{"id":9711,"date":"2026-08-07T15:01:34","date_gmt":"2026-08-07T07:01:34","guid":{"rendered":"https:\/\/meettfit.com\/?p=9711"},"modified":"2026-08-07T11:33:26","modified_gmt":"2026-08-07T03:33:26","slug":"what-preparation-before-laying-pvc-flooring","status":"publish","type":"post","link":"https:\/\/meettfit.com\/fr\/pvc-floor-blog\/what-preparation-before-laying-pvc-flooring\/","title":{"rendered":"What Preparation Before Laying PVC Flooring"},"content":{"rendered":"<p><strong>Proper preparation makes up about 80% of a successful PVC flooring installation. A dry, flat, clean, and acclimated subfloor is the real foundation of a smooth, long-lasting result.<\/strong><\/p>\n<p>After years on the installation floor, I can tell you that most PVC flooring failures never come from the material itself. They come from what happened \u2014 or didn&#8217;t happen \u2014 before the first plank ever touched the ground. Skip moisture testing and you get blistering or mold under the surface. Ignore a bumpy subfloor and every dip and crack will telegraph through the finished floor. Rush the acclimation step and you&#8217;ll see gaps or buckling weeks later, once the room settles into its normal temperature and humidity. None of these problems are about bad luck. They are about missed steps.<\/p>\n<p>In this guide, I&#8217;ll walk you through the full pre-installation process I use on every project, from checking your subfloor and testing for moisture, to acclimating the planks and setting up your tools. If you follow this checklist, you&#8217;ll avoid the most common causes of PVC flooring failure and set yourself up for a finish that holds up for decades.<\/p>\n<h2>Is Your Space and Subfloor Ready for PVC Flooring?<\/h2>\n<p><strong>Your subfloor needs to be structurally sound, clean, and made of a compatible material such as concrete, plywood, or existing tile. Never install directly over carpet, floating floors, or damaged wood.<\/strong><\/p>\n<p>Before I even open a box of PVC flooring, I walk the room and check what&#8217;s underneath. Concrete and screed are the most common bases, and they usually work well once cured and sealed. Existing ceramic tile can also work as long as the grout lines are filled and the surface is degreased. Plywood and timber subfloors are fine too, but only if every panel is secured and free of movement. What I always avoid is installing over carpet, floating floors, or wood that shows rot or damage, because none of these give the adhesive or click-lock system a stable base to hold onto.<\/p>\n<table>\n<thead>\n<tr>\n<th>Type de sous-plancher<\/th>\n<th>Suitable for PVC?<\/th>\n<th>Key Prep Step<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Concrete \/ Screed<\/td>\n<td>Oui<\/td>\n<td>Cure, seal with primer<\/td>\n<\/tr>\n<tr>\n<td>Existing Ceramic Tile<\/td>\n<td>Oui<\/td>\n<td>Degrease, skim-coat grout lines<\/td>\n<\/tr>\n<tr>\n<td>Plywood \/ Timber<\/td>\n<td>Oui<\/td>\n<td>Secure panels, sand seams<\/td>\n<\/tr>\n<tr>\n<td>Carpet \/ Floating Floor<\/td>\n<td>Non<\/td>\n<td>Retirer compl\u00e8tement<\/td>\n<\/tr>\n<tr>\n<td>Damaged Wood<\/td>\n<td>Non<\/td>\n<td>Repair or replace first<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Once I&#8217;ve confirmed the subfloor type, I move to structural inspection. Loose boards, cracked tiles, and uneven slabs all need to be flagged and fixed before anything else begins. This early inspection saves time later, because it&#8217;s much easier to fix a structural issue now than to lift a finished floor after installation.<\/p>\n<h2>Why Is Dryness the First Pillar of Subfloor Preparation?<\/h2>\n<p><strong>Trapped moisture under PVC flooring causes blistering, mold growth, and adhesive breakdown. Moisture levels should stay below the manufacturer&#8217;s threshold, typically under 75% relative humidity, before installation.<\/strong><\/p>\n<p>Moisture is the single biggest hidden risk in any PVC flooring job. I&#8217;ve seen otherwise perfect installations fail within months because the concrete underneath was still releasing moisture. To test for this, I use either a Calcium Chloride test, which measures moisture emission over 60 to 72 hours, or a Relative Humidity probe test, which reads moisture deeper inside the slab and tends to give a more reliable picture. For a quick field check, I&#8217;ll sometimes tape a plastic sheet to the floor overnight; if condensation forms underneath, that&#8217;s a clear sign the subfloor isn&#8217;t ready. When readings come back too high, I don&#8217;t skip the job \u2014 I apply a Moisture Vapor Barrier or an epoxy primer designed to hold moisture back, which lets us move forward safely without waiting months for the slab to dry naturally.