{"id":10875,"date":"2026-11-10T18:00:40","date_gmt":"2026-11-10T10:00:40","guid":{"rendered":"https:\/\/meettfit.com\/?p=10875"},"modified":"2026-11-10T16:47:51","modified_gmt":"2026-11-10T08:47:51","slug":"what-needs-to-be-confirmed-in-the-detailed-drawings-for-a-pvc-flooring-project","status":"publish","type":"post","link":"https:\/\/meettfit.com\/fr\/pvc-floor-blog\/what-needs-to-be-confirmed-in-the-detailed-drawings-for-a-pvc-flooring-project\/","title":{"rendered":"What Needs to Be Confirmed in the Detailed Drawings for a PVC Flooring Project"},"content":{"rendered":"<p><strong>Confirm the drawing package, substrate and floor levels, exact products, layout, transitions, wall junctions, special zones, and compliance data. Each item needs the size, product code, or standard that applies, and a responsible party.<\/strong><\/p>\n<p>A PVC flooring drawing is a set of decisions. Each decision needs an owner, a version, and a place on the plan. When one is missing, the installer has to guess. This can lead to costly mistakes and disputes.<\/p>\n<p>This guide covers detailed drawings for commercial PVC sheet and LVT projects that are fully bonded. Floating click products have different edge and movement details, so use the manufacturer&#8217;s drawings for those. For every item below, the manufacturer&#8217;s written installation instructions come first. The numbers in this article are examples only.<\/p>\n<h2>What Should Be Included in a PVC Flooring Detailed Drawing Package?<\/h2>\n<p><strong>A full package has a floor plan with material zones, a finished floor level (FFL) plan, a layout plan, numbered detail drawings, a material schedule, and a revision log. Every sheet shows its version and approval status.<\/strong><\/p>\n<p>Problems start when the designer, buyer, and installer use different versions. Put a revision number and date on every sheet. Mark each sheet as draft, for review, or approved.<\/p>\n<h3>Core Documents<\/h3>\n<table>\n<thead>\n<tr>\n<th>Document<\/th>\n<th>What It Must Show<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Plan d'\u00e9tage<\/td>\n<td>Room names, material zones, product codes<\/td>\n<\/tr>\n<tr>\n<td>FFL plan<\/td>\n<td>Finished floor level for each area<\/td>\n<\/tr>\n<tr>\n<td>Layout plan<\/td>\n<td>Start lines, seams, pattern direction<\/td>\n<\/tr>\n<tr>\n<td>Detail drawings<\/td>\n<td>Numbered sections for each junction<\/td>\n<\/tr>\n<tr>\n<td>Material schedule<\/td>\n<td>Product, thickness, adhesive, accessories<\/td>\n<\/tr>\n<tr>\n<td>Revision log<\/td>\n<td>Changes, dates, and approvals<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Link the plan to the details with detail numbers, so a reader can find the section for any doorway, wall, or drain quickly.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/11\/PVC-Flooring-7-1.jpg&quot;\" alt=\"PVC flooring detailed drawing package with plan, detail index, and revision table\" \/><\/p>\n<h2>What Substrate Conditions and Floor Levels Must Be Confirmed?<\/h2>\n<p><strong>Confirm the flatness requirement, moisture test method and limit, surface preparation, joint types, and finished floor levels. All of these must follow the flooring manufacturer&#8217;s written instructions for the full system.<\/strong><\/p>\n<h3>Flatness and Levelness<\/h3>\n<p>Flatness and levelness are different things. Flatness describes deviations of a surface from a reference plane. Levelness describes how close the surface is to a set height. A floor can slope slightly and still be flat enough. State the allowed deviation, the measuring method, and the repair method if the slab fails. Some products ask for 3 mm over 2 m, but this is only an example. Use the figure from the selected product.<\/p>\n<h3>Moisture and Preparation<\/h3>\n<p>Write the moisture test method and the pass limit for the whole system: the flooring, the adhesive, and any treatment on the slab. In-situ RH testing under ASTM F2170 is one common method. Results from different methods cannot be swapped. If the plan uses a self-levelling compound, name the product and the target thickness.<\/p>\n<h3>Articulations<\/h3>\n<p>Separate the joint types on the drawing. Structural movement joints need a profile that moves with the building. Construction joints and dormant cracks may need different treatment. Do not cover them all the same way.