{"id":9838,"date":"2026-08-17T15:00:01","date_gmt":"2026-08-17T07:00:01","guid":{"rendered":"https:\/\/meettfit.com\/?p=9838"},"modified":"2026-08-17T11:17:52","modified_gmt":"2026-08-17T03:17:52","slug":"what-pvc-flooring-data-should-a-bim-model-include","status":"publish","type":"post","link":"https:\/\/meettfit.com\/es\/blog-sobre-suelos-de-pvc\/que-datos-sobre-los-suelos-de-pvc-debe-incluir-un-modelo-bim\/","title":{"rendered":"\u00bfQu\u00e9 datos sobre suelos de PVC debe incluir un modelo BIM?"},"content":{"rendered":"<p><strong>Un modelo BIM de un suelo de PVC debe incluir datos sobre la identificaci\u00f3n, la geometr\u00eda, los materiales, el rendimiento, la sostenibilidad, la instalaci\u00f3n, el coste y el ciclo de vida de la gesti\u00f3n de instalaciones, cada uno de ellos estructurado con el tipo de par\u00e1metro, la unidad y la referencia de ensayo adecuados.<\/strong><\/p>\n<p>Llevo a\u00f1os trabajando en el \u00e1mbito de la fabricaci\u00f3n de suelos de PVC y veo c\u00f3mo se repite el mismo problema una y otra vez. En un modelo aparece un rect\u00e1ngulo plano etiquetado como \u00absuelo de vinilo\u00bb, sin m\u00e1s. Entonces empiezan las solicitudes de informaci\u00f3n (RFI), el proceso de adquisici\u00f3n se estanca y los equipos de instalaciones se encuentran con un suelo del que no disponen de datos de mantenimiento. Un objeto BIM \u00fatil es un contenedor de datos, no solo una forma, y necesita una estructura definida.<\/p>\n<p>A continuaci\u00f3n se indica qu\u00e9 debe contener ese contenedor, c\u00f3mo organizarlo y c\u00f3mo se corresponde con est\u00e1ndares abiertos como IFC y COBie.<\/p>\n<h2>Por qu\u00e9 los datos detallados son m\u00e1s importantes que los objetos gen\u00e9ricos<\/h2>\n<p><strong>Generic flooring objects cause RFIs and procurement errors. The required data depth should follow the project&#8217;s information requirements and BIM Execution Plan, not a fixed LOD assumption.<\/strong><\/p>\n<p>A model with no product code, fire rating, or slip value forces every downstream team to chase missing specs manually. Rather than assuming a fixed LOD target, the model&#8217;s detail should match what the project&#8217;s exchange requirements actually demand at each stage \u2014 enough to support coordination, specification, and procurement by construction stage.<\/p>\n<h2>Categor\u00edas principales de datos<\/h2>\n<p><strong>Los datos BIM de los suelos de PVC se clasifican en siete grupos: geometr\u00eda, material\/producto, prestaciones, sostenibilidad, instalaci\u00f3n, coste y gesti\u00f3n de instalaciones\/ciclo de vida.<\/strong><\/p>\n<ul>\n<li><strong>Geometr\u00eda:<\/strong> espesor total, tama\u00f1o de las tablas o baldosas o anchura del rollo, patr\u00f3n de instalaci\u00f3n, subsuelo y detalles de transici\u00f3n. La modelizaci\u00f3n del patr\u00f3n facilita la coordinaci\u00f3n de la distribuci\u00f3n, pero la provisi\u00f3n para desperdicios debe seguir siendo una cifra de adquisici\u00f3n independiente, ya que el desperdicio real depende de la forma de la estancia, el plan de juntas y la coincidencia de lotes, y no solo de la geometr\u00eda.<\/li>\n<li><strong>Material\/Producto:<\/strong> fabricante, c\u00f3digo del producto, tipo de suelo (homog\u00e9neo, heterog\u00e9neo, LVT), color y base. En el caso de los suelos heterog\u00e9neos o LVT, anote el espesor de la capa de desgaste por separado del espesor total. En el caso del vinilo homog\u00e9neo, anote en su lugar el tipo de estructura, ya que su espesor es uniforme en toda su extensi\u00f3n.<\/li>\n<li><strong>Rendimiento:<\/strong> resistencia al deslizamiento, clasificaci\u00f3n frente al fuego, rendimiento ac\u00fastico, resistencia a la indentaci\u00f3n, resistencia qu\u00edmica, datos sobre COV. Cada valor de rendimiento debe ir acompa\u00f1ado de su m\u00e9todo de ensayo y su norma correspondiente; no basta con indicar \u00fanicamente el DCOF o el valor R, ya que los umbrales var\u00edan en funci\u00f3n de la norma y la clasificaci\u00f3n de uso.