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2.jpg&quot;\" alt=\"Moisture testing on concrete subfloor before PVC flooring\" \/><\/p>\n<p>Getting the dryness pillar right protects everything that comes after it. Once moisture is under control, the next thing I check is how flat and smooth the surface actually is.<\/p>\n<h2>Why Does Flatness Matter for PVC Flooring Installation?<\/h2>\n<p><strong>PVC flooring is thin and flexible, so any bump, crack, or dip in the subfloor will show through the finished surface. Industry standard allows no more than 3mm of variation over a 2-meter span.<\/strong><\/p>\n<p>This effect is called telegraphing, and it&#8217;s one of the most common complaints I hear from clients who tried to skip subfloor leveling. Because PVC flooring is flexible by design, it takes the shape of whatever is underneath it. I always check flatness with a straight edge or spirit level across a 2-meter span, and if the gap under the tool exceeds 3mm, that section needs correction before we proceed. For small cracks and grout lines, a patching compound or feather edge does the job. For larger, more uneven areas, I bring in a self-leveling compound to create a smooth, even screed across the whole floor. On wood subfloors, high spots usually just need sanding down rather than a full leveling pour.<\/p>\n<table>\n<thead>\n<tr>\n<th>Flatness Issue<\/th>\n<th>Correction recommand\u00e9e<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Small cracks \/ grout lines<\/td>\n<td>Patching compound, feather edge<\/td>\n<\/tr>\n<tr>\n<td>Uneven concrete<\/td>\n<td>Compos\u00e9 autolissant<\/td>\n<\/tr>\n<tr>\n<td>High spots on wood<\/td>\n<td>Sanding<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Getting the surface flat isn&#8217;t optional if you want a professional finish \u2014 it&#8217;s the step that determines whether the floor looks seamless or shows every imperfection underneath.<\/p>\n<h2>Why Is Cleanliness Essential Before Installing PVC Flooring?<\/h2>\n<p><strong>Dust, grease, and old adhesive residue interfere with bonding and can cause premature adhesive failure. A full sweep, HEPA vacuum, and damp mop are required before installation.<\/strong><\/p>\n<p>Cleanliness sounds like the simplest step, but it&#8217;s the one I see skipped most often on tight schedules. Old adhesive, paint splatter, grease, and wax all sit between the new adhesive and the subfloor, weakening the bond over time even if the floor looks fine on installation day. My standard sequence is to sweep first to clear loose debris, then vacuum thoroughly with a HEPA filter, because fine dust particles are what really interfere with adhesive bonding at a microscopic level. After that, I damp mop the surface and let it dry completely before laying a single plank. Skipping the drying time here undoes the moisture control work from the first pillar, so I treat this step with the same discipline.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-1.jpg&quot;\" alt=\"Cleaning subfloor before PVC flooring installation\" \/><\/p>\n<p>A clean surface gives the adhesive or click-lock system the best possible chance to perform the way it was engineered to. From here, the last pillar is about giving the material itself time to settle into the room.<\/p>\n<h2>Why Is Acclimation Non-Negotiable for PVC Flooring?<\/h2>\n<p><strong>PVC planks need 24 to 48 hours to acclimate flat in the installation room, kept between 18\u00b0C and 26\u00b0C, to prevent expansion, contraction, or seam gaps after installation.<\/strong><\/p>\n<p>PVC flooring reacts to temperature and humidity even after it&#8217;s installed, which is why acclimation is a step I never let clients skip. I store the planks flat in the actual room where they&#8217;ll be installed, not in a hallway or garage, for at least 24 to 48 hours before starting. The room needs to stay between 18\u00b0C and 26\u00b0C (65\u00b0F to 79\u00b0F) during this window, and I keep the HVAC system running continuously before, during, and after installation. Skipping this step is one of the most common reasons I get called back to a job months later \u2014 the planks expand or contract after installation because they were never given the chance to adjust to the room&#8217;s actual conditions first.