<\/p>\n<table>\n<thead>\n<tr>\n<th>Objet<\/th>\n<th>Confirm on the Drawing<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Plan\u00e9it\u00e9<\/td>\n<td>Tolerance, measuring method, repair method<\/td>\n<\/tr>\n<tr>\n<td>Humidit\u00e9<\/td>\n<td>Test method, limit, adhesive approval<\/td>\n<\/tr>\n<tr>\n<td>Levelling layer<\/td>\n<td>Product and target thickness<\/td>\n<\/tr>\n<tr>\n<td>Articulations<\/td>\n<td>Type, position, and cover profile<\/td>\n<\/tr>\n<tr>\n<td>FFL<\/td>\n<td>Level for each area and for the next area<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>Which PVC Flooring Products and Materials Must Be Specified?<\/h2>\n<p><strong>List the full product name, maker code, colour, wear layer, total thickness, backing type, adhesive system, and welding rod. State the batch consistency and traceability rules. Actual batch numbers are checked at delivery.<\/strong><\/p>\n<h3>Product Identification<\/h3>\n<p>A name like &quot;grey vinyl&quot; is not a specification. Write the full name, code, colour number, wear layer, and total thickness. The vinyl is only one part of the floor build-up. List the thickness of each actual layer in the system, such as a levelling layer, so the FFL plan stays correct.<\/p>\n<p>Batch numbers are usually not known at the design stage. Specify batch consistency and traceability requirements. Use the same production batch within continuous visible areas wherever possible. Follow the manufacturer&#8217;s rules for roll sequence and for using different batches. Verify the actual batch numbers on delivery.<\/p>\n<h3>Adhesive and Accessories<\/h3>\n<p>Name the adhesive system the manufacturer approves for the product and the site. Check the backing, the slab condition, the cleaning method, and the rolling loads. For ESD flooring, confirm the maker&#8217;s rules for conductive adhesive, earthing points, and any copper strip layout. These differ between products.<\/p>\n<p>For heat-welded sheet, mark which seams need welding. Name the matching rod and the approved joint detail. Groove depth and weld timing follow the product&#8217;s installation instructions.<\/p>\n<table>\n<thead>\n<tr>\n<th>Objet<\/th>\n<th>Detail to Confirm<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Produit<\/td>\n<td>Name, code, colour, wear layer, thickness<\/td>\n<\/tr>\n<tr>\n<td>Batch<\/td>\n<td>Consistency and traceability rules<\/td>\n<\/tr>\n<tr>\n<td>Adh\u00e9sif<\/td>\n<td>Approved system for this product and site<\/td>\n<\/tr>\n<tr>\n<td>Baguette de soudure<\/td>\n<td>Colour code and approved joint detail<\/td>\n<\/tr>\n<tr>\n<td>Material allowance<\/td>\n<td>Based on the approved layout<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Do not use one fixed waste percentage. Waste depends on room shape, roll width, pattern matching, and cutting.<\/p>\n<h2>How Should Flooring Layouts, Seams, and Directions Be Shown?<\/h2>\n<p><strong>Show the start line, grid references, seam positions, roll or tile direction, and pattern match on the layout plan. Base these on the maker&#8217;s seam rules, roll width, and the real room size.<\/strong><\/p>\n<h3>What the Layout Plan Needs<\/h3>\n<p>A start point from the room centre works for some designs, but not for all of them. Staggered wood-look planks, herringbone, diagonal layouts, and sheet vinyl each need their own start rule. Tie the grid lines to fixed points such as columns or walls.<\/p>\n<p>Mark every seam. For sheet vinyl, check the roll width against the room so seams land where the design intends. Show the pattern direction with an arrow. Also specify whether adjacent sheets must be installed in the same or opposite direction, according to the selected product&#8217;s installation instructions. For planks and tiles, state the stagger rule and the smallest edge cut the design allows. This rule changes from project to project.<\/p>\n<p>Seam visibility depends on light, seam position, cleaning and maintenance, and rolling loads. Plan seams with the maker&#8217;s seam requirements, not with one general rule.