{"id":10738,"date":"2026-10-29T15:00:53","date_gmt":"2026-10-29T07:00:53","guid":{"rendered":"https:\/\/meettfit.com\/?p=10738"},"modified":"2026-10-29T10:54:35","modified_gmt":"2026-10-29T02:54:35","slug":"how-should-pvc-sheet-flooring-be-quantified-in-a-boq","status":"publish","type":"post","link":"https:\/\/meettfit.com\/id\/blog-lantai-pvc\/how-should-pvc-sheet-flooring-be-quantified-in-a-boq\/","title":{"rendered":"Bagaimana Cara Menghitung Kebutuhan Lantai Lembaran PVC dalam Daftar Kuantitas (BOQ)?"},"content":{"rendered":"<p><strong>Measure PVC sheet flooring in square meters (m\u00b2) of net installed area, following the measurement standard in your contract. Measure accessories such as cove formers and capping strips in linear meters (lm). Calculate the order quantity separately from the BOQ quantity.<\/strong><\/p>\n<p>I have worked on PVC sheet flooring projects for hospitals, schools, labs and sports halls. The same problem appears on many of them. The BOQ says &quot;supply and install PVC sheet flooring&quot; and nothing more. Each bidder then prices a different scope. One adds waste to the area. One leaves out the subfloor prep. One forgets the coved skirting.<\/p>\n<p>A clear BOQ line fixes this before the tender goes out. It gives the QS, the estimator and the contractor one number and one scope. In this article, I explain how I measure the net area, how I plan the order quantity, and how I write the description. I also show a sample BOQ and the mistakes I see most often on site. Keep in mind that measurement rules change from one standard and one country to another. Your contract always has the final word.<\/p>\n<p>The first thing to settle is the unit, because the rest depends on it.<\/p>\n<h2>What Unit Should You Use to Measure PVC Sheet Flooring in a BOQ?<\/h2>\n<p><strong>Use square meters (m\u00b2) for the flooring itself. Use linear meters (lm) for skirtings, cove formers, capping strips and transition strips. Use rolls only for buying and logistics, not for BOQ billing.<\/strong><\/p>\n<p>The unit tells the bidder what to price, so it must match how the work is paid for. This is how I usually split the items:<\/p>\n<table>\n<thead>\n<tr>\n<th>Item<\/th>\n<th>Typical BOQ Unit<\/th>\n<th>Catatan<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Lantai lembaran PVC<\/td>\n<td>m\u00b2<\/td>\n<td>Net installed area<\/td>\n<\/tr>\n<tr>\n<td>Integral coved skirting (sheet turned up the wall)<\/td>\n<td>lm<\/td>\n<td>State the height and what the rate includes<\/td>\n<\/tr>\n<tr>\n<td>Pembentuk teluk<\/td>\n<td>lm<\/td>\n<td>Accessory, separate from the sheet<\/td>\n<\/tr>\n<tr>\n<td>Strip penutup<\/td>\n<td>lm<\/td>\n<td>Aksesori<\/td>\n<\/tr>\n<tr>\n<td>Door transition strip<\/td>\n<td>lm<\/td>\n<td>Aksesori<\/td>\n<\/tr>\n<tr>\n<td>Gulungan<\/td>\n<td>Roll<\/td>\n<td>Buying and logistics only<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3>Net Installed Area and Contract Rules<\/h3>\n<p>PVC sheet flooring is generally measured by the net installed area under the measurement standard used in the contract. Cutting waste, seam trimming and buying allowances are normally part of the contractor&#8217;s unit rate. They are not added to the measured floor area.<\/p>\n<p>Some contracts set up a different commercial deal. For example, a client may agree to pay a stated allowance for waste. This is possible, but the contract must define it clearly. When the BOQ is silent, I have seen bidders price the same floor several percent apart, simply because each one assumed a different rule.<\/p>\n<p>Once the unit is clear, the next job is to get the net area right.<\/p>\n<h2>How Do You Calculate the Net Area of PVC Sheet Flooring?<\/h2>\n<p><strong>Multiply length by width for each room, measured on the latest architectural drawings. Add or deduct columns, openings, alcoves and door reveals as the contract measurement rules say. Total the areas by floor and by product type.<\/strong><\/p>\n<p>Net takeoff is the base of the whole BOQ. If this figure is wrong, the price will be wrong too. I follow the same order on every project.<\/p>\n<h3>Step 1: Take the Room Dimensions<\/h3>\n<p>Use the latest architectural drawings and finishes schedule. The structural drawings alone are not enough, because wall finishes change the clear floor size. For a rectangular room, the formula is simple:<\/p>\n<p><strong>Area (m\u00b2) = Length (m) \u00d7 Width (m)<\/strong><\/p>\n<h3>Step 2: Split Irregular Rooms<\/h3>\n<p>Break an irregular room into simple blocks. Calculate each block and add the results. This method is easy to check, and it is easy to explain if a dispute starts later.