<\/p>\n<table>\n<thead>\n<tr>\n<th>Acclimation Requirement<\/th>\n<th>Standard<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>La dur\u00e9e<\/td>\n<td>24\u201348 hours<\/td>\n<\/tr>\n<tr>\n<td>Temp\u00e9rature ambiante<\/td>\n<td>18\u00b0C\u201326\u00b0C (65\u00b0F\u201379\u00b0F)<\/td>\n<\/tr>\n<tr>\n<td>HVAC<\/td>\n<td>Running continuously<\/td>\n<\/tr>\n<tr>\n<td>Plank Position<\/td>\n<td>Stored flat<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>With dryness, flatness, cleanliness, and acclimation all addressed, the subfloor and material are ready. The next step is adjusting your approach based on the specific subfloor material you&#8217;re working with.<\/p>\n<h2>How Do You Prepare Different Subfloor Types for PVC Flooring?<\/h2>\n<p><strong>Concrete needs full curing and sealing, ceramic tile needs degreasing and grout skim-coating, and plywood needs secured panels with sanded seams \u2014 each material has its own prep sequence.<\/strong><\/p>\n<p>Every subfloor material has its own quirks, and treating them all the same way is a common mistake I see even among experienced crews. New concrete needs a full curing period, typically 28 to 60 days, before it&#8217;s ready for flooring, and porous concrete should always be sealed with a suitable primer to control future moisture movement. Existing ceramic tile needs degreasing and a deep clean first, followed by skim-coating the grout lines so the whole surface reads as one flat plane rather than a grid of shallow trenches. Plywood and timber subfloors need every loose panel secured to stop squeaking, screw heads countersunk so they don&#8217;t create bumps, and seams sanded with gaps filled using wood filler.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-4.jpg&quot;\" alt=\"Different subfloor preparation methods for PVC flooring\" \/><\/p>\n<p>Matching your prep method to the actual subfloor material in front of you is what separates a floor that lasts for decades from one that needs repair within a year.<\/p>\n<h2>What Tools and Materials Do You Need Before Installation?<\/h2>\n<p><strong>A complete toolkit includes a utility knife, straight edge, tape measure, chalk line, notched trowel, rubber mallet, and a 50kg floor roller, along with the correct underlayment and adhesive for your PVC system.<\/strong><\/p>\n<p>Having the right tools ready before installation day saves hours of downtime and avoids rushed, sloppy cuts. My standard kit includes a utility knife with fresh blades, a straight edge or steel square, a tape measure, a chalk line for laying out reference points, a notched trowel if we&#8217;re doing a glue-down installation, a rubber mallet for click-lock systems, and a floor roller weighing around 50kg (100lbs) to press the planks firmly into the adhesive. Beyond tools, choosing the right accessories matters just as much: underlayment is often required for click-lock or SPC flooring but not always for glue-down systems, and the adhesive itself needs to match the installation method, whether that&#8217;s a pressure-sensitive adhesive or a hard-set adhesive.<\/p>\n<p>Getting this checklist right before you start means fewer interruptions and a cleaner, more consistent finish across the whole room.<\/p>\n<h2>What Should You Check During the Final Walkthrough on Installation Day?<\/h2>\n<p><strong>On installation day, remove baseboards and doors, set 5\u20138mm expansion gaps around the walls, and mix planks from different boxes to blend natural color and texture variation.<\/strong><\/p>\n<p>Before laying the first plank, I do one final walkthrough of the room. Baseboards or skirting boards come off, along with any doors or appliances in the way, and I trim door frames if the new flooring height requires it. Expansion gaps around the walls, typically 5 to 8mm, need to be set correctly to allow the floor to move naturally with temperature shifts, since PVC flooring can expand and contract slightly even after acclimation. I also make a habit of mixing planks from several different boxes as I go, rather than working through one box at a time, since this blends natural color and texture variation across the room instead of creating visible batch lines.<\/p>\n<p>This final walkthrough is your last chance to catch anything you might have missed, so I never skip it, even on jobs where everything else has gone smoothly.<\/p>\n<h2>What Are Common Questions About PVC Flooring Preparation?<\/h2>\n<p><strong>Q: Can I lay PVC flooring directly over old vinyl or linoleum?