<\/p>\n<table>\n<thead>\n<tr>\n<th>Layout Item<\/th>\n<th>Confirm on the Layout Drawing<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Start line<\/td>\n<td>Reference to a fixed grid point<\/td>\n<\/tr>\n<tr>\n<td>Roll or tile direction<\/td>\n<td>Arrow on the plan, and same or opposite direction for adjacent sheets<\/td>\n<\/tr>\n<tr>\n<td>Emplacements des coutures<\/td>\n<td>Marked, with the maker&#8217;s seam rule<\/td>\n<\/tr>\n<tr>\n<td>Pattern match<\/td>\n<td>Type and repeat<\/td>\n<\/tr>\n<tr>\n<td>Edge cuts<\/td>\n<td>Smallest allowed cut for this design<\/td>\n<\/tr>\n<tr>\n<td>Room dimensions<\/td>\n<td>Design size and measured size<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><img decoding=\"async\" src=\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/11\/PVC-Flooring-5-1.jpg&quot;\" alt=\"PVC flooring layout plan with material zones, seam lines, direction arrows, and detail references\" \/><\/p>\n<h2>Which Thresholds, Transitions, and Perimeter Details Need Approval?<\/h2>\n<p><strong>Approve each doorway with the FFL on both sides, the profile type, its height, the fixing method, and the door clearance. The flooring thickness is not the same as the full floor build-up.<\/strong><\/p>\n<h3>Levels and Door Clearance<\/h3>\n<p>A vinyl sheet may be 2 mm thick, but the full system can be much thicker once a levelling layer is added. Always compare the FFL on both sides of the door. Then check that the door leaf still opens and closes with the new floor in place.<\/p>\n<p>Accessibility rules also apply. In the US, the 2010 ADA Standards limit level changes and threshold height on accessible routes. Other regions have their own rules. Check the code that applies to your project.<\/p>\n<h3>Perimeter Details<\/h3>\n<p>Edge treatment depends on the installation system. Fully bonded sheet and bonded LVT follow the manufacturer&#8217;s detail drawing for each product. If a flush or recessed edge is planned, confirm the required slab depth and how the build-up will be formed.<\/p>\n<table>\n<thead>\n<tr>\n<th>Junction<\/th>\n<th>Confirm on the Drawing<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Vinyl to carpet<\/td>\n<td>FFL both sides, profile, fixing<\/td>\n<\/tr>\n<tr>\n<td>Vinyl to tile<\/td>\n<td>FFL both sides, profile, gap if needed<\/td>\n<\/tr>\n<tr>\n<td>Vinyl to concrete<\/td>\n<td>Height difference, ramp or end profile<\/td>\n<\/tr>\n<tr>\n<td>Door frame<\/td>\n<td>Cut detail and sealing method<\/td>\n<\/tr>\n<tr>\n<td>Column, wall, millwork<\/td>\n<td>Perimeter detail by installation system<\/td>\n<\/tr>\n<tr>\n<td>Door clearance<\/td>\n<td>Gap under the leaf after finishing<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>What Coving, Skirting, and Wall Junction Details Are Required?<\/h2>\n<p><strong>Draw the coving height, radius support, capping strip, corner details, and end details. For skirting, state the material, profile, and fixing method. Follow the manufacturer&#8217;s detail for the installation system.<\/strong><\/p>\n<h3>Coving<\/h3>\n<p>Coved sheet vinyl is common in healthcare, labs, and kitchens, because it removes the hard corner between floor and wall. Heights such as 100 mm to 150 mm appear on many projects, but the project spec sets the real height. Show the coving former or support, the capping strip, and how the wall behind it must be prepared. Draw inside and outside corner details, since they are hard to improvise on site.<\/p>\n<h3>Skirting and Protection<\/h3>\n<p>Skirting can be PVC, rubber, or timber-based. Write the profile, height, corner details, and end caps. In busy areas, show corner guards and impact rails where trolleys or beds meet the wall.<\/p>\n<table>\n<thead>\n<tr>\n<th>Objet<\/th>\n<th>Confirm on the Drawing<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Coving<\/td>\n<td>Height, support, capping, corner details<\/td>\n<\/tr>\n<tr>\n<td>Wall condition<\/td>\n<td>Surface prepared for coving<\/td>\n<\/tr>\n<tr>\n<td>Skirting<\/td>\n<td>Material, profile, height, fixing<\/td>\n<\/tr>\n<tr>\n<td>Corner and end parts<\/td>\n<td>Listed by location<\/td>\n<\/tr>\n<tr>\n<td>Protection des murs<\/td>\n<td>Type and extent<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><img decoding=\"async\" src=\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/11\/PVC-Flooring-9.jpg&quot;\" alt=\"PVC flooring coving section drawing showing height, support, and capping strip\" \/><\/p>\n<h2>What Special Details Are Needed for Wet Areas, Stairs, and Heavy Loads?