<\/li>\n<li><strong>Sostenibilidad:<\/strong> certificaciones (FloorScore, EPD), contenido reciclado, duraci\u00f3n de la garant\u00eda y cumplimiento de la normativa regional.<\/li>\n<li><strong>Instalaci\u00f3n:<\/strong> tipo de adhesivo, l\u00edmites de humedad y nivelaci\u00f3n del subsuelo, m\u00e9todo de instalaci\u00f3n, necesidad de juntas de dilataci\u00f3n.<\/li>\n<li><strong>Costes\/Adquisiciones:<\/strong> el coste unitario, el proveedor y el plazo de entrega, as\u00ed como la tolerancia de desperdicio como campo independiente.<\/li>\n<li><strong>FM\/Ciclo de vida:<\/strong> vida \u00fatil prevista, calendario de mantenimiento, ciclo de sustituci\u00f3n, etiqueta de identificaci\u00f3n del activo para CAFM\/CMMS, n\u00famero de lote, fecha de instalaci\u00f3n.<\/li>\n<\/ul>\n<p><img decoding=\"async\" src=\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-1-10.jpg&quot;\" alt=\"Categor\u00edas de datos sobre suelos de PVC\" \/><\/p>\n<h2>Lista completa de comprobaci\u00f3n de par\u00e1metros<\/h2>\n<p><strong>Una lista de comprobaci\u00f3n operativa debe incluir el par\u00e1metro, el tipo de datos, la unidad, el estado de tipo\/instancia y el estado de obligatorio\/opcional para cada campo.<\/strong><\/p>\n<table>\n<thead>\n<tr>\n<th>Categor\u00eda<\/th>\n<th>Par\u00e1metro<\/th>\n<th>Tipo de datos \/ Unidad<\/th>\n<th>Tipo o instancia<\/th>\n<th>Obligatorio<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Identidad<\/td>\n<td>Fabricante, c\u00f3digo de producto, tipo de suelo, c\u00f3digo de clasificaci\u00f3n<\/td>\n<td>Texto<\/td>\n<td>Tipo<\/td>\n<td>Obligatorio<\/td>\n<\/tr>\n<tr>\n<td>Geometr\u00eda<\/td>\n<td>Espesor total (mm), capa de desgaste (mm), tama\u00f1o de baldosa\/l\u00e1mina, ancho del rollo<\/td>\n<td>N\u00famero\/Dimensi\u00f3n<\/td>\n<td>Tipo<\/td>\n<td>Obligatorio<\/td>\n<\/tr>\n<tr>\n<td>Geometr\u00eda<\/td>\n<td>Esquema de instalaci\u00f3n, superficie de cobertura (m\u00b2)<\/td>\n<td>Texto\/N\u00famero<\/td>\n<td>Instancia<\/td>\n<td>Recomendado<\/td>\n<\/tr>\n<tr>\n<td>Rendimiento<\/td>\n<td>Valor de resistencia al deslizamiento + M\u00e9todo de ensayo<\/td>\n<td>N\u00famero + Texto<\/td>\n<td>Tipo<\/td>\n<td>Obligatorio<\/td>\n<\/tr>\n<tr>\n<td>Rendimiento<\/td>\n<td>Clasificaci\u00f3n de resistencia al fuego, reducci\u00f3n del ruido de impacto (dB), deformaci\u00f3n residual (mm)<\/td>\n<td>Texto\/N\u00famero<\/td>\n<td>Tipo<\/td>\n<td>Obligatorio\/Recomendado<\/td>\n<\/tr>\n<tr>\n<td>Sostenibilidad<\/td>\n<td>Certificaci\u00f3n de COV, n\u00famero de EPD, contenido reciclado (%), garant\u00eda (a\u00f1os)<\/td>\n<td>Texto\/N\u00famero<\/td>\n<td>Tipo<\/td>\n<td>Recomendado<\/td>\n<\/tr>\n<tr>\n<td>Instalaci\u00f3n<\/td>\n<td>Tipo de adhesivo, l\u00edmite de humedad del subsuelo, m\u00e9todo de instalaci\u00f3n<\/td>\n<td>Texto\/N\u00famero<\/td>\n<td>Tipo<\/td>\n<td>Obligatorio<\/td>\n<\/tr>\n<tr>\n<td>Coste<\/td>\n<td>Coste unitario, plazo de entrega, margen de desperdicio (%)<\/td>\n<td>N\u00famero<\/td>\n<td>Instancia\/Tipo<\/td>\n<td>Recomendado<\/td>\n<\/tr>\n<tr>\n<td>FM<\/td>\n<td>Vida \u00fatil prevista, calendario de mantenimiento (enlace), fecha de instalaci\u00f3n, n\u00famero de lote, fecha de sustituci\u00f3n<\/td>\n<td>N\u00famero\/Texto\/Fecha<\/td>\n<td>Instancia<\/td>\n<td>Obligatorio\/Recomendado<\/td>\n<\/tr>\n<tr>\n<td>Verificaci\u00f3n<\/td>\n<td>Revisi\u00f3n del TDS, norma de ensayo, n\u00famero de certificado, fecha de caducidad del certificado, fecha de la \u00faltima actualizaci\u00f3n de los datos<\/td>\n<td>Texto\/Fecha<\/td>\n<td>Tipo<\/td>\n<td>Recomendado<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><img decoding=\"async\" src=\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-3-9.jpg&quot;\" alt=\"Tabla de verificaci\u00f3n de par\u00e1metros BIM para suelos de PVC\" \/><\/p>\n<h2>Par\u00e1metros de tipo frente a par\u00e1metros de instancia<\/h2>\n<p><strong>Los datos de tipo describen el producto en s\u00ed; los datos de instancia describen una ocurrencia concreta del mismo.