<\/p>\n<h3>Step 3: Treat Voids and Additions by the Rules<\/h3>\n<table>\n<thead>\n<tr>\n<th>Fitur<\/th>\n<th>Apa yang Harus Diperiksa<\/th>\n<th>Di Mana Harus Mencari<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Columns and pillars<\/td>\n<td>Is there a deduction limit?<\/td>\n<td>The adopted measurement standard<\/td>\n<\/tr>\n<tr>\n<td>Openings and voids<\/td>\n<td>Deduct, or ignore below a set size?<\/td>\n<td>The adopted measurement standard<\/td>\n<\/tr>\n<tr>\n<td>Alcoves and recesses<\/td>\n<td>Measured to the back of the recess?<\/td>\n<td>The drawings and the standard<\/td>\n<\/tr>\n<tr>\n<td>Door reveals<\/td>\n<td>Does the flooring run under the door?<\/td>\n<td>The specification<\/td>\n<\/tr>\n<tr>\n<td>Fixed built-in furniture<\/td>\n<td>Measured or not measured?<\/td>\n<td>The BOQ preamble<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>I do not apply one fixed deduction limit to every job. Different standards treat voids in different ways. I read the rules in the contract first, then I write the chosen rule into the BOQ preamble. The reader should never have to guess.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/10\/Vinyl-Flooring-8-1.png&quot;\" alt=\"Irregular room layout with columns and alcoves marked for PVC flooring takeoff\" \/><\/p>\n<p>Net area tells you what the client pays for. It does not tell you how much material to order.<\/p>\n<h2>What Is the Difference Between BOQ Quantity and Order Quantity?<\/h2>\n<p><strong>The BOQ quantity is the net installed area used for pricing and payment. The order quantity is the material you must buy to install that area, including seam trimming, end cuts, pattern matching and unusable offcuts.<\/strong><\/p>\n<p>Many errors start when someone uses the BOQ area as the order area. PVC sheet comes in rolls, and the common roll width is around 2 m. Rooms are rarely a neat multiple of that width, so the plan matters more than any single percentage.<\/p>\n<h3>Why I Do Not Use One Flat Waste Figure<\/h3>\n<p>A flat percentage looks easy, but it hides the real drivers. I calculate the order quantity from a laying plan. These are the inputs:<\/p>\n<table>\n<thead>\n<tr>\n<th>Input<\/th>\n<th>Mengapa Ini Penting<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Lebar gulungan<\/td>\n<td>Sets how many lengths a room needs<\/td>\n<\/tr>\n<tr>\n<td>Cut length per room<\/td>\n<td>Sets the end cuts<\/td>\n<\/tr>\n<tr>\n<td>Seam positions<\/td>\n<td>Affect trimming and where offcuts fall<\/td>\n<\/tr>\n<tr>\n<td>Pattern repeat and direction<\/td>\n<td>Can force extra length so the pattern lines up<\/td>\n<\/tr>\n<tr>\n<td>Offcut reuse<\/td>\n<td>A leftover piece may fit in another room, or it may not<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Here is a simple case. A corridor is 1.1 m wide and a roll is 2 m wide. The corridor uses a little over half the roll width. Whether the other half is wasted depends on whether it can be used somewhere else on the same floor. A good layout can reduce the loss. A poor one can push it well above what people expect.<\/p>\n<h3>How I Write This in the BOQ<\/h3>\n<p>The BOQ keeps the net area. The contractor prices the waste inside the unit rate. I add one clear line to the preamble, for example: &quot;Measured quantities are net installed areas. Rates include all cutting, laps, trimming and waste.&quot; My own planning figures are only a first estimate, so I check them against the real laying plan before ordering.<\/p>\n<p>Seams and patterns are the next factors that change the order quantity.<\/p>\n<h2>How Do Seams and Patterns Affect PVC Sheet Flooring Material Use?<\/h2>\n<p><strong>Seams need extra material for edge trimming and end cuts. Patterned products can need more length so the design lines up across each seam. The exact allowance depends on the product and the manufacturer&#8217;s installation instructions.<\/strong><\/p>\n<p>Every seam needs a clean, trimmed edge. The installer must have enough sheet to overlap, cut and finish the joint. The amount depends on the product, the seam-cutting method and the site layout. I do not quote one number for all jobs. I follow the flooring manufacturer&#8217;s installation instructions and ask the installer before I confirm the order.<\/p>\n<h3>Seam Treatment Depends on the Product<\/h3>\n<p>Heat welding is common in healthcare and commercial areas, because a welded seam gives a sealed, hygienic joint. But it is not the only method. Some products allow other approved seam treatments. The specification and the manufacturer&#8217;s data sheet decide which one applies. Always state the required seam treatment in the BOQ so that bidders price the same method.