebut. Angka-angka tersebut hanyalah contoh. Angka-angka tersebut bukanlah persyaratan penomoran yang berlaku di industri.<\/p>\n<table>\n<thead>\n<tr>\n<th>Rekor<\/th>\n<th>Contoh ID<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Denah lantai<\/td>\n<td>ESD-FP-01<\/td>\n<\/tr>\n<tr>\n<td>Titik ground<\/td>\n<td>G-01<\/td>\n<\/tr>\n<tr>\n<td>Lokasi pengujian<\/td>\n<td>T-01<\/td>\n<\/tr>\n<tr>\n<td>Laporan Pengoperasian Awal<\/td>\n<td>TR-01<\/td>\n<\/tr>\n<tr>\n<td>Catatan bahan<\/td>\n<td>MR-01<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Dengan perangkat ini, seorang auditor dapat memulai dari titik dasar G-01 pada denah, menemukan T-01 di dekatnya, membuka TR-01 untuk pengukuran, dan membuka MR-01 untuk memeriksa batch tersebut. Proses ini hanya memakan waktu beberapa menit, dan tidak ada yang perlu menebak-nebak.<\/p>\n<h2>Bagaimana Cara Memelihara Dokumen As-Built Setelah Serah Terima?<\/h2>\n<p><strong>Perbarui gambar teknis apabila perbaikan atau perubahan memengaruhi tata letak yang tercatat, sambungan grounding, atau detail pemasangan lainnya. Sebaliknya, tambahkan hasil pengujian rutin ke dalam catatan pemeliharaan dan kepatuhan.<\/strong><\/p>\n<p>Mixing these two types of updates causes confusion. A yearly resistance check does not change the floor, so the drawing stays the same and the result goes into the compliance record. A new ground connection, a moved zone boundary, or an extension does change the floor, so the drawing needs a new revision. Small patches fall in between, and I follow the project&#8217;s document control rules for those. A change in approved cleaning products goes into the O&amp;M document.<\/p>\n<p>Catatan revisi harus mencantumkan tanggal, nama kontraktor, nama penandatangan, serta deskripsi singkat mengenai perubahan tersebut. Saya menganggapnya sebagai dokumen proyek yang terkelola. Dengan demikian, seorang insinyur fasilitas yang baru dapat mengetahui perubahan apa saja yang terjadi setelah serah terima tanpa perlu menebak-nebak.<\/p>\n<p>Sebelum melakukan renovasi apa pun, periksa tidak hanya gambar lantai saja. Garis penanda pondasi membantu tim pekerja menghindari kerusakan saat memotong atau melepas lantai. Pengeboran pada substrat merupakan hal yang terpisah. Bandingkan dengan gambar struktur dan gambar instalasi tertanam, karena tulangan, saluran pipa, dan kabel mungkin terdapat di dalam pelat lantai.<\/p>\n<h2>Kesimpulan<\/h2>\n<p>A good as-built package links the drawing, test locations, and handover records. Follow your project specification and the manufacturer&#8217;s instructions to set the final scope.<\/p>\n<p><strong>Sedang mengerjakan proyek lantai ESD dan bingung apa saja yang harus dimasukkan ke dalam dokumentasi Anda? Kirimkan pesan pribadi kepada saya untuk menanyakan hal tersebut.<\/strong><\/p>","protected":false},"excerpt":{"rendered":"<p>An ESD vinyl flooring as-built drawing should show the installed layout, floor zones, grounding connections, and test locations where required. Material records, full test readings, and maintenance notes belong in linked handover documents. The project specification sets the final scope. I split the information into two groups. The as-built drawings record what was installed and&#8230;<\/p>","protected":false},"author":4,"featured_media":10833,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[21],"tags":[],"class_list":["post-10830","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-pvc-floor-blog"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>What Belongs in ESD Vinyl Flooring As-Built Drawings - MF FLOOR<\/title>\n<meta name=\"description\" content=\"Learn what ESD flooring as-built drawings should include, from floor layouts and grounding points to test locations and handover records.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/meettfit.com\/id\/blog-lantai-pvc\/apa-saja-yang-harus-tercantum-dalam-gambar-as-built-lantai-vinil-esd\/\" \/>\n<meta property=\"og:locale\" content=\"id_ID\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"What Belongs in ESD Vinyl Flooring As-Built Drawings - MF FLOOR\" \/>\n<meta property=\"og:description\" content=\"Learn what ESD flooring as-built drawings should include, from floor layouts and grounding points to test locations and handover records.