{"id":9838,"date":"2026-08-17T15:00:01","date_gmt":"2026-08-17T07:00:01","guid":{"rendered":"https:\/\/meettfit.com\/?p=9838"},"modified":"2026-08-17T11:17:52","modified_gmt":"2026-08-17T03:17:52","slug":"what-pvc-flooring-data-should-a-bim-model-include","status":"publish","type":"post","link":"https:\/\/meettfit.com\/fr\/pvc-floor-blog\/quelles-donnees-relatives-aux-revetements-de-sol-en-pvc-un-modele-bim-doit-il-inclure\/","title":{"rendered":"Quelles donn\u00e9es relatives aux rev\u00eatements de sol en PVC un mod\u00e8le BIM doit-il inclure ?"},"content":{"rendered":"<p><strong>Un mod\u00e8le BIM de rev\u00eatement de sol en PVC doit inclure des donn\u00e9es relatives \u00e0 l'identification, \u00e0 la g\u00e9om\u00e9trie, aux mat\u00e9riaux, aux performances, \u00e0 la durabilit\u00e9, \u00e0 la pose, aux co\u00fbts et au cycle de vie (FM), chacune d'entre elles \u00e9tant structur\u00e9e avec le type de param\u00e8tre, l'unit\u00e9 et la r\u00e9f\u00e9rence d'essai appropri\u00e9s.<\/strong><\/p>\n<p>J'ai travaill\u00e9 pendant des ann\u00e9es dans le secteur de la fabrication de rev\u00eatements de sol en PVC, et je constate sans cesse le m\u00eame probl\u00e8me. Un mod\u00e8le repr\u00e9sente un rectangle plat portant la mention \u00ab rev\u00eatement de sol en vinyle \u00bb, sans aucune autre information. S'ensuivent alors des demandes d'informations, le processus d'approvisionnement s'enlise, et les \u00e9quipes charg\u00e9es des installations se retrouvent avec un sol pour lequel il n'existe aucune donn\u00e9e d'entretien. Un objet BIM exploitable est un conteneur de donn\u00e9es, pas seulement une forme, et il doit pr\u00e9senter une structure bien d\u00e9finie.<\/p>\n<p>Vous trouverez ci-dessous la liste des \u00e9l\u00e9ments que ce conteneur doit contenir, la mani\u00e8re de l'organiser et sa correspondance avec des normes ouvertes telles que IFC et COBie.<\/p>\n<h2>Pourquoi les donn\u00e9es d\u00e9taill\u00e9es sont plus importantes que les objets g\u00e9n\u00e9riques<\/h2>\n<p><strong>Generic flooring objects cause RFIs and procurement errors. The required data depth should follow the project&#8217;s information requirements and BIM Execution Plan, not a fixed LOD assumption.<\/strong><\/p>\n<p>A model with no product code, fire rating, or slip value forces every downstream team to chase missing specs manually. Rather than assuming a fixed LOD target, the model&#8217;s detail should match what the project&#8217;s exchange requirements actually demand at each stage \u2014 enough to support coordination, specification, and procurement by construction stage.<\/p>\n<h2>Cat\u00e9gories de donn\u00e9es de base<\/h2>\n<p><strong>Les donn\u00e9es BIM relatives aux rev\u00eatements de sol en PVC se r\u00e9partissent en sept cat\u00e9gories : g\u00e9om\u00e9trie, mat\u00e9riaux\/produits, performances, durabilit\u00e9, pose, co\u00fbts et gestion des installations\/cycle de vie.<\/strong><\/p>\n<ul>\n<li><strong>G\u00e9om\u00e9trie :<\/strong> \u00e9paisseur totale, dimensions des lames\/dalles ou largeur du rouleau, sch\u00e9ma de pose, support de pose et d\u00e9tails des transitions. La mod\u00e9lisation du sch\u00e9ma de pose facilite la coordination de l\u2019implantation, mais la marge de perte doit rester un \u00e9l\u00e9ment distinct dans le devis d\u2019achat, car la perte r\u00e9elle d\u00e9pend de la forme de la pi\u00e8ce, du plan de raccordement et de l\u2019harmonisation des lots, et non pas uniquement de la g\u00e9om\u00e9trie.<\/li>\n<li><strong>Mat\u00e9riau\/Produit :<\/strong> fabricant, r\u00e9f\u00e9rence du produit, type de rev\u00eatement de sol (homog\u00e8ne, h\u00e9t\u00e9rog\u00e8ne, LVT), couleur et support. Pour les rev\u00eatements h\u00e9t\u00e9rog\u00e8nes\/LVT, indiquer l'\u00e9paisseur de la couche d'usure s\u00e9par\u00e9ment de l'\u00e9paisseur totale. Pour le vinyle homog\u00e8ne, indiquer plut\u00f4t le type de structure, car celle-ci est uniforme sur toute l'\u00e9paisseur.