<\/p>\n<h3>Pattern Repeat<\/h3>\n<p>A patterned sheet has a repeat length. This is the distance before the design starts again. To match the pattern at a seam, the installer may need to move the next length forward. The cut piece is then lost.<\/p>\n<table>\n<thead>\n<tr>\n<th>Jenis Produk<\/th>\n<th>Effect on Material Use<\/th>\n<th>How to Check<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Plain or speckled<\/td>\n<td>Usually low<\/td>\n<td>Product data sheet<\/td>\n<\/tr>\n<tr>\n<td>Wood-grain<\/td>\n<td>Depends on the repeat<\/td>\n<td>Repeat length in the data sheet<\/td>\n<\/tr>\n<tr>\n<td>Large geometric design<\/td>\n<td>Often high<\/td>\n<td>Repeat length and layout plan<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>I read the repeat length before I give a quote. This is a good point for early talks between the design team and the manufacturer.<\/p>\n<p>Seams are one part of the finish. The wall junction is another, and it is often measured wrongly.<\/p>\n<h2>How Do You Measure Integral Coved Skirting and Cove Formers?<\/h2>\n<p><strong>Integral coved skirting is the flooring sheet turned up the wall. A cove former is the support strip behind the turned-up sheet. They are different items, so the BOQ must say what each one includes and avoid double pricing.<\/strong><\/p>\n<p>This is one of the most common sources of missing or doubled costs. In hospitals and labs, the sheet often runs up the wall to form a sealed skirting. That turned-up part uses sheet material and needs extra labor. It is not just an accessory.<\/p>\n<h3>Two Items, Two Jobs<\/h3>\n<table>\n<thead>\n<tr>\n<th>Item<\/th>\n<th>Apa Itu<\/th>\n<th>Common Measurement<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Integral coved skirting<\/td>\n<td>Sheet material turned up the wall<\/td>\n<td>lm, with the height stated<\/td>\n<\/tr>\n<tr>\n<td>Pembentuk teluk<\/td>\n<td>Support strip at the floor and wall junction<\/td>\n<td>lm<\/td>\n<\/tr>\n<tr>\n<td>Strip penutup<\/td>\n<td>Finishing strip at the top edge<\/td>\n<td>lm<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3>What to State in the BOQ<\/h3>\n<p>For the coved skirting, write the height, for example 100 mm. Then say whether the rate includes the sheet material and the labor. If the sheet is already counted in the m\u00b2 area, say so. If it is counted in the lm rate, say that instead. The choice should follow the measurement standard in your contract. I only care that the same material is never priced twice and never left out.<\/p>\n<p>I also write which accessories are included in which line. A short note in the description is enough. This small step has saved me many hours of talks at final account stage.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/10\/Vinyl-Flooring-7-1.png&quot;\" alt=\"Integral coved skirting with cove former and capping strip detail\" \/><\/p>\n<p>With the measuring rules clear, the next step is to write the description.<\/p>\n<h2>What Should a Complete PVC Sheet Flooring BOQ Description Include?<\/h2>\n<p><strong>A complete BOQ item states the thickness, wear performance, slip and fire requirements, subfloor prep, installation method, seam treatment and finishing details. &quot;Supply and install PVC sheet flooring&quot; is never enough.<\/strong><\/p>\n<p>A short description invites different prices. A full description gives each bidder the same job. I write the item in four parts.<\/p>\n<h3>Spesifikasi Bahan<\/h3>\n<table>\n<thead>\n<tr>\n<th>Properti<\/th>\n<th>What to State<\/th>\n<th>Catatan<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Ketebalan total<\/td>\n<td>In mm, e.g. 2.0 mm or 3.0 mm<\/td>\n<td>Match the use of the room<\/td>\n<\/tr>\n<tr>\n<td>Wear performance<\/td>\n<td>The applicable wear classification and, for heterogeneous products, the wear-layer thickness<\/td>\n<td>Specify according to the relevant product standard<\/td>\n<\/tr>\n<tr>\n<td>Resistensi slip<\/td>\n<td>Required class and test method<\/td>\n<td>Follow the local code<\/td>\n<\/tr>\n<tr>\n<td>Kinerja terhadap api<\/td>\n<td>Required class and test method<\/td>\n<td>Follow the local code<\/td>\n<\/tr>\n<tr>\n<td>Jenis produk<\/td>\n<td>Homogeneous or heterogeneous<\/td>\n<td>Per the project need<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Homogeneous and heterogeneous products are not specified in the same way. A heterogeneous sheet has a distinct wear layer, so its thickness is a useful figure. A homogeneous sheet has the same material through its full depth, so it is usually described by its total thickness and wear classification instead. A rating without a test method is hard to check on site. I always ask for both.