<\/h2>\n<p><strong>Wet areas need the drainage slope, approved wet-room system, drain connection, and pipe details. Stairs need an approved nosing and slip detail. Heavy zones need the real wheel load and contact area.<\/strong><\/p>\n<h3>Zones humides<\/h3>\n<p>Wet-room systems are not all built the same way. Some use a separate waterproof layer. Others rely on the approved flooring, heat-welded seams, drain clamping rings, and a continuous floor-to-wall detail. Show the slope, the drain connection, the wall junction, and every pipe penetration. Any separate membrane must be coordinated with the approved system. The slope also follows local code and the project design.<\/p>\n<h3>Escaliers<\/h3>\n<p>Use the approved stair nosing and slip-resistant detail for the selected floor. Show the riser and tread build-up and how each edge is protected. Not every system uses a wrap-around nosing.<\/p>\n<h3>Heavy Traffic and Equipment Zones<\/h3>\n<p>Do not choose by a &quot;heavy-duty&quot; label. Use the real wheel load, contact area, dynamic use, and the manufacturer&#8217;s test data. Check what the slab can carry as well.<\/p>\n<table>\n<thead>\n<tr>\n<th>Zone<\/th>\n<th>Confirm on the Drawing<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Wet area<\/td>\n<td>Slope, system, drain, wall junction, pipes<\/td>\n<\/tr>\n<tr>\n<td>Stairs<\/td>\n<td>Nosing, slip detail, riser and tread build-up<\/td>\n<\/tr>\n<tr>\n<td>Heavy loads<\/td>\n<td>Load values, product test data, slab check<\/td>\n<\/tr>\n<tr>\n<td>Equipment bases<\/td>\n<td>Floor interface and sealing detail<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>Which Performance and Compliance Requirements Must Be Referenced?<\/h2>\n<p><strong>Reference the test method, the required result, and the project jurisdiction for slip, fire, and indoor air quality. Do not treat results from different test systems as equal. Keep test documents for the exact flooring system.<\/strong><\/p>\n<h3>R\u00e9sistance au glissement<\/h3>\n<p>Specify the slip-resistance test method required for the selected PVC flooring product and its intended use. Different test methods measure different properties, and their results should not be treated as interchangeable. Confirm the applicable requirements with the project specification and local regulations.<\/p>\n<h3>Incendie<\/h3>\n<p>EN 13501-1 provides reaction-to-fire classifications such as Bfl-s1. In the US, ASTM E648 measures the critical radiant flux of floor-covering systems, while applicable building codes may use the test result to classify flooring as Class I or Class II. Confirm which requirements apply to the project. Fire classification must be supported by test documents for the specified flooring system and the project&#8217;s jurisdiction.<\/p>\n<h3>Qualit\u00e9 de l'air int\u00e9rieur<\/h3>\n<p>FloorScore and GREENGUARD Gold are separate programs. Do not imply that they have the same limits. Check the adhesive and other products against the same project requirement.<\/p>\n<table>\n<thead>\n<tr>\n<th>Exigence<\/th>\n<th>Confirm on the Drawing or Schedule<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Glissement<\/td>\n<td>Test method, required result, use condition<\/td>\n<\/tr>\n<tr>\n<td>Incendie<\/td>\n<td>Classification system and test documents<\/td>\n<\/tr>\n<tr>\n<td>Qualit\u00e9 de l'air<\/td>\n<td>Certificate name and product coverage<\/td>\n<\/tr>\n<tr>\n<td>Local code<\/td>\n<td>Authority and code edition<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>Who Should Review and Approve the Drawings Before Installation?<\/h2>\n<p><strong>The designer, main contractor, flooring installer, and supplier each review the parts they own. Assign every drawing issue to a responsible party, record its status, and follow the project&#8217;s formal approval procedure.<\/strong><\/p>\n<h3>Roles and Interfaces<\/h3>\n<p>Flooring meets many other trades. Drains, pipes, column bases, equipment plinths, doors, and wall finishes all touch the floor. Each interface needs a named owner. Supplier technical confirmation is not the same as formal approval by the designer or the client, so check who holds approval authority on the project.<\/p>\n<p>Assign each drawing issue to the responsible party and record its status. Resolve issues that affect product selection, quantities, or fabrication before ordering. Complete the remaining required site and installation approvals before the affected work begins, following the project&#8217;s approval procedure.