<\/li>\n<li><strong>Performance :<\/strong> r\u00e9sistance au glissement, classification au feu, performances acoustiques, r\u00e9sistance \u00e0 l'indentation, r\u00e9sistance chimique, donn\u00e9es sur les COV. Chaque valeur de performance doit \u00eatre accompagn\u00e9e de sa m\u00e9thode d'essai et de sa norme correspondante : un DCOF ou une valeur R ne suffisent pas \u00e0 eux seuls, car les seuils varient en fonction de la norme et de la classification d'utilisation.<\/li>\n<li><strong>Durabilit\u00e9 :<\/strong> certifications (FloorScore, EPD), teneur en mat\u00e9riaux recycl\u00e9s, dur\u00e9e de la garantie, conformit\u00e9 aux normes r\u00e9gionales.<\/li>\n<li><strong>Installation :<\/strong> type d'adh\u00e9sif, limites d'humidit\u00e9 et de plan\u00e9it\u00e9 du support, m\u00e9thode de pose, besoins en joints de dilatation.<\/li>\n<li><strong>Co\u00fbts\/Approvisionnement :<\/strong> le co\u00fbt unitaire, le fournisseur et le d\u00e9lai de livraison, ainsi que la marge de perte, dans un champ distinct.<\/li>\n<li><strong>FM\/Cycle de vie :<\/strong> dur\u00e9e de vie pr\u00e9vue, calendrier d'entretien, cycle de remplacement, r\u00e9f\u00e9rence d'inventaire pour les syst\u00e8mes CAFM\/CMMS, num\u00e9ro de lot, date d'installation.<\/li>\n<\/ul>\n<p><img decoding=\"async\" src=\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-1-10.jpg&quot;\" alt=\"Cat\u00e9gories de donn\u00e9es relatives aux rev\u00eatements de sol en PVC\" \/><\/p>\n<h2>Liste compl\u00e8te des param\u00e8tres \u00e0 v\u00e9rifier<\/h2>\n<p><strong>Une liste de contr\u00f4le op\u00e9rationnelle doit comporter, pour chaque champ, les informations suivantes : param\u00e8tre, type de donn\u00e9es, unit\u00e9, statut (type\/instance) et statut (obligatoire\/facultatif).<\/strong><\/p>\n<table>\n<thead>\n<tr>\n<th>Cat\u00e9gorie<\/th>\n<th>Param\u00e8tres<\/th>\n<th>Type de donn\u00e9es \/ Unit\u00e9<\/th>\n<th>Type ou instance<\/th>\n<th>Obligatoire<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Identit\u00e9<\/td>\n<td>Fabricant, R\u00e9f\u00e9rence produit, Type de rev\u00eatement de sol, Code de classification<\/td>\n<td>Texte<\/td>\n<td>Type<\/td>\n<td>Obligatoire<\/td>\n<\/tr>\n<tr>\n<td>G\u00e9om\u00e9trie<\/td>\n<td>\u00c9paisseur totale (mm), couche d'usure (mm), dimensions des dalles\/lames, largeur du rouleau<\/td>\n<td>Nombre\/Dimension<\/td>\n<td>Type<\/td>\n<td>Obligatoire<\/td>\n<\/tr>\n<tr>\n<td>G\u00e9om\u00e9trie<\/td>\n<td>Sch\u00e9ma d'installation, surface couverte (m\u00b2)<\/td>\n<td>Texte\/Num\u00e9ro<\/td>\n<td>Instance<\/td>\n<td>Recommand\u00e9<\/td>\n<\/tr>\n<tr>\n<td>Performance<\/td>\n<td>Indice de r\u00e9sistance au glissement + M\u00e9thode d'essai<\/td>\n<td>Nombre + texte<\/td>\n<td>Type<\/td>\n<td>Obligatoire<\/td>\n<\/tr>\n<tr>\n<td>Performance<\/td>\n<td>Classification au feu, r\u00e9duction des bruits d'impact (dB), empreinte r\u00e9siduelle (mm)<\/td>\n<td>Texte\/Num\u00e9ro<\/td>\n<td>Type<\/td>\n<td>Obligatoire\/Recommand\u00e9<\/td>\n<\/tr>\n<tr>\n<td>Durabilit\u00e9<\/td>\n<td>Certification COV, num\u00e9ro EPD, teneur en mat\u00e9riaux recycl\u00e9s (%), garantie (en ann\u00e9es)<\/td>\n<td>Texte\/Num\u00e9ro<\/td>\n<td>Type<\/td>\n<td>Recommand\u00e9<\/td>\n<\/tr>\n<tr>\n<td>Installation<\/td>\n<td>Type d'adh\u00e9sif, limite d'humidit\u00e9 du support, m\u00e9thode de pose<\/td>\n<td>Texte\/Num\u00e9ro<\/td>\n<td>Type<\/td>\n<td>Obligatoire<\/td>\n<\/tr>\n<tr>\n<td>Co\u00fbt<\/td>\n<td>Co\u00fbt unitaire, d\u00e9lai de fabrication, marge de d\u00e9chets (%)<\/td>\n<td>Nombre<\/td>\n<td>Instance\/Type<\/td>\n<td>Recommand\u00e9<\/td>\n<\/tr>\n<tr>\n<td>FM<\/td>\n<td>Dur\u00e9e de vie pr\u00e9vue, calendrier d'entretien (lien), date d'installation, num\u00e9ro de