<\/strong><br \/>\nIn many cases yes, as long as the existing surface is flat, well-bonded, and free of damage. I still recommend checking for a 3mm\/2m flatness tolerance first.<\/p>\n<p><strong>Q: Do I need an underlayment for glue-down vs. click-lock PVC?<\/strong><br \/>\nGlue-down systems usually don&#8217;t need underlayment since the adhesive bonds directly to the subfloor. Click-lock and SPC systems typically do, for sound reduction and minor surface forgiveness.<\/p>\n<p><strong>Q: How long after screeding or self-leveling can I lay PVC flooring?<\/strong><br \/>\nMost self-leveling compounds need at least 24 to 48 hours before installation, though this depends on the product and ambient humidity \u2014 always check the manufacturer&#8217;s data sheet.<\/p>\n<p><strong>Q: What happens if I don&#8217;t acclimate the PVC planks?<\/strong><br \/>\nSkipping acclimation is one of the top causes of post-installation problems, including seam gaps, buckling, or edge curling as the planks adjust to room conditions after the fact.<\/p>\n<h2>Conclusion<\/h2>\n<p>Clean, dry, flat, and acclimated \u2014 get these four right, and your PVC flooring will hold up for decades.<\/p>\n<hr \/>\n<p>If you&#8217;re planning a PVC flooring project and want a second opinion on your subfloor conditions, material selection, or installation approach, feel free to send me a message directly. I&#8217;m happy to help you think through the details before you start.<\/p>","protected":false},"excerpt":{"rendered":"<p>Proper preparation makes up about 80% of a successful PVC flooring installation. A dry, flat, clean, and acclimated subfloor is the real foundation of a smooth, long-lasting result. After years on the installation floor, I can tell you that most PVC flooring failures never come from the material itself. They come from what happened \u2014&#8230;<\/p>","protected":false},"author":4,"featured_media":9715,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[21],"tags":[],"class_list":["post-9711","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-pvc-floor-blog"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>What Preparation Before Laying PVC Flooring - MF FLOOR<\/title>\n<meta name=\"description\" content=\"A pro installer&#039;s guide to prepping subfloors for PVC flooring: moisture control, leveling, cleaning, and acclimation done right.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/meettfit.com\/fr\/pvc-floor-blog\/what-preparation-before-laying-pvc-flooring\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"What Preparation Before Laying PVC Flooring - MF FLOOR\" \/>\n<meta property=\"og:description\" content=\"A pro installer&#039;s guide to prepping subfloors for PVC flooring: moisture control, leveling, cleaning, and acclimation done right.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/meettfit.com\/fr\/pvc-floor-blog\/what-preparation-before-laying-pvc-flooring\/\" \/>\n<meta property=\"og:site_name\" content=\"MF FLOOR\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/profile.php?id=100079773047357\" \/>\n<meta property=\"article:published_time\" content=\"2026-08-07T07:01:34+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-3.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Leo\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"Leo\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-preparation-before-laying-pvc-flooring\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-preparation-before-laying-pvc-flooring\/\"},\"author\":{\"name\":\"Leo\",\"@id\":\"https:\/\/meettfit.com\/#\/schema\/person\/ba93f0ead95f571b725acc83f6544fef\"},\"headline\":\"What Preparation Before Laying PVC Flooring\",\"datePublished\":\"2026-08-07T07:01:34+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-preparation-before-laying-pvc-flooring\/\"},\"wordCount\":2034,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/meettfit.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-preparation-before-laying-pvc-flooring\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-3.jpg\",\"articleSection\":[\"Vinyl Flooring Insights\"],\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/meettfit.com\/pvc-floor-blog\/what-preparation-before-laying-pvc-flooring\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-preparation-before-laying-pvc-flooring\/\",\"url\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-preparation-before-laying-pvc-flooring\/\",\"name\":\"What Preparation Before Laying PVC Flooring - MF FLOOR\",\"isPartOf\":{\"@id\":\"https:\/\/meettfit.