<\/strong><\/p>\n<p>El fabricante, el c\u00f3digo del producto, el espesor y la clase de resistencia al fuego pertenecen al nivel \u00abTipo\u00bb, ya que todas las unidades de ese producto comparten el mismo valor. La habitaci\u00f3n o zona, la cantidad instalada, la fecha de instalaci\u00f3n y el n\u00famero de lote pertenecen al nivel de \u00abInstancia\u00bb, ya que dos habitaciones con el mismo producto pueden tener fechas de instalaci\u00f3n o lotes diferentes. Mezclar estos niveles es uno de los errores m\u00e1s comunes en los objetos proporcionados por el fabricante y provoca problemas en la programaci\u00f3n posterior.<\/p>\n<h2>Conversi\u00f3n a IFC y openBIM<\/h2>\n<p><strong>Los suelos de PVC suelen asignarse a IfcCovering con el PredefinedType \u00abFLOORING\u00bb, utilizando conjuntos de propiedades est\u00e1ndar m\u00e1s un conjunto personalizado para los datos espec\u00edficos del fabricante.<\/strong><\/p>\n<p>Some flooring-specific properties already exist in standard IFC property sets, while data like SKU, wear layer thickness, or certificate numbers usually needs a custom property set. buildingSMART&#8217;s Information Delivery Specification (IDS) can define which objects, classifications, properties, and units must exist in a model exchange, and can automatically check whether a delivered IFC model meets that requirement \u2014 useful for validating flooring data without manual review.<\/p>\n<h2>Traspaso de COBie y FM<\/h2>\n<p><strong>COBie divide los datos sobre suelos en registros de \u00abTipo\u00bb, \u00abComponente\u00bb, \u00abAtributo\u00bb y \u00abDocumento\u00bb, de modo que los equipos de mantenimiento puedan utilizarlos sin necesidad de abrir el modelo nativo.<\/strong><\/p>\n<p>Type records carry product-level facts (manufacturer, spec); Component records carry instance-level facts (location, install date); Attribute records carry extra properties (warranty, fire rating); Document records link to files like EPDs or installation guides rather than embedding them. The exact fields required should be set by the asset owner&#8217;s information requirements, not assumed to be identical across every project.<\/p>\n<h2>Lo que se mantiene en el modelo frente a lo que deber\u00eda enlazar externamente<\/h2>\n<p><strong>Los valores individuales estructurados (espesor, clasificaci\u00f3n, resistencia al fuego) deben figurar como par\u00e1metros. Los documentos completos (gu\u00edas de instalaci\u00f3n, EPD, archivos PDF de garant\u00eda) deben figurar como referencias enlazadas.<\/strong><\/p>\n<p>A simple rule: if a value drives a calculation, filter, or schedule, make it a parameter. If it&#8217;s a document someone needs to read, link it by URL or document ID instead of embedding it. This keeps file size manageable and keeps referenced documents current at the source.<\/p>\n<h2>Los distintos tipos de suelos de PVC requieren par\u00e1metros diferentes<\/h2>\n<p><strong>Los suelos heterog\u00e9neos, homog\u00e9neos, deportivos, ESD y LVT requieren, cada uno de ellos, campos adicionales m\u00e1s all\u00e1 de la lista de verificaci\u00f3n b\u00e1sica.<\/strong><\/p>\n<table>\n<thead>\n<tr>\n<th>Tipo de producto<\/th>\n<th>Par\u00e1metros adicionales<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>L\u00e1mina heterog\u00e9nea<\/td>\n<td>Capa de desgaste, sustrato, rendimiento ac\u00fastico<\/td>\n<\/tr>\n<tr>\n<td>Homog\u00e9neo<\/td>\n<td>Clasificaci\u00f3n de la construcci\u00f3n\/ligante, tratamiento de la superficie<\/td>\n<\/tr>\n<tr>\n<td>PVC deportivo<\/td>\n<td>Absorci\u00f3n de impactos, deformaci\u00f3n vertical, rebote de la pelota, fricci\u00f3n<\/td>\n<\/tr>\n<tr>\n<td>PVC antiest\u00e1tico<\/td>\n<td>Resistencia el\u00e9ctrica, requisitos de puesta a tierra<\/td>\n<\/tr>\n<tr>\n<td>LVT\/tabl\u00f3n<\/td>\n<td>Dimensiones de las lamas, m\u00e9todo de fijaci\u00f3n (encaje a presi\u00f3n o encolado)<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><img decoding=\"async\" src=\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-4-7.jpg&quot;\" alt=\"Par\u00e1metros espec\u00edficos del producto seg\u00fan el tipo de suelo de PVC\" \/><\/p>\n<h2>Comprobaci\u00f3n de que los datos est\u00e1n actualizados<\/h2>\n<p><strong>Track TDS revision, test standard, certificate number, expiry date, and last update date so specifiers aren&#8217;t working from outdated data.