<\/p>\n<h3>Design Levels and Site Facts<\/h3>\n<p>Mark where each level comes from: a design level, an as-built record, or a measurement taken on site. Do not mix them. A design level that has not been checked on site is still an assumption.<\/p>\n<table>\n<thead>\n<tr>\n<th>Review Item<\/th>\n<th>Propri\u00e9taire<\/th>\n<th>Enregistrement<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Drawing version<\/td>\n<td>Designer<\/td>\n<td>Revision log<\/td>\n<\/tr>\n<tr>\n<td>Material codes and zones<\/td>\n<td>Supplier<\/td>\n<td>Schedule sign-off<\/td>\n<\/tr>\n<tr>\n<td>Levels and door clearance<\/td>\n<td>Main contractor<\/td>\n<td>FFL plan<\/td>\n<\/tr>\n<tr>\n<td>Trade interfaces<\/td>\n<td>Main contractor<\/td>\n<td>Issue log<\/td>\n<\/tr>\n<tr>\n<td>D\u00e9tails de l'installation<\/td>\n<td>Installateur<\/td>\n<td>Detail approval<\/td>\n<\/tr>\n<tr>\n<td>Open issues<\/td>\n<td>Named person<\/td>\n<td>Status and closing note<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>What Is the Final PVC Flooring Detailed Drawing Review Checklist?<\/h2>\n<p><strong>Use this checklist to confirm that required drawing details are complete, critical conflicts are resolved, and outstanding site checks are assigned. Final approval must follow the project&#8217;s formal review and sign-off process.<\/strong><\/p>\n<table>\n<thead>\n<tr>\n<th>Objet<\/th>\n<th>At the Drawing Stage<\/th>\n<th>At the Site or Supply Stage<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Humidit\u00e9<\/td>\n<td>State test method and limit<\/td>\n<td>Test and record results<\/td>\n<\/tr>\n<tr>\n<td>Plan\u00e9it\u00e9<\/td>\n<td>State tolerance and method<\/td>\n<td>Measure and repair as needed<\/td>\n<\/tr>\n<tr>\n<td>Levelling layer<\/td>\n<td>State system and target level<\/td>\n<td>Check against real conditions<\/td>\n<\/tr>\n<tr>\n<td>Material batch<\/td>\n<td>State consistency and traceability rules<\/td>\n<td>Check actual batch numbers<\/td>\n<\/tr>\n<tr>\n<td>Mise en page<\/td>\n<td>Fix direction and seam positions<\/td>\n<td>Check site dimensions and set-out lines<\/td>\n<\/tr>\n<tr>\n<td>Adh\u00e9sif<\/td>\n<td>State approved system<\/td>\n<td>Check delivered product and site conditions<\/td>\n<\/tr>\n<tr>\n<td>Conditionnement<\/td>\n<td>Record the manufacturer&#8217;s temperature, humidity, and HVAC rules<\/td>\n<td>Monitor before, during, and after installation<\/td>\n<\/tr>\n<tr>\n<td>Transitions<\/td>\n<td>Give FFL and profile for each doorway<\/td>\n<td>Check built heights and door clearance<\/td>\n<\/tr>\n<tr>\n<td>Wet areas<\/td>\n<td>State system and details<\/td>\n<td>Check drains and pipe penetrations<\/td>\n<\/tr>\n<tr>\n<td>Conformit\u00e9<\/td>\n<td>List standards and test documents<\/td>\n<td>File the documents<\/td>\n<\/tr>\n<tr>\n<td>Handover<\/td>\n<td>State what records are required<\/td>\n<td>Collect tests, changes, and sign-offs<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><img decoding=\"async\" src=\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/11\/PVC-Flooring-6-1.jpg&quot;\" alt=\"PVC flooring drawing review sheet with revision number, detail index, and open issue status\" \/><\/p>\n<h2>Conclusion<\/h2>\n<p>Clear drawings help the whole team agree on the same floor. State each item, name its owner, and follow the manufacturer&#8217;s written instructions.<\/p>\n<h2>A propos de l'auteur<\/h2>\n<p>I work in the custom and bulk PVC flooring manufacturing field, with experience in production methods, material selection, and design optimisation. I have supported custom PVC flooring projects across several industries and help teams work through technical questions at the design stage.<\/p>","protected":false},"excerpt":{"rendered":"<p>Confirm the drawing package, substrate and floor levels, exact products, layout, transitions, wall junctions, special zones, and compliance data. Each item needs the size, product code, or standard that applies, and a responsible party. A PVC flooring drawing is a set of decisions. Each decision needs an owner, a version, and a place on the&#8230;<\/p>","protected":false},"author":4,"featured_media":10883,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[21],"tags":[],"class_list":["post-10875","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-pvc-floor-blog"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>What Needs to Be Confirmed in the Detailed Drawings for a PVC Flooring Project - MF FLOOR<\/title>\n<meta name=\"description\" content=\"Learn what PVC flooring detailed drawings should include, from substrate and floor levels to seams, transitions and approvals.