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-preparation-before-laying-pvc-flooring\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-preparation-before-laying-pvc-flooring\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-3.jpg\",\"datePublished\":\"2026-08-07T07:01:34+00:00\",\"description\":\"A pro installer's guide to prepping subfloors for PVC flooring: moisture control, leveling, cleaning, and acclimation done right.\",\"breadcrumb\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-preparation-before-laying-pvc-flooring\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/meettfit.com\/pvc-floor-blog\/what-preparation-before-laying-pvc-flooring\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-preparation-before-laying-pvc-flooring\/#primaryimage\",\"url\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-3.jpg\",\"contentUrl\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-3.jpg\",\"width\":800,\"height\":600,\"caption\":\"PVC Flooring (3)\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-preparation-before-laying-pvc-flooring\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/meettfit.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"What Preparation Before Laying PVC Flooring\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/meettfit.com\/#website\",\"url\":\"https:\/\/meettfit.com\/\",\"name\":\"MF FLOOR\",\"description\":\"fitness and sports floor China factory\",\"publisher\":{\"@id\":\"https:\/\/meettfit.com\/#organization\"},\"alternateName\":\"MF FLOOR\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/meettfit.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/meettfit.com\/#organization\",\"name\":\"MF FLOOR\",\"alternateName\":\"MF FLOOR\",\"url\":\"https:\/\/meettfit.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/meettfit.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2025\/02\/cropped-icon.png\",\"contentUrl\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2025\/02\/cropped-icon.png\",\"width\":512,\"height\":512,\"caption\":\"MF FLOOR\"},\"image\":{\"@id\":\"https:\/\/meettfit.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/profile.php?id=100079773047357\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/meettfit.com\/#\/schema\/person\/ba93f0ead95f571b725acc83f6544fef\",\"name\":\"Leo\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/meettfit.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/848b16970688cfb2f4cc64e85a2e2233183d3242ed0a21ffa4c859df339031f6?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/848b16970688cfb2f4cc64e85a2e2233183d3242ed0a21ffa4c859df339031f6?s=96&d=mm&r=g\",\"caption\":\"Leo\"},\"url\":\"https:\/\/meettfit.com\/fr\/author\/1659230944qq-com\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"What Preparation Before Laying PVC Flooring - MF FLOOR","description":"A pro installer's guide to prepping subfloors for PVC flooring: moisture control, leveling, cleaning, and acclimation done right.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/meettfit.com\/fr\/pvc-floor-blog\/what-preparation-before-laying-pvc-flooring\/","og_locale":"fr_FR","og_type":"article","og_title":"What Preparation Before Laying PVC Flooring - MF FLOOR","og_description":"A pro installer's guide to prepping subfloors for PVC flooring: moisture control, leveling, cleaning, and acclimation done right.","og_url":"https:\/\/meettfit.com\/fr\/pvc-floor-blog\/what-preparation-before-laying-pvc-flooring\/","og_site_name":"MF FLOOR","article_publisher":"https:\/\/www.facebook.com\/profile.php?id=100079773047357","article_published_time":"2026-08-07T07:01:34+00:00","og_image":[{"width":800,"height":600,"url":"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-3.jpg","type":"image\/jpeg"}],"author":"Leo","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"Leo","Dur\u00e9e de lecture estim\u00e9e":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-preparation-before-laying-pvc-flooring\/#article","isPartOf":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-preparation-before-laying-pvc-flooring\/"},"author":{"name":"Leo","@id":"https:\/\/meettfit.com\/#\/schema\/person\/ba93f0ead95f571b725acc83f6544fef"},"headline":"What Preparation Before Laying PVC Flooring","datePublished":"2026-08-07T07:01:34+00:00","mainEntityOfPage":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-preparation-before-laying-pvc-flooring\/"},"wordCount":2034,"commentCount":0,"publisher":{"@id":"https:\/\/meettfit.com\/#organization"},"image":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-preparation-before-laying-pvc-flooring\/#primaryimage"},"thumbnailUrl":"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-3.jpg","articleSection":["Vinyl