<\/strong><\/p>\n<p>He visto c\u00f3mo algunos equipos de licitaci\u00f3n han utilizado un objeto BIM antiguo con un certificado caducado o una ficha t\u00e9cnica obsoleta. Una revisi\u00f3n y una fecha de caducidad visibles permiten detectar esto al instante, en lugar de que se rechace m\u00e1s adelante en una revisi\u00f3n de cumplimiento.<\/p>\n<h2>Denominaci\u00f3n y clasificaci\u00f3n<\/h2>\n<p><strong>Utiliza par\u00e1metros compartidos, una nomenclatura coherente y un c\u00f3digo de clasificaci\u00f3n (Uniclass\/OmniClass) para que los datos se mantengan intactos en el intercambio entre plataformas.<\/strong><\/p>\n<p>&quot;WearLayer_mm&quot; in one object and &quot;Wear Layer Thickness&quot; in another won&#8217;t match automatically in a schedule or export. Consistent naming plus a classification code keeps data meaningful once it leaves its original Revit file.<\/p>\n<h2>Errores comunes<\/h2>\n<ul>\n<li>Considerar el BIM \u00fanicamente como geometr\u00eda, dejando en blanco los campos relativos al rendimiento y al coste<\/li>\n<li>Falta de coherencia en la denominaci\u00f3n de los par\u00e1metros entre los distintos objetos<\/li>\n<li>Mezclar datos de tipo e instancia en un nivel inadecuado<\/li>\n<li>Chasing a fixed LOD number instead of the project&#8217;s actual information requirement<\/li>\n<\/ul>\n<h2>M\u00ednimo frente a \u00abListo para las especificaciones\u00bb frente a \u00abListo para FM\u00bb<\/h2>\n<p><strong>Adapta el nivel de detalle de los datos a la fase del proyecto, en lugar de cargar todos los campos en las primeras fases del dise\u00f1o.<\/strong><\/p>\n<ul>\n<li><strong>M\u00ednimo:<\/strong> identidad, geometr\u00eda, propiedades t\u00e9cnicas b\u00e1sicas: lo suficiente para situarlas y visualizarlas desde el principio.<\/li>\n<li><strong>Listo para la especificaci\u00f3n:<\/strong> incluye datos de rendimiento con m\u00e9todos de ensayo, certificaciones de sostenibilidad y requisitos de instalaci\u00f3n: todo lo necesario para la licitaci\u00f3n.<\/li>\n<li><strong>Compatible con FM:<\/strong> incluye la garant\u00eda, la vida \u00fatil, el calendario de mantenimiento, enlaces a documentos y datos de instancias conformes con COBie: todo lo necesario para la entrega.<\/li>\n<\/ul>\n<p><img decoding=\"async\" src=\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-5-6.jpg&quot;\" alt=\"Niveles de datos BIM para suelos de PVC\" \/><\/p>\n<h2>Conclusi\u00f3n<\/h2>\n<p>Un objeto BIM completo de suelo de PVC debe incluir datos sobre identidad, geometr\u00eda, prestaciones, sostenibilidad, instalaci\u00f3n, coste y gesti\u00f3n de instalaciones, correctamente estructurados y verificados.<\/p>\n<p>If you&#8217;re building a custom or bulk PVC flooring BIM object and want to close any data gaps before production, feel free to send me a message.<\/p>","protected":false},"excerpt":{"rendered":"<p>A PVC flooring BIM model should include identity, geometry, material, performance, sustainability, installation, cost, and FM lifecycle data, each structured with the right parameter type, unit, and test reference. I have spent years on the manufacturing side of PVC flooring, and I see the same problem repeatedly. A model shows a flat rectangle labeled &quot;vinyl&#8230;<\/p>","protected":false},"author":4,"featured_media":9845,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[21],"tags":[],"class_list":["post-9838","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-pvc-floor-blog"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>What PVC Flooring Data Should a BIM Model Include - MF FLOOR<\/title>\n<meta name=\"description\" content=\"Learn what PVC flooring BIM data should include, from geometry and performance to IFC, COBie, installation, cost and FM data.