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/meettfit.com\/fr\/pvc-floor-blog\/what-needs-to-be-confirmed-in-the-detailed-drawings-for-a-pvc-flooring-project\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"What Needs to Be Confirmed in the Detailed Drawings for a PVC Flooring Project - MF FLOOR\" \/>\n<meta property=\"og:description\" content=\"Learn what PVC flooring detailed drawings should include, from substrate and floor levels to seams, transitions and approvals.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/meettfit.com\/fr\/pvc-floor-blog\/what-needs-to-be-confirmed-in-the-detailed-drawings-for-a-pvc-flooring-project\/\" \/>\n<meta property=\"og:site_name\" content=\"MF FLOOR\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/profile.php?id=100079773047357\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-10T10:00:40+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/11\/PVC-Flooring-8-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Leo\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"Leo\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-needs-to-be-confirmed-in-the-detailed-drawings-for-a-pvc-flooring-project\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-needs-to-be-confirmed-in-the-detailed-drawings-for-a-pvc-flooring-project\/\"},\"author\":{\"name\":\"Leo\",\"@id\":\"https:\/\/meettfit.com\/#\/schema\/person\/ba93f0ead95f571b725acc83f6544fef\"},\"headline\":\"What Needs to Be Confirmed in the Detailed Drawings for a PVC Flooring Project\",\"datePublished\":\"2026-11-10T10:00:40+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-needs-to-be-confirmed-in-the-detailed-drawings-for-a-pvc-flooring-project\/\"},\"wordCount\":2374,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/meettfit.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-needs-to-be-confirmed-in-the-detailed-drawings-for-a-pvc-flooring-project\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/11\/PVC-Flooring-8-1.jpg\",\"articleSection\":[\"Vinyl Flooring Insights\"],\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/meettfit.com\/pvc-floor-blog\/what-needs-to-be-confirmed-in-the-detailed-drawings-for-a-pvc-flooring-project\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-needs-to-be-confirmed-in-the-detailed-drawings-for-a-pvc-flooring-project\/\",\"url\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-needs-to-be-confirmed-in-the-detailed-drawings-for-a-pvc-flooring-project\/\",\"name\":\"What Needs to Be Confirmed in the Detailed Drawings for a PVC Flooring Project - MF FLOOR\",\"isPartOf\":{\"@id\":\"https:\/\/meettfit.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-needs-to-be-confirmed-in-the-detailed-drawings-for-a-pvc-flooring-project\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-needs-to-be-confirmed-in-the-detailed-drawings-for-a-pvc-flooring-project\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/11\/PVC-Flooring-8-1.jpg\",\"datePublished\":\"2026-11-10T10:00:40+00:00\",\"description\":\"Learn what PVC flooring detailed drawings should include, from substrate and floor levels to seams, transitions and approvals.\",\"breadcrumb\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-needs-to-be-confirmed-in-the-detailed-drawings-for-a-pvc-flooring-project\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/meettfit.com\/pvc-floor-blog\/what-needs-to-be-confirmed-in-the-detailed-drawings-for-a-pvc-flooring-project\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-needs-to-be-confirmed-in-the-detailed-drawings-for-a-pvc-flooring-project\/#primaryimage\",\"url\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/11\/PVC-Flooring-8-1.jpg\",\"contentUrl\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/11\/PVC-Flooring-8-1.jpg\",\"width\":800,\"height\":600,\"caption\":\"PVC Flooring (8)\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-needs-to-be-confirmed-in-the-detailed-drawings-for-a-pvc-flooring-project\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/meettfit.