lot, date de remplacement<\/td>\n<td>Nombre\/Texte\/Date<\/td>\n<td>Instance<\/td>\n<td>Obligatoire\/Recommand\u00e9<\/td>\n<\/tr>\n<tr>\n<td>V\u00e9rification<\/td>\n<td>R\u00e9vision du TDS, norme d'essai, num\u00e9ro de certificat, date d'expiration du certificat, date de la derni\u00e8re mise \u00e0 jour des donn\u00e9es<\/td>\n<td>Texte\/Date<\/td>\n<td>Type<\/td>\n<td>Recommand\u00e9<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><img decoding=\"async\" src=\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-3-9.jpg&quot;\" alt=\"Tableau de v\u00e9rification des param\u00e8tres BIM pour les rev\u00eatements de sol en PVC\" \/><\/p>\n<h2>Param\u00e8tres de type et param\u00e8tres d'instance<\/h2>\n<p><strong>Les donn\u00e9es de type d\u00e9crivent le produit lui-m\u00eame ; les donn\u00e9es d'instance d\u00e9crivent une occurrence sp\u00e9cifique de ce produit.<\/strong><\/p>\n<p>Le fabricant, le code produit, l'\u00e9paisseur et la classe de r\u00e9sistance au feu rel\u00e8vent du niveau \u00ab Type \u00bb, car chaque unit\u00e9 de ce produit partage la m\u00eame valeur. La pi\u00e8ce\/zone, la quantit\u00e9 install\u00e9e, la date d\u2019installation et le num\u00e9ro de lot rel\u00e8vent du niveau \u00ab Instance \u00bb, car deux pi\u00e8ces \u00e9quip\u00e9es du m\u00eame produit peuvent tout de m\u00eame pr\u00e9senter des dates d\u2019installation ou des num\u00e9ros de lot diff\u00e9rents. Le m\u00e9lange de ces niveaux est l\u2019une des erreurs les plus courantes dans les objets fournis par les fabricants, et cela perturbe la planification ult\u00e9rieure.<\/p>\n<h2>Conversion au format IFC et openBIM<\/h2>\n<p><strong>Les rev\u00eatements de sol en PVC correspondent g\u00e9n\u00e9ralement \u00e0 l'\u00e9l\u00e9ment IfcCovering avec le type pr\u00e9d\u00e9fini FLOORING, en utilisant des ensembles de propri\u00e9t\u00e9s standard ainsi qu'un ensemble personnalis\u00e9 pour les donn\u00e9es sp\u00e9cifiques au fabricant.<\/strong><\/p>\n<p>Some flooring-specific properties already exist in standard IFC property sets, while data like SKU, wear layer thickness, or certificate numbers usually needs a custom property set. buildingSMART&#8217;s Information Delivery Specification (IDS) can define which objects, classifications, properties, and units must exist in a model exchange, and can automatically check whether a delivered IFC model meets that requirement \u2014 useful for validating flooring data without manual review.<\/p>\n<h2>Transfert entre COBie et FM<\/h2>\n<p><strong>COBie r\u00e9partit les donn\u00e9es relatives aux rev\u00eatements de sol en enregistrements de type, de composant, d'attribut et de document, afin que les \u00e9quipes charg\u00e9es de la gestion des installations puissent les exploiter sans avoir \u00e0 ouvrir le mod\u00e8le natif.<\/strong><\/p>\n<p>Type records carry product-level facts (manufacturer, spec); Component records carry instance-level facts (location, install date); Attribute records carry extra properties (warranty, fire rating); Document records link to files like EPDs or installation guides rather than embedding them. The exact fields required should be set by the asset owner&#8217;s information requirements, not assumed to be identical across every project.<\/p>\n<h2>Ce qui reste dans le mod\u00e8le et ce qui devrait renvoyer vers l'ext\u00e9rieur<\/h2>\n<p><strong>Les valeurs individuelles structur\u00e9es (\u00e9paisseur, classification, indice de r\u00e9sistance au feu) doivent figurer en tant que param\u00e8tres. Les documents complets (guides d'installation, EPD, fichiers PDF de garantie) doivent figurer en tant que r\u00e9f\u00e9rences li\u00e9es.<\/strong><\/p>\n<p>A simple rule: if a value drives a calculation, filter, or schedule, make it a parameter. If it&#8217;s a document someone needs to read, link it by URL or document ID instead of embedding it. This keeps file size manageable and keeps referenced documents current at the source.