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/meettfit.com\/id\/blog-lantai-pvc\/apa-saja-yang-harus-tercantum-dalam-gambar-as-built-lantai-vinil-esd\/\" \/>\n<meta property=\"og:site_name\" content=\"MF FLOOR\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/profile.php?id=100079773047357\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-06T10:30:42+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/11\/ESD-Flooring1-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Leo\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Ditulis oleh\" \/>\n\t<meta name=\"twitter:data1\" content=\"Leo\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimasi waktu membaca\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 menit\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-belongs-in-esd-vinyl-flooring-as-built-drawings\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-belongs-in-esd-vinyl-flooring-as-built-drawings\/\"},\"author\":{\"name\":\"Leo\",\"@id\":\"https:\/\/meettfit.com\/#\/schema\/person\/ba93f0ead95f571b725acc83f6544fef\"},\"headline\":\"What Belongs in ESD Vinyl Flooring As-Built Drawings\",\"datePublished\":\"2026-11-06T10:30:42+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-belongs-in-esd-vinyl-flooring-as-built-drawings\/\"},\"wordCount\":1594,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/meettfit.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-belongs-in-esd-vinyl-flooring-as-built-drawings\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/11\/ESD-Flooring1-1.jpg\",\"articleSection\":[\"Vinyl Flooring Insights\"],\"inLanguage\":\"id\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/meettfit.com\/pvc-floor-blog\/what-belongs-in-esd-vinyl-flooring-as-built-drawings\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-belongs-in-esd-vinyl-flooring-as-built-drawings\/\",\"url\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-belongs-in-esd-vinyl-flooring-as-built-drawings\/\",\"name\":\"What Belongs in ESD Vinyl Flooring As-Built Drawings - MF FLOOR\",\"isPartOf\":{\"@id\":\"https:\/\/meettfit.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-belongs-in-esd-vinyl-flooring-as-built-drawings\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-belongs-in-esd-vinyl-flooring-as-built-drawings\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/11\/ESD-Flooring1-1.jpg\",\"datePublished\":\"2026-11-06T10:30:42+00:00\",\"description\":\"Learn what ESD flooring as-built drawings should include, from floor layouts and grounding points to test locations and handover records.\",\"breadcrumb\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-belongs-in-esd-vinyl-flooring-as-built-drawings\/#breadcrumb\"},\"inLanguage\":\"id\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/meettfit.com\/pvc-floor-blog\/what-belongs-in-esd-vinyl-flooring-as-built-drawings\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"id\",\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-belongs-in-esd-vinyl-flooring-as-built-drawings\/#primaryimage\",\"url\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/11\/ESD-Flooring1-1.jpg\",\"contentUrl\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/11\/ESD-Flooring1-1.jpg\",\"width\":800,\"height\":600,\"caption\":\"ESD Flooring1 (1)\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-belongs-in-esd-vinyl-flooring-as-built-drawings\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/meettfit.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"What Belongs in ESD Vinyl Flooring As-Built Drawings\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/meettfit.com\/#website\",\"url\":\"https:\/\/meettfit.com\/\",\"name\":\"MF FLOOR\",\"description\":\"fitness and sports floor China factory\",\"publisher\":{\"@id\":\"https:\/\/meettfit.com\/#organization\"},\"alternateName\":\"MF FLOOR\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/meettfit.