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"What Needs to Be Confirmed in the Detailed Drawings for a PVC Flooring Project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/meettfit.com\/#website\",\"url\":\"https:\/\/meettfit.com\/\",\"name\":\"MF FLOOR\",\"description\":\"fitness and sports floor China factory\",\"publisher\":{\"@id\":\"https:\/\/meettfit.com\/#organization\"},\"alternateName\":\"MF FLOOR\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/meettfit.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/meettfit.com\/#organization\",\"name\":\"MF FLOOR\",\"alternateName\":\"MF FLOOR\",\"url\":\"https:\/\/meettfit.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/meettfit.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2025\/02\/cropped-icon.png\",\"contentUrl\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2025\/02\/cropped-icon.png\",\"width\":512,\"height\":512,\"caption\":\"MF FLOOR\"},\"image\":{\"@id\":\"https:\/\/meettfit.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/profile.php?id=100079773047357\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/meettfit.com\/#\/schema\/person\/ba93f0ead95f571b725acc83f6544fef\",\"name\":\"Leo\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/meettfit.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/848b16970688cfb2f4cc64e85a2e2233183d3242ed0a21ffa4c859df339031f6?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/848b16970688cfb2f4cc64e85a2e2233183d3242ed0a21ffa4c859df339031f6?s=96&d=mm&r=g\",\"caption\":\"Leo\"},\"url\":\"https:\/\/meettfit.com\/fr\/author\/1659230944qq-com\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"What Needs to Be Confirmed in the Detailed Drawings for a PVC Flooring Project - MF FLOOR","description":"Learn what PVC flooring detailed drawings should include, from substrate and floor levels to seams, transitions and approvals.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/meettfit.com\/fr\/pvc-floor-blog\/what-needs-to-be-confirmed-in-the-detailed-drawings-for-a-pvc-flooring-project\/","og_locale":"fr_FR","og_type":"article","og_title":"What Needs to Be Confirmed in the Detailed Drawings for a PVC Flooring Project - MF FLOOR","og_description":"Learn what PVC flooring detailed drawings should include, from substrate and floor levels to seams, transitions and approvals.","og_url":"https:\/\/meettfit.com\/fr\/pvc-floor-blog\/what-needs-to-be-confirmed-in-the-detailed-drawings-for-a-pvc-flooring-project\/","og_site_name":"MF FLOOR","article_publisher":"https:\/\/www.facebook.com\/profile.php?id=100079773047357","article_published_time":"2026-11-10T10:00:40+00:00","og_image":[{"width":800,"height":600,"url":"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/11\/PVC-Flooring-8-1.jpg","type":"image\/jpeg"}],"author":"Leo","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"Leo","Dur\u00e9e de lecture estim\u00e9e":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-needs-to-be-confirmed-in-the-detailed-drawings-for-a-pvc-flooring-project\/#article","isPartOf":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-needs-to-be-confirmed-in-the-detailed-drawings-for-a-pvc-flooring-project\/"},"author":{"name":"Leo","@id":"https:\/\/meettfit.com\/#\/schema\/person\/ba93f0ead95f571b725acc83f6544fef"},"headline":"What Needs to Be Confirmed in the Detailed Drawings for a PVC Flooring Project","datePublished":"2026-11-10T10:00:40+00:00","mainEntityOfPage":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-needs-to-be-confirmed-in-the-detailed-drawings-for-a-pvc-flooring-project\/"},"wordCount":2374,"commentCount":0,"publisher":{"@id":"https:\/\/meettfit.com\/#organization"},"image":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-needs-to-be-confirmed-in-the-detailed-drawings-for-a-pvc-flooring-project\/#primaryimage"},"thumbnailUrl":"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/11\/PVC-Flooring-8-1.jpg","articleSection":["Vinyl Flooring Insights"],"inLanguage":"fr-FR","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/meettfit.com\/pvc-floor-blog\/what-needs-to-be-confirmed-in-the-detailed-drawings-for-a-pvc-flooring-project\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-needs-to-be-confirmed-in-the-detailed-drawings-for-a-pvc-flooring-project\/","url":"https:\/\/meettfit.com\/pvc-floor-blog\/what-needs-to-be-confirmed-in-the-detailed-drawings-for-a-pvc-flooring-project\/","name":"What Needs to Be Confirmed in the Detailed Drawings for a PVC Flooring Project - MF FLOOR","isPartOf":{"@id":"https:\/\/meettfit.