<\/p>\n<h2>Les diff\u00e9rents types de rev\u00eatements de sol en PVC n\u00e9cessitent des param\u00e8tres diff\u00e9rents<\/h2>\n<p><strong>Les rev\u00eatements de sol h\u00e9t\u00e9rog\u00e8nes, homog\u00e8nes, sportifs, ESD et LVT n\u00e9cessitent chacun des crit\u00e8res suppl\u00e9mentaires qui ne figurent pas dans la liste de contr\u00f4le de base.<\/strong><\/p>\n<table>\n<thead>\n<tr>\n<th>Type de produit<\/th>\n<th>Param\u00e8tres suppl\u00e9mentaires<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Feuille h\u00e9t\u00e9rog\u00e8ne<\/td>\n<td>Couche d'usure, support, performances acoustiques<\/td>\n<\/tr>\n<tr>\n<td>Homog\u00e8ne<\/td>\n<td>Classification des mat\u00e9riaux de construction\/liants, traitement de surface<\/td>\n<\/tr>\n<tr>\n<td>PVC sportif<\/td>\n<td>Absorption des chocs, d\u00e9formation verticale, rebond de la balle, frottement<\/td>\n<\/tr>\n<tr>\n<td>PVC ESD<\/td>\n<td>R\u00e9sistance \u00e9lectrique, exigences en mati\u00e8re de mise \u00e0 la terre<\/td>\n<\/tr>\n<tr>\n<td>LVT\/lames<\/td>\n<td>Dimensions des lames, m\u00e9thode de pose (fixation ou collage)<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><img decoding=\"async\" src=\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-4-7.jpg&quot;\" alt=\"Param\u00e8tres sp\u00e9cifiques aux diff\u00e9rents types de rev\u00eatements de sol en PVC\" \/><\/p>\n<h2>V\u00e9rification de l'actualit\u00e9 des donn\u00e9es<\/h2>\n<p><strong>Track TDS revision, test standard, certificate number, expiry date, and last update date so specifiers aren&#8217;t working from outdated data.<\/strong><\/p>\n<p>J'ai d\u00e9j\u00e0 vu des \u00e9quipes charg\u00e9es des appels d'offres utiliser un ancien objet BIM dont le certificat avait expir\u00e9 ou dont la fiche technique \u00e9tait obsol\u00e8te. Une r\u00e9vision et une date d'expiration clairement visibles permettent de rep\u00e9rer ce probl\u00e8me imm\u00e9diatement, plut\u00f4t que de le d\u00e9couvrir plus tard lors d'un contr\u00f4le de conformit\u00e9.<\/p>\n<h2>D\u00e9nomination et classification<\/h2>\n<p><strong>Utilisez des param\u00e8tres communs, une nomenclature coh\u00e9rente et un code de classification (Uniclass\/OmniClass) afin que les donn\u00e9es restent exploitables lors des \u00e9changes entre diff\u00e9rentes plateformes.<\/strong><\/p>\n<p>&quot;WearLayer_mm&quot; in one object and &quot;Wear Layer Thickness&quot; in another won&#8217;t match automatically in a schedule or export. Consistent naming plus a classification code keeps data meaningful once it leaves its original Revit file.<\/p>\n<h2>Erreurs courantes<\/h2>\n<ul>\n<li>Consid\u00e9rer le BIM uniquement comme une question de g\u00e9om\u00e9trie, en laissant les champs relatifs aux performances et aux co\u00fbts vides<\/li>\n<li>Manque de coh\u00e9rence dans la d\u00e9nomination des param\u00e8tres entre les objets<\/li>\n<li>M\u00e9langer des donn\u00e9es de type et d'instance au mauvais niveau<\/li>\n<li>Chasing a fixed LOD number instead of the project&#8217;s actual information requirement<\/li>\n<\/ul>\n<h2>\u00ab Minimum \u00bb vs \u00ab Conforme aux sp\u00e9cifications \u00bb vs \u00ab Conforme aux normes FM \u00bb<\/h2>\n<p><strong>Adapter le niveau de d\u00e9tail des donn\u00e9es \u00e0 l'\u00e9tape du projet, plut\u00f4t que de charger tous les champs d\u00e8s les premi\u00e8res phases de conception.<\/strong><\/p>\n<ul>\n<li><strong>Minimum :<\/strong> identit\u00e9, g\u00e9om\u00e9trie, propri\u00e9t\u00e9s techniques fondamentales \u2014 de quoi les situer et les visualiser d\u00e8s le d\u00e9but.<\/li>\n<li><strong>Pr\u00eat pour le cahier des charges :<\/strong> ajoute des donn\u00e9es de performance, ainsi que les m\u00e9thodes d'essai, les certifications de d\u00e9veloppement durable et les exigences d'installation \u2014 de quoi r\u00e9pondre \u00e0 un appel d'offres.