<\/p>\n<h3>Persiapan Subfloor<\/h3>\n<p>This is the hidden cost. I list it as a separate item whenever I can:<\/p>\n<ul>\n<li>Grinding and patching of the concrete<\/li>\n<li>Cleaning and dust removal<\/li>\n<li>Self-leveling compound (SLC), with the average thickness stated<\/li>\n<li>Primer or moisture barrier<\/li>\n<\/ul>\n<p>Moisture is a major risk. A damp slab can lift the adhesive and bubble the sheet. I ask for a moisture test before laying starts, and I follow the adhesive and flooring manufacturer&#8217;s limits.<\/p>\n<h3>Installation and Finishing<\/h3>\n<p>Specify the installation method required for the selected PVC sheet flooring system. Full adhesion with a manufacturer-approved adhesive is the most common choice. Some systems allow another manufacturer-approved method, such as tape fixing, so the BOQ should name the one that applies. State the seam treatment required by the product and the project. List the coved skirting, cove former, capping strip and door transition strips as separate lines.<\/p>\n<h3>A Sample BOQ Layout<\/h3>\n<p>This table is only an example of a pricing structure for a fully adhered project. It is not a required format for every contract. Follow the standard in your own contract.<\/p>\n<table>\n<thead>\n<tr>\n<th>BOQ Description<\/th>\n<th>Unit<\/th>\n<th>Jumlah<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Supply and install 2 mm commercial PVC sheet flooring, fully adhered with manufacturer-approved adhesive<\/td>\n<td>m\u00b2<\/td>\n<td>500<\/td>\n<\/tr>\n<tr>\n<td>Integral coved skirting, 100 mm high, including associated sheet material<\/td>\n<td>lm<\/td>\n<td>180<\/td>\n<\/tr>\n<tr>\n<td>Pembentuk teluk<\/td>\n<td>lm<\/td>\n<td>180<\/td>\n<\/tr>\n<tr>\n<td>Strip penutup<\/td>\n<td>lm<\/td>\n<td>180<\/td>\n<\/tr>\n<tr>\n<td>Door transition strips<\/td>\n<td>lm<\/td>\n<td>12<\/td>\n<\/tr>\n<tr>\n<td>Subfloor smoothing compound, specified average thickness<\/td>\n<td>m\u00b2<\/td>\n<td>500<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Whether each line stands alone should follow the measurement standard you use. The key point is that no accessory or labor item is priced twice.<\/p>\n<p>Even with a good description, some mistakes keep coming back.<\/p>\n<h2>What Are the Biggest Pitfalls When Quantifying PVC Sheet Flooring?<\/h2>\n<p><strong>The biggest pitfalls are mixing the BOQ quantity with the order quantity, missing accessories, ignoring subfloor condition and leaving measurement rules unstated. Each one causes cost gaps or disputes, and each one can be fixed in the BOQ.<\/strong><\/p>\n<p>I have seen all four on real projects.<\/p>\n<h3>Pitfall 1: Using the BOQ Area as the Order Area<\/h3>\n<p>The net area is not the amount of sheet you buy. Seams, end cuts and offcuts all use material. Build the order quantity from a laying plan.<\/p>\n<h3>Pitfall 2: Forgetting Ancillary Items<\/h3>\n<p>Cove formers, capping strips, transition strips and welding rods are easy to miss. A large hospital or school can need thousands of linear meters. Give each accessory its own line, or state clearly which line includes it.<\/p>\n<h3>Pitfall 3: Overlooking Subfloor Condition<\/h3>\n<p>Many teams assume the slab is ready. Often it is not. A rough or uneven slab needs grinding or leveling first. If the BOQ is silent, the contractor will claim this as a variation later. Do a site survey early and bill the prep as a separate item, even if only as a provisional quantity.<\/p>\n<h3>Pitfall 4: Unclear Measurement Rules<\/h3>\n<p>Should the floor under a fixed kitchen island or lab bench be measured? Different people answer differently.<\/p>\n<table>\n<thead>\n<tr>\n<th>Situasi<\/th>\n<th>Risk if Not Stated<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Under fixed built-in furniture<\/td>\n<td>Dispute over area<\/td>\n<\/tr>\n<tr>\n<td>Columns and large voids<\/td>\n<td>Over or under pricing<\/td>\n<\/tr>\n<tr>\n<td>Integral coved skirting<\/td>\n<td>Double pricing or missing cost<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Write each rule in the preamble. One sentence now saves a long meeting later.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/10\/Vinyl-Flooring-6-3.png&quot;\" alt=\"Common BOQ mistakes for PVC sheet flooring\" \/><\/p>\n<p>The last topic is what happens after the BOQ is issued.