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-needs-to-be-confirmed-in-the-detailed-drawings-for-a-pvc-flooring-project\/#primaryimage"},"image":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-needs-to-be-confirmed-in-the-detailed-drawings-for-a-pvc-flooring-project\/#primaryimage"},"thumbnailUrl":"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/11\/PVC-Flooring-8-1.jpg","datePublished":"2026-11-10T10:00:40+00:00","description":"Learn what PVC flooring detailed drawings should include, from substrate and floor levels to seams, transitions and approvals.","breadcrumb":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-needs-to-be-confirmed-in-the-detailed-drawings-for-a-pvc-flooring-project\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/meettfit.com\/pvc-floor-blog\/what-needs-to-be-confirmed-in-the-detailed-drawings-for-a-pvc-flooring-project\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-needs-to-be-confirmed-in-the-detailed-drawings-for-a-pvc-flooring-project\/#primaryimage","url":"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/11\/PVC-Flooring-8-1.jpg","contentUrl":"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/11\/PVC-Flooring-8-1.jpg","width":800,"height":600,"caption":"PVC Flooring (8)"},{"@type":"BreadcrumbList","@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-needs-to-be-confirmed-in-the-detailed-drawings-for-a-pvc-flooring-project\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/meettfit.com\/"},{"@type":"ListItem","position":2,"name":"What Needs to Be Confirmed in the Detailed Drawings for a PVC Flooring Project"}]},{"@type":"WebSite","@id":"https:\/\/meettfit.com\/#website","url":"https:\/\/meettfit.com\/","name":"MF FLOOR","description":"fitness and sports floor China factory","publisher":{"@id":"https:\/\/meettfit.com\/#organization"},"alternateName":"MF FLOOR","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/meettfit.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/meettfit.com\/#organization","name":"MF FLOOR","alternateName":"MF FLOOR","url":"https:\/\/meettfit.com\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/meettfit.com\/#\/schema\/logo\/image\/","url":"https:\/\/meettfit.com\/wp-content\/uploads\/2025\/02\/cropped-icon.png","contentUrl":"https:\/\/meettfit.com\/wp-content\/uploads\/2025\/02\/cropped-icon.png","width":512,"height":512,"caption":"MF FLOOR"},"image":{"@id":"https:\/\/meettfit.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/profile.php?id=100079773047357"]},{"@type":"Person","@id":"https:\/\/meettfit.com\/#\/schema\/person\/ba93f0ead95f571b725acc83f6544fef","name":"Leo","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/meettfit.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/848b16970688cfb2f4cc64e85a2e2233183d3242ed0a21ffa4c859df339031f6?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/848b16970688cfb2f4cc64e85a2e2233183d3242ed0a21ffa4c859df339031f6?s=96&d=mm&r=g","caption":"Leo"},"url":"https:\/\/meettfit.com\/fr\/author\/1659230944qq-com\/"}]}},"_links":{"self":[{"href":"https:\/\/meettfit.com\/fr\/wp-json\/wp\/v2\/posts\/10875","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/meettfit.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/meettfit.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/meettfit.com\/fr\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/meettfit.com\/fr\/wp-json\/wp\/v2\/comments?post=10875"}],"version-history":[{"count":1,"href":"https:\/\/meettfit.com\/fr\/wp-json\/wp\/v2\/posts\/10875\/revisions"}],"predecessor-version":[{"id":10886,"href":"https:\/\/meettfit.com\/fr\/wp-json\/wp\/v2\/posts\/10875\/revisions\/10886"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/meettfit.com\/fr\/wp-json\/wp\/v2\/media\/10883"}],"wp:attachment":[{"href":"https:\/\/meettfit.com\/fr\/wp-json\/wp\/v2\/media?parent=10875"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/meettfit.com\/fr\/wp-json\/wp\/v2\/categories?post=10875"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/meettfit.com\/fr\/wp-json\/wp\/v2\/tags?post=10875"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}