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"id\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/meettfit.com\/#organization\",\"name\":\"MF FLOOR\",\"alternateName\":\"MF FLOOR\",\"url\":\"https:\/\/meettfit.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"id\",\"@id\":\"https:\/\/meettfit.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2025\/02\/cropped-icon.png\",\"contentUrl\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2025\/02\/cropped-icon.png\",\"width\":512,\"height\":512,\"caption\":\"MF FLOOR\"},\"image\":{\"@id\":\"https:\/\/meettfit.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/profile.php?id=100079773047357\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/meettfit.com\/#\/schema\/person\/ba93f0ead95f571b725acc83f6544fef\",\"name\":\"Leo\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"id\",\"@id\":\"https:\/\/meettfit.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/848b16970688cfb2f4cc64e85a2e2233183d3242ed0a21ffa4c859df339031f6?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/848b16970688cfb2f4cc64e85a2e2233183d3242ed0a21ffa4c859df339031f6?s=96&d=mm&r=g\",\"caption\":\"Leo\"},\"url\":\"https:\/\/meettfit.com\/id\/author\/1659230944qq-com\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"What Belongs in ESD Vinyl Flooring As-Built Drawings - MF FLOOR","description":"Learn what ESD flooring as-built drawings should include, from floor layouts and grounding points to test locations and handover records.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/meettfit.com\/id\/blog-lantai-pvc\/apa-saja-yang-harus-tercantum-dalam-gambar-as-built-lantai-vinil-esd\/","og_locale":"id_ID","og_type":"article","og_title":"What Belongs in ESD Vinyl Flooring As-Built Drawings - MF FLOOR","og_description":"Learn what ESD flooring as-built drawings should include, from floor layouts and grounding points to test locations and handover records.","og_url":"https:\/\/meettfit.com\/id\/blog-lantai-pvc\/apa-saja-yang-harus-tercantum-dalam-gambar-as-built-lantai-vinil-esd\/","og_site_name":"MF FLOOR","article_publisher":"https:\/\/www.facebook.com\/profile.php?id=100079773047357","article_published_time":"2026-11-06T10:30:42+00:00","og_image":[{"width":800,"height":600,"url":"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/11\/ESD-Flooring1-1.jpg","type":"image\/jpeg"}],"author":"Leo","twitter_card":"summary_large_image","twitter_misc":{"Ditulis oleh":"Leo","Estimasi waktu membaca":"1 menit"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-belongs-in-esd-vinyl-flooring-as-built-drawings\/#article","isPartOf":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-belongs-in-esd-vinyl-flooring-as-built-drawings\/"},"author":{"name":"Leo","@id":"https:\/\/meettfit.com\/#\/schema\/person\/ba93f0ead95f571b725acc83f6544fef"},"headline":"What Belongs in ESD Vinyl Flooring As-Built Drawings","datePublished":"2026-11-06T10:30:42+00:00","mainEntityOfPage":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-belongs-in-esd-vinyl-flooring-as-built-drawings\/"},"wordCount":1594,"commentCount":0,"publisher":{"@id":"https:\/\/meettfit.com\/#organization"},"image":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-belongs-in-esd-vinyl-flooring-as-built-drawings\/#primaryimage"},"thumbnailUrl":"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/11\/ESD-Flooring1-1.jpg","articleSection":["Vinyl Flooring Insights"],"inLanguage":"id","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/meettfit.com\/pvc-floor-blog\/what-belongs-in-esd-vinyl-flooring-as-built-drawings\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-belongs-in-esd-vinyl-flooring-as-built-drawings\/","url":"https:\/\/meettfit.com\/pvc-floor-blog\/what-belongs-in-esd-vinyl-flooring-as-built-drawings\/","name":"What Belongs in ESD Vinyl Flooring As-Built Drawings - MF FLOOR","isPartOf":{"@id":"https:\/\/meettfit.