<\/p>\n<h2>How Do You Handle Drawing Changes and Final Quantities?<\/h2>\n<p><strong>Check the BOQ against the approved drawings, record changes, and remeasure completed work where the contract requires it. Final payment may be based on agreed quantities, approved variations or actual measured work, depending on the contract terms.<\/strong><\/p>\n<p>Drawings change during a project. Walls move, rooms are added, and finishes are swapped. Each change can alter the flooring area, the seam layout and the accessory lengths. If nobody tracks these changes, the final account turns into an argument.<\/p>\n<h3>What I Do on Every Project<\/h3>\n<table>\n<thead>\n<tr>\n<th>Panggung<\/th>\n<th>Tindakan<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Before tender<\/td>\n<td>Cross-check tender drawings, finishes schedules and specifications<\/td>\n<\/tr>\n<tr>\n<td>After award<\/td>\n<td>Confirm the laying plan and the seam layout with the installer<\/td>\n<\/tr>\n<tr>\n<td>During work<\/td>\n<td>Record every drawing revision that touches the floor<\/td>\n<\/tr>\n<tr>\n<td>Setelah selesai<\/td>\n<td>Verify completed quantities and assess variations according to the contract<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3>Why This Matters for Cost<\/h3>\n<p>Contract type changes how the final account works. A fixed-price contract and a remeasurement contract settle in different ways. Read the contract before you decide how to handle a change. Do not assume that every job is remeasured at the end.<\/p>\n<p>A change in the room shape can change the number of rolls, not only the m\u00b2. A small area added to a corridor can need a whole new length of sheet. The contractor must understand this cost effect early. A short talk with the manufacturer at design stage often finds a cheaper layout before the change goes to site.<\/p>\n<p>I also keep a simple log of measured areas per room. It makes the final account fast, and it makes any claim easy to check.<\/p>\n<p>Some questions come up on almost every job, so I answer them here.<\/p>\n<h2>Pertanyaan yang Sering Diajukan<\/h2>\n<h3>Should openings and columns be deducted from the total area?<\/h3>\n<p>It depends on the measurement standard in your contract. Standards differ, and I do not use one fixed limit for all jobs. Check the rules for voids and obstructions, then state the chosen rule in the BOQ preamble so everyone follows the same method.<\/p>\n<h3>Who bears the cost of waste, the client or the contractor?<\/h3>\n<p>Under a net-measured BOQ, waste is normally included in the contractor&#8217;s unit rate. A client can agree to pay a stated allowance, but the contract must define it. The BOQ should say which party carries the cost of seam trimming and offcuts.<\/p>\n<h3>How do you quantify sports-grade and healthcare-grade PVC sheet flooring differently?<\/h3>\n<p>The area method is the same. The specification and accessories change. Healthcare floors often need sealed seams, integral coved skirting to a stated height and hygienic cleaning performance. Sports floors often need a specific thickness, a shock-absorbing build and line or surface requirements. List these items clearly, because they change the rate and the lm quantities.<\/p>\n<h3>Should subfloor preparation be in the same line as the flooring?<\/h3>\n<p>I prefer a separate line. The cost depends on the real slab condition, which is often unknown at tender stage. A separate item, even a provisional one, keeps the flooring rate clean and makes later changes easy to value.<\/p>\n<h3>Can I use the BOQ quantity to order rolls?<\/h3>\n<p>No. The BOQ quantity is the net installed area. Order quantity comes from the laying plan, which accounts for roll width, seams, end cuts, pattern repeat and offcut reuse.<\/p>\n<h2>Kesimpulan<\/h2>\n<p>Measure net installed area, state the contract rules, separate BOQ quantity from order quantity, and describe every item fully. Clear preambles prevent most disputes.<\/p>\n<p><strong>Pro tip for QS professionals:<\/strong> Always cross-check the tender drawings, finishes schedule and specification before you finalize the BOQ quantity.<\/p>\n<h2>Tentang Penulis<\/h2>\n<p>I am a PVC sheet flooring manufacturing specialist with many years of hands-on experience in material selection, seam planning and design optimization. I have supported custom and bulk PVC sheet flooring projects across healthcare, education, sports and commercial sectors. My focus is to help design teams and estimators turn a drawing into an accurate, buildable specification.