Flooring Insights"],"inLanguage":"fr-FR","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/meettfit.com\/pvc-floor-blog\/what-preparation-before-laying-pvc-flooring\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-preparation-before-laying-pvc-flooring\/","url":"https:\/\/meettfit.com\/pvc-floor-blog\/what-preparation-before-laying-pvc-flooring\/","name":"What Preparation Before Laying PVC Flooring - MF FLOOR","isPartOf":{"@id":"https:\/\/meettfit.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-preparation-before-laying-pvc-flooring\/#primaryimage"},"image":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-preparation-before-laying-pvc-flooring\/#primaryimage"},"thumbnailUrl":"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-3.jpg","datePublished":"2026-08-07T07:01:34+00:00","description":"A pro installer's guide to prepping subfloors for PVC flooring: moisture control, leveling, cleaning, and acclimation done right.","breadcrumb":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-preparation-before-laying-pvc-flooring\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/meettfit.com\/pvc-floor-blog\/what-preparation-before-laying-pvc-flooring\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-preparation-before-laying-pvc-flooring\/#primaryimage","url":"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-3.jpg","contentUrl":"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-3.jpg","width":800,"height":600,"caption":"PVC Flooring (3)"},{"@type":"BreadcrumbList","@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-preparation-before-laying-pvc-flooring\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/meettfit.com\/"},{"@type":"ListItem","position":2,"name":"What Preparation Before Laying PVC Flooring"}]},{"@type":"WebSite","@id":"https:\/\/meettfit.com\/#website","url":"https:\/\/meettfit.com\/","name":"MF FLOOR","description":"fitness and sports floor China factory","publisher":{"@id":"https:\/\/meettfit.com\/#organization"},"alternateName":"MF FLOOR","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/meettfit.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/meettfit.com\/#organization","name":"MF FLOOR","alternateName":"MF FLOOR","url":"https:\/\/meettfit.com\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/meettfit.com\/#\/schema\/logo\/image\/","url":"https:\/\/meettfit.com\/wp-content\/uploads\/2025\/02\/cropped-icon.png","contentUrl":"https:\/\/meettfit.com\/wp-content\/uploads\/2025\/02\/cropped-icon.png","width":512,"height":512,"caption":"MF FLOOR"},"image":{"@id":"https:\/\/meettfit.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/profile.php?id=100079773047357"]},{"@type":"Person","@id":"https:\/\/meettfit.com\/#\/schema\/person\/ba93f0ead95f571b725acc83f6544fef","name":"Leo","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/meettfit.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/848b16970688cfb2f4cc64e85a2e2233183d3242ed0a21ffa4c859df339031f6?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/848b16970688cfb2f4cc64e85a2e2233183d3242ed0a21ffa4c859df339031f6?s=96&d=mm&r=g","caption":"Leo"},"url":"https:\/\/meettfit.com\/fr\/author\/1659230944qq-com\/"}]}},"_links":{"self":[{"href":"https:\/\/meettfit.com\/fr\/wp-json\/wp\/v2\/posts\/9711","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/meettfit.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/meettfit.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/meettfit.com\/fr\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/meettfit.com\/fr\/wp-json\/wp\/v2\/comments?post=9711"}],"version-history":[{"count":1,"href":"https:\/\/meettfit.com\/fr\/wp-json\/wp\/v2\/posts\/9711\/revisions"}],"predecessor-version":[{"id":9723,"href":"https:\/\/meettfit.com\/fr\/wp-json\/wp\/v2\/posts\/9711\/revisions\/9723"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/meettfit.com\/fr\/wp-json\/wp\/v2\/media\/9715"}],"wp:attachment":[{"href":"https:\/\/meettfit.com\/fr\/wp-json\/wp\/v2\/media?parent=9711"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/meettfit.com\/fr\/wp-json\/wp\/v2\/categories?post=9711"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/meettfit.com\/fr\/wp-json\/wp\/v2\/tags?post=9711"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}