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-belongs-in-esd-vinyl-flooring-as-built-drawings\/#primaryimage"},"image":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-belongs-in-esd-vinyl-flooring-as-built-drawings\/#primaryimage"},"thumbnailUrl":"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/11\/ESD-Flooring1-1.jpg","datePublished":"2026-11-06T10:30:42+00:00","description":"Learn what ESD flooring as-built drawings should include, from floor layouts and grounding points to test locations and handover records.","breadcrumb":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-belongs-in-esd-vinyl-flooring-as-built-drawings\/#breadcrumb"},"inLanguage":"id","potentialAction":[{"@type":"ReadAction","target":["https:\/\/meettfit.com\/pvc-floor-blog\/what-belongs-in-esd-vinyl-flooring-as-built-drawings\/"]}]},{"@type":"ImageObject","inLanguage":"id","@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-belongs-in-esd-vinyl-flooring-as-built-drawings\/#primaryimage","url":"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/11\/ESD-Flooring1-1.jpg","contentUrl":"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/11\/ESD-Flooring1-1.jpg","width":800,"height":600,"caption":"ESD Flooring1 (1)"},{"@type":"BreadcrumbList","@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-belongs-in-esd-vinyl-flooring-as-built-drawings\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/meettfit.com\/"},{"@type":"ListItem","position":2,"name":"What Belongs in ESD Vinyl Flooring As-Built Drawings"}]},{"@type":"WebSite","@id":"https:\/\/meettfit.com\/#website","url":"https:\/\/meettfit.com\/","name":"MF FLOOR","description":"fitness and sports floor China factory","publisher":{"@id":"https:\/\/meettfit.com\/#organization"},"alternateName":"MF FLOOR","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/meettfit.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"id"},{"@type":"Organization","@id":"https:\/\/meettfit.com\/#organization","name":"MF FLOOR","alternateName":"MF FLOOR","url":"https:\/\/meettfit.com\/","logo":{"@type":"ImageObject","inLanguage":"id","@id":"https:\/\/meettfit.com\/#\/schema\/logo\/image\/","url":"https:\/\/meettfit.com\/wp-content\/uploads\/2025\/02\/cropped-icon.png","contentUrl":"https:\/\/meettfit.com\/wp-content\/uploads\/2025\/02\/cropped-icon.png","width":512,"height":512,"caption":"MF FLOOR"},"image":{"@id":"https:\/\/meettfit.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/profile.php?id=100079773047357"]},{"@type":"Person","@id":"https:\/\/meettfit.com\/#\/schema\/person\/ba93f0ead95f571b725acc83f6544fef","name":"Leo","image":{"@type":"ImageObject","inLanguage":"id","@id":"https:\/\/meettfit.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/848b16970688cfb2f4cc64e85a2e2233183d3242ed0a21ffa4c859df339031f6?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/848b16970688cfb2f4cc64e85a2e2233183d3242ed0a21ffa4c859df339031f6?s=96&d=mm&r=g","caption":"Leo"},"url":"https:\/\/meettfit.com\/id\/author\/1659230944qq-com\/"}]}},"_links":{"self":[{"href":"https:\/\/meettfit.com\/id\/wp-json\/wp\/v2\/posts\/10830","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/meettfit.com\/id\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/meettfit.com\/id\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/meettfit.com\/id\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/meettfit.com\/id\/wp-json\/wp\/v2\/comments?post=10830"}],"version-history":[{"count":1,"href":"https:\/\/meettfit.com\/id\/wp-json\/wp\/v2\/posts\/10830\/revisions"}],"predecessor-version":[{"id":10847,"href":"https:\/\/meettfit.com\/id\/wp-json\/wp\/v2\/posts\/10830\/revisions\/10847"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/meettfit.com\/id\/wp-json\/wp\/v2\/media\/10833"}],"wp:attachment":[{"href":"https:\/\/meettfit.com\/id\/wp-json\/wp\/v2\/media?parent=10830"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/meettfit.com\/id\/wp-json\/wp\/v2\/categories?post=10830"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/meettfit.com\/id\/wp-json\/wp\/v2\/tags?post=10830"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}