<\/p>\n<h2>Need Help With Your PVC Sheet Flooring BOQ?<\/h2>\n<p>If you are preparing a BOQ, checking a quantity or planning a seam layout, send me a <strong>direct message<\/strong>. Share your drawings or your specification, and I will review them with you and point out the gaps before they turn into extra cost.<\/p>","protected":false},"excerpt":{"rendered":"<p>Measure PVC sheet flooring in square meters (m\u00b2) of net installed area, following the measurement standard in your contract. Measure accessories such as cove formers and capping strips in linear meters (lm). Calculate the order quantity separately from the BOQ quantity. I have worked on PVC sheet flooring projects for hospitals, schools, labs and sports&#8230;<\/p>","protected":false},"author":4,"featured_media":10748,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[21],"tags":[],"class_list":["post-10738","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-pvc-floor-blog"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>How Should PVC Sheet Flooring Be Quantified in a BOQ - MF FLOOR<\/title>\n<meta name=\"description\" content=\"Learn how to measure PVC sheet flooring BOQ quantities, calculate material needs, and specify accessories to avoid costly errors.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/meettfit.com\/id\/blog-lantai-pvc\/how-should-pvc-sheet-flooring-be-quantified-in-a-boq\/\" \/>\n<meta property=\"og:locale\" content=\"id_ID\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How Should PVC Sheet Flooring Be Quantified in a BOQ - MF FLOOR\" \/>\n<meta property=\"og:description\" content=\"Learn how to measure PVC sheet flooring BOQ quantities, calculate material needs, and specify accessories to avoid costly errors.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/meettfit.com\/id\/blog-lantai-pvc\/how-should-pvc-sheet-flooring-be-quantified-in-a-boq\/\" \/>\n<meta property=\"og:site_name\" content=\"MF FLOOR\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/profile.php?id=100079773047357\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-29T07:00:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/10\/Vinyl-Flooring-9-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Leo\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Ditulis oleh\" \/>\n\t<meta name=\"twitter:data1\" content=\"Leo\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimasi waktu membaca\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 menit\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/how-should-pvc-sheet-flooring-be-quantified-in-a-boq\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/how-should-pvc-sheet-flooring-be-quantified-in-a-boq\/\"},\"author\":{\"name\":\"Leo\",\"@id\":\"https:\/\/meettfit.com\/#\/schema\/person\/ba93f0ead95f571b725acc83f6544fef\"},\"headline\":\"How Should PVC Sheet Flooring Be Quantified in a BOQ\",\"datePublished\":\"2026-10-29T07:00:53+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/how-should-pvc-sheet-flooring-be-quantified-in-a-boq\/\"},\"wordCount\":3055,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/meettfit.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/how-should-pvc-sheet-flooring-be-quantified-in-a-boq\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/10\/Vinyl-Flooring-9-1.png\",\"articleSection\":[\"Vinyl Flooring Insights\"],\"inLanguage\":\"id\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/meettfit.com\/pvc-floor-blog\/how-should-pvc-sheet-flooring-be-quantified-in-a-boq\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/how-should-pvc-sheet-flooring-be-quantified-in-a-boq\/\",\"url\":\"https:\/\/meettfit.com\/pvc-floor-blog\/how-should-pvc-sheet-flooring-be-quantified-in-a-boq\/\",\"name\":\"How Should PVC Sheet Flooring Be Quantified in a BOQ - MF FLOOR\",\"isPartOf\":{\"@id\":\"https:\/\/meettfit.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/how-should-pvc-sheet-flooring-be-quantified-in-a-boq\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/how-should-pvc-sheet-flooring-be-quantified-in-a-boq\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/10\/Vinyl-Flooring-9-1.png\",\"datePublished\":\"2026-10-29T07:00:53+00:00\",\"description\":\"Learn how to measure PVC sheet flooring BOQ quantities, calculate material needs, and specify accessories to avoid costly errors.