<\/li>\n<li><strong>Compatible FM :<\/strong> ajoute les informations relatives \u00e0 la garantie, \u00e0 la dur\u00e9e de vie, au calendrier d'entretien, aux liens vers les documents et aux donn\u00e9es d'instance conformes \u00e0 la norme COBie \u2014 de quoi assurer la passation des travaux.<\/li>\n<\/ul>\n<p><img decoding=\"async\" src=\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-5-6.jpg&quot;\" alt=\"Niveaux de donn\u00e9es BIM pour les rev\u00eatements de sol en PVC\" \/><\/p>\n<h2>Conclusion<\/h2>\n<p>Un objet BIM complet d\u00e9di\u00e9 \u00e0 un rev\u00eatement de sol en PVC doit comporter des donn\u00e9es relatives \u00e0 l'identit\u00e9, \u00e0 la g\u00e9om\u00e9trie, aux performances, \u00e0 la durabilit\u00e9, \u00e0 la pose, au co\u00fbt et \u00e0 la gestion des installations, correctement structur\u00e9es et v\u00e9rifi\u00e9es.<\/p>\n<p>If you&#8217;re building a custom or bulk PVC flooring BIM object and want to close any data gaps before production, feel free to send me a message.<\/p>","protected":false},"excerpt":{"rendered":"<p>A PVC flooring BIM model should include identity, geometry, material, performance, sustainability, installation, cost, and FM lifecycle data, each structured with the right parameter type, unit, and test reference. I have spent years on the manufacturing side of PVC flooring, and I see the same problem repeatedly. A model shows a flat rectangle labeled &quot;vinyl&#8230;<\/p>","protected":false},"author":4,"featured_media":9845,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[21],"tags":[],"class_list":["post-9838","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-pvc-floor-blog"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>What PVC Flooring Data Should a BIM Model Include - MF FLOOR<\/title>\n<meta name=\"description\" content=\"Learn what PVC flooring BIM data should include, from geometry and performance to IFC, COBie, installation, cost and FM data.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/meettfit.com\/fr\/pvc-floor-blog\/quelles-donnees-relatives-aux-revetements-de-sol-en-pvc-un-modele-bim-doit-il-inclure\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"What PVC Flooring Data Should a BIM Model Include - MF FLOOR\" \/>\n<meta property=\"og:description\" content=\"Learn what PVC flooring BIM data should include, from geometry and performance to IFC, COBie, installation, cost and FM data.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/meettfit.com\/fr\/pvc-floor-blog\/quelles-donnees-relatives-aux-revetements-de-sol-en-pvc-un-modele-bim-doit-il-inclure\/\" \/>\n<meta property=\"og:site_name\" content=\"MF FLOOR\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/profile.php?id=100079773047357\" \/>\n<meta property=\"article:published_time\" content=\"2026-08-17T07:00:01+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2-10.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Leo\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"Leo\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/\"},\"author\":{\"name\":\"Leo\",\"@id\":\"https:\/\/meettfit.com\/#\/schema\/person\/ba93f0ead95f571b725acc83f6544fef\"},\"headline\":\"What PVC Flooring Data Should a BIM Model Include\",\"datePublished\":\"2026-08-17T07:00:01+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/\"},\"wordCount\":1249,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/meettfit.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2-10.jpg\",\"articleSection\":[\"Vinyl Flooring Insights\"],\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/\",\"url\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/\",\"name\":\"What PVC Flooring Data Should a BIM Model Include - MF FLOOR\",\"isPartOf\":{\"@id\":\"https:\/\/meettfit.