\",\"breadcrumb\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/how-should-pvc-sheet-flooring-be-quantified-in-a-boq\/#breadcrumb\"},\"inLanguage\":\"id\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/meettfit.com\/pvc-floor-blog\/how-should-pvc-sheet-flooring-be-quantified-in-a-boq\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"id\",\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/how-should-pvc-sheet-flooring-be-quantified-in-a-boq\/#primaryimage\",\"url\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/10\/Vinyl-Flooring-9-1.png\",\"contentUrl\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/10\/Vinyl-Flooring-9-1.png\",\"width\":800,\"height\":600,\"caption\":\"Vinyl Flooring (9)\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/how-should-pvc-sheet-flooring-be-quantified-in-a-boq\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/meettfit.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How Should PVC Sheet Flooring Be Quantified in a BOQ\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/meettfit.com\/#website\",\"url\":\"https:\/\/meettfit.com\/\",\"name\":\"MF FLOOR\",\"description\":\"fitness and sports floor China factory\",\"publisher\":{\"@id\":\"https:\/\/meettfit.com\/#organization\"},\"alternateName\":\"MF FLOOR\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/meettfit.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"id\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/meettfit.com\/#organization\",\"name\":\"MF FLOOR\",\"alternateName\":\"MF FLOOR\",\"url\":\"https:\/\/meettfit.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"id\",\"@id\":\"https:\/\/meettfit.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2025\/02\/cropped-icon.png\",\"contentUrl\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2025\/02\/cropped-icon.png\",\"width\":512,\"height\":512,\"caption\":\"MF FLOOR\"},\"image\":{\"@id\":\"https:\/\/meettfit.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/profile.php?id=100079773047357\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/meettfit.com\/#\/schema\/person\/ba93f0ead95f571b725acc83f6544fef\",\"name\":\"Leo\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"id\",\"@id\":\"https:\/\/meettfit.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/848b16970688cfb2f4cc64e85a2e2233183d3242ed0a21ffa4c859df339031f6?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/848b16970688cfb2f4cc64e85a2e2233183d3242ed0a21ffa4c859df339031f6?s=96&d=mm&r=g\",\"caption\":\"Leo\"},\"url\":\"https:\/\/meettfit.com\/id\/author\/1659230944qq-com\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"How Should PVC Sheet Flooring Be Quantified in a BOQ - MF FLOOR","description":"Learn how to measure PVC sheet flooring BOQ quantities, calculate material needs, and specify accessories to avoid costly errors.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/meettfit.com\/id\/blog-lantai-pvc\/how-should-pvc-sheet-flooring-be-quantified-in-a-boq\/","og_locale":"id_ID","og_type":"article","og_title":"How Should PVC Sheet Flooring Be Quantified in a BOQ - MF FLOOR","og_description":"Learn how to measure PVC sheet flooring BOQ quantities, calculate material needs, and specify accessories to avoid costly errors.","og_url":"https:\/\/meettfit.com\/id\/blog-lantai-pvc\/how-should-pvc-sheet-flooring-be-quantified-in-a-boq\/","og_site_name":"MF FLOOR","article_publisher":"https:\/\/www.facebook.com\/profile.php?id=100079773047357","article_published_time":"2026-10-29T07:00:53+00:00","og_image":[{"width":800,"height":600,"url":"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/10\/Vinyl-Flooring-9-1.png","type":"image\/png"}],"author":"Leo","twitter_card":"summary_large_image","twitter_misc":{"Ditulis oleh":"Leo","Estimasi waktu membaca":"1 menit"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/meettfit.com\/pvc-floor-blog\/how-should-pvc-sheet-flooring-be-quantified-in-a-boq\/#article","isPartOf":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/how-should-pvc-sheet-flooring-be-quantified-in-a-boq\/"},"author":{"name":"Leo","@id":"https:\/\/meettfit.com\/#\/schema\/person\/ba93f0ead95f571b725acc83f6544fef"},"headline":"How Should PVC Sheet Flooring Be Quantified in a BOQ","datePublished":"2026-10-29T07:00:53+00:00","mainEntityOfPage":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/how-should-pvc-sheet-flooring-be-quantified-in-a-boq\/"},"wordCount":3055,"commentCount":0,"publisher":{"@id":"https:\/\/meettfit.com\/#organization"},"image":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/how-should-pvc-sheet-flooring-be-quantified-in-a-boq\/#primaryimage"},"thumbnailUrl":"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/10\/Vinyl-Flooring-9-1.png","articleSection":["Vinyl Flooring Insights"],"inLanguage":"id","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/meettfit.com\/pvc-floor-blog\/how-should-pvc-sheet-flooring-be-quantified-in-a-boq\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/meettfit.com\/pvc-floor-blog\/how-should-pvc-sheet-flooring-be-quantified-in-a-boq\/","url":"https:\/\/meettfit.com\/pvc-floor-blog\/how-should-pvc-sheet-flooring-be-quantified-in-a-boq\/","name":"How Should PVC Sheet Flooring Be Quantified in a BOQ - MF FLOOR","isPartOf":{"@id":"https:\/\/meettfit.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/how-should-pvc-sheet-flooring-be-quantified-in-a-boq\/#primaryimage"},"image":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/how-should-pvc-sheet-flooring-be-quantified-in-a-boq\/#primaryimage"},"thumbnailUrl":"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/10\/Vinyl-Flooring-9-1.png","datePublished":"2026-10-29T07:00:53+00:00","description":"Learn how to measure PVC sheet flooring BOQ quantities, calculate material needs, and specify accessories to avoid costly errors.","breadcrumb":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/how-should-pvc-sheet-flooring-be-quantified-in-a-boq\/#breadcrumb"},"inLanguage":"id","potentialAction":[{"@type":"ReadAction","target":["https:\/\/meettfit.com\/pvc-floor-blog\/how-should-pvc-sheet-flooring-be-quantified-in-a-boq\/"]}]},{"@type":"ImageObject","inLanguage":"id","@id":"https:\/\/meettfit.com\/pvc-floor-blog\/how-should-pvc-sheet-flooring-be-quantified-in-a-boq\/#primaryimage","url":"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/10\/Vinyl-Flooring-9-1.png","contentUrl":"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/10\/Vinyl-Flooring-9-1.png","width":800,"height":600,"caption":"Vinyl Flooring (9)"},{"@type":"BreadcrumbList","@id":"https:\/\/meettfit.com\/pvc-floor-blog\/how-should-pvc-sheet-flooring-be-quantified-in-a-boq\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/meettfit.com\/"},{"@type":"ListItem","position":2,"name":"How Should PVC Sheet Flooring Be Quantified in a BOQ"}]},{"@type":"WebSite","@id":"https:\/\/meettfit.com\/#website","url":"https:\/\/meettfit.com\/","name":"MF FLOOR","description":"fitness and sports floor China factory","publisher":{"@id":"https:\/\/meettfit.com\/#organization"},"alternateName":"MF FLOOR","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/meettfit.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"id"},{"@type":"Organization","@id":"https:\/\/meettfit.com\/#organization","name":"MF FLOOR","alternateName":"MF FLOOR","url":"https:\/\/meettfit.com\/","logo":{"@type":"ImageObject","inLanguage":"id","@id":"https:\/\/meettfit.com\/#\/schema\/logo\/image\/","url":"https:\/\/meettfit.com\/wp-content\/uploads\/2025\/02\/cropped-icon.png","contentUrl":"https:\/\/meettfit.com\/wp-content\/uploads\/2025\/02\/cropped-icon.png","width":512,"height":512,"caption":"MF FLOOR"},"image":{"@id":"https:\/\/meettfit.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/profile.php?id=100079773047357"]},{"@type":"Person","@id":"https:\/\/meettfit.com\/#\/schema\/person\/ba93f0ead95f571b725acc83f6544fef","name":"Leo","image":{"@type":"ImageObject","inLanguage":"id","@id":"https:\/\/meettfit.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/848b16970688cfb2f4cc64e85a2e2233183d3242ed0a21ffa4c859df339031f6?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/848b16970688cfb2f4cc64e85a2e2233183d3242ed0a21ffa4c859df339031f6?s=96&d=mm&r=g","caption":"Leo"},"url":"https:\/\/meettfit.com\/id\/author\/1659230944qq-com\/"}]}},"_links":{"self":[{"href":"https:\/\/meettfit.com\/id\/wp-json\/wp\/v2\/posts\/10738","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/meettfit.com\/id\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/meettfit.com\/id\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/meettfit.com\/id\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/meettfit.com\/id\/wp-json\/wp\/v2\/comments?post=10738"}],"version-history":[{"count":1,"href":"https:\/\/meettfit.com\/id\/wp-json\/wp\/v2\/posts\/10738\/revisions"}],"predecessor-version":[{"id":10749,"href":"https:\/\/meettfit.com\/id\/wp-json\/wp\/v2\/posts\/10738\/revisions\/10749"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/meettfit.com\/id\/wp-json\/wp\/v2\/media\/10748"}],"wp:attachment":[{"href":"https:\/\/meettfit.com\/id\/wp-json\/wp\/v2\/media?parent=10738"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/meettfit.com\/id\/wp-json\/wp\/v2\/categories?post=10738"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/meettfit.com\/id\/wp-json\/wp\/v2\/tags?post=10738"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}