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2-10.jpg\",\"datePublished\":\"2026-08-17T07:00:01+00:00\",\"description\":\"Learn what PVC flooring BIM data should include, from geometry and performance to IFC, COBie, installation, cost and FM data.\",\"breadcrumb\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#primaryimage\",\"url\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2-10.jpg\",\"contentUrl\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2-10.jpg\",\"width\":800,\"height\":600,\"caption\":\"PVC Flooring (2)\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/meettfit.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"What PVC Flooring Data Should a BIM Model Include\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/meettfit.com\/#website\",\"url\":\"https:\/\/meettfit.com\/\",\"name\":\"MF FLOOR\",\"description\":\"fitness and sports floor China factory\",\"publisher\":{\"@id\":\"https:\/\/meettfit.com\/#organization\"},\"alternateName\":\"MF FLOOR\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/meettfit.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/meettfit.com\/#organization\",\"name\":\"MF FLOOR\",\"alternateName\":\"MF FLOOR\",\"url\":\"https:\/\/meettfit.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/meettfit.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2025\/02\/cropped-icon.png\",\"contentUrl\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2025\/02\/cropped-icon.png\",\"width\":512,\"height\":512,\"caption\":\"MF FLOOR\"},\"image\":{\"@id\":\"https:\/\/meettfit.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/profile.php?id=100079773047357\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/meettfit.com\/#\/schema\/person\/ba93f0ead95f571b725acc83f6544fef\",\"name\":\"Leo\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/meettfit.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/848b16970688cfb2f4cc64e85a2e2233183d3242ed0a21ffa4c859df339031f6?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/848b16970688cfb2f4cc64e85a2e2233183d3242ed0a21ffa4c859df339031f6?s=96&d=mm&r=g\",\"caption\":\"Leo\"},\"url\":\"https:\/\/meettfit.com\/fr\/author\/1659230944qq-com\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"What PVC Flooring Data Should a BIM Model Include - MF FLOOR","description":"Learn what PVC flooring BIM data should include, from geometry and performance to IFC, COBie, installation, cost and FM data.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/meettfit.com\/fr\/pvc-floor-blog\/quelles-donnees-relatives-aux-revetements-de-sol-en-pvc-un-modele-bim-doit-il-inclure\/","og_locale":"fr_FR","og_type":"article","og_title":"What PVC Flooring Data Should a BIM Model Include - MF FLOOR","og_description":"Learn what PVC flooring BIM data should include, from geometry and performance to IFC, COBie, installation, cost and FM data.","og_url":"https:\/\/meettfit.com\/fr\/pvc-floor-blog\/quelles-donnees-relatives-aux-revetements-de-sol-en-pvc-un-modele-bim-doit-il-inclure\/","og_site_name":"MF FLOOR","article_publisher":"https:\/\/www.facebook.com\/profile.php?id=100079773047357","article_published_time":"2026-08-17T07:00:01+00:00","og_image":[{"width":800,"height":600,"url":"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2-10.jpg","type":"image\/jpeg"}],"author":"Leo","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"Leo","Dur\u00e9e de lecture estim\u00e9e":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#article","isPartOf":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/"},"author":{"name":"Leo","@id":"https:\/\/meettfit.com\/#\/schema\/person\/ba93f0ead95f571b725acc83f6544fef"},"headline":"What PVC Flooring Data Should a BIM Model Include","datePublished":"2026-08-17T07:00:01+00:00","mainEntityOfPage":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/"},"wordCount":1249,"commentCount":0,"publisher":{"@id":"https:\/\/meettfit.com\/#organization"},"image":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#primaryimage"},"thumbnailUrl":"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2-10.jpg","articleSection":["Vinyl Flooring Insights"],"inLanguage":"fr-FR","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/","url":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/","name":"What PVC Flooring Data Should a BIM Model Include - MF FLOOR","isPartOf":{"@id":"https:\/\/meettfit.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#primaryimage"},"image":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#primaryimage"},"thumbnailUrl":"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2-10.jpg","datePublished":"2026-08-17T07:00:01+00:00","description":"Learn what PVC flooring BIM data should include, from geometry and performance to IFC, COBie, installation, cost and FM data.","breadcrumb":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#primaryimage","url":"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2-10.jpg","contentUrl":"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2-10.jpg","width":800,"height":600,"caption":"PVC Flooring (2)"},{"@type":"BreadcrumbList","@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/meettfit.com\/"},{"@type":"ListItem","position":2,"name":"What PVC Flooring Data Should a BIM Model Include"}]},{"@type":"WebSite","@id":"https:\/\/meettfit.com\/#website","url":"https:\/\/meettfit.com\/","name":"MF FLOOR","description":"fitness and sports floor China factory","publisher":{"@id":"https:\/\/meettfit.com\/#organization"},"alternateName":"MF FLOOR","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/meettfit.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/meettfit.com\/#organization","name":"MF FLOOR","alternateName":"MF FLOOR","url":"https:\/\/meettfit.com\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/meettfit.com\/#\/schema\/logo\/image\/","url":"https:\/\/meettfit.com\/wp-content\/uploads\/2025\/02\/cropped-icon.png","contentUrl":"https:\/\/meettfit.com\/wp-content\/uploads\/2025\/02\/cropped-icon.png","width":512,"height":512,"caption":"MF FLOOR"},"image":{"@id":"https:\/\/meettfit.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/profile.php?id=100079773047357"]},{"@type":"Person","@id":"https:\/\/meettfit.com\/#\/schema\/person\/ba93f0ead95f571b725acc83f6544fef","name":"Leo","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/meettfit.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/848b16970688cfb2f4cc64e85a2e2233183d3242ed0a21ffa4c859df339031f6?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/848b16970688cfb2f4cc64e85a2e2233183d3242ed0a21ffa4c859df339031f6?s=96&d=mm&r=g","caption":"Leo"},"url":"https:\/\/meettfit.com\/fr\/author\/1659230944qq-com\/"}]}},"_links":{"self":[{"href":"https:\/\/meettfit.com\/fr\/wp-json\/wp\/v2\/posts\/9838","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/meettfit.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/meettfit.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/meettfit.com\/fr\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/meettfit.com\/fr\/wp-json\/wp\/v2\/comments?post=9838"}],"version-history":[{"count":1,"href":"https:\/\/meettfit.com\/fr\/wp-json\/wp\/v2\/posts\/9838\/revisions"}],"predecessor-version":[{"id":9849,"href":"https:\/\/meettfit.com\/fr\/wp-json\/wp\/v2\/posts\/9838\/revisions\/9849"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/meettfit.com\/fr\/wp-json\/wp\/v2\/media\/9845"}],"wp:attachment":[{"href":"https:\/\/meettfit.com\/fr\/wp-json\/wp\/v2\/media?parent=9838"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/meettfit.com\/fr\/wp-json\/wp\/v2\/categories?post=9838"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/meettfit.com\/fr\/wp-json\/wp\/v2\/tags?post=9838"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}