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/meettfit.com\/es\/blog-sobre-suelos-de-pvc\/que-datos-sobre-los-suelos-de-pvc-debe-incluir-un-modelo-bim\/\" \/>\n<meta property=\"og:locale\" content=\"es_ES\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"What PVC Flooring Data Should a BIM Model Include - MF FLOOR\" \/>\n<meta property=\"og:description\" content=\"Learn what PVC flooring BIM data should include, from geometry and performance to IFC, COBie, installation, cost and FM data.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/meettfit.com\/es\/blog-sobre-suelos-de-pvc\/que-datos-sobre-los-suelos-de-pvc-debe-incluir-un-modelo-bim\/\" \/>\n<meta property=\"og:site_name\" content=\"MF FLOOR\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/profile.php?id=100079773047357\" \/>\n<meta property=\"article:published_time\" content=\"2026-08-17T07:00:01+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2-10.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Leo\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"Leo\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tiempo de lectura\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/\"},\"author\":{\"name\":\"Leo\",\"@id\":\"https:\/\/meettfit.com\/#\/schema\/person\/ba93f0ead95f571b725acc83f6544fef\"},\"headline\":\"What PVC Flooring Data Should a BIM Model Include\",\"datePublished\":\"2026-08-17T07:00:01+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/\"},\"wordCount\":1249,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\/\/meettfit.com\/#organization\"},\"image\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2-10.jpg\",\"articleSection\":[\"Vinyl Flooring Insights\"],\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/\",\"url\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/\",\"name\":\"What PVC Flooring Data Should a BIM Model Include - MF FLOOR\",\"isPartOf\":{\"@id\":\"https:\/\/meettfit.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2-10.jpg\",\"datePublished\":\"2026-08-17T07:00:01+00:00\",\"description\":\"Learn what PVC flooring BIM data should include, from geometry and performance to IFC, COBie, installation, cost and FM data.\",\"breadcrumb\":{\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#breadcrumb\"},\"inLanguage\":\"es\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#primaryimage\",\"url\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2-10.jpg\",\"contentUrl\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2-10.jpg\",\"width\":800,\"height\":600,\"caption\":\"PVC Flooring (2)\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/meettfit.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"What PVC Flooring Data Should a BIM Model Include\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/meettfit.com\/#website\",\"url\":\"https:\/\/meettfit.com\/\",\"name\":\"MF FLOOR\",\"description\":\"fitness and sports floor China factory\",\"publisher\":{\"@id\":\"https:\/\/meettfit.com\/#organization\"},\"alternateName\":\"MF FLOOR\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/meettfit.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"es\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/meettfit.com\/#organization\",\"name\":\"MF FLOOR\",\"alternateName\":\"MF FLOOR\",\"url\":\"https:\/\/meettfit.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\/\/meettfit.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2025\/02\/cropped-icon.png\",\"contentUrl\":\"https:\/\/meettfit.com\/wp-content\/uploads\/2025\/02\/cropped-icon.png\",\"width\":512,\"height\":512,\"caption\":\"MF FLOOR\"},\"image\":{\"@id\":\"https:\/\/meettfit.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/profile.php?id=100079773047357\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/meettfit.com\/#\/schema\/person\/ba93f0ead95f571b725acc83f6544fef\",\"name\":\"Leo\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"es\",\"@id\":\"https:\/\/meettfit.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/848b16970688cfb2f4cc64e85a2e2233183d3242ed0a21ffa4c859df339031f6?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/848b16970688cfb2f4cc64e85a2e2233183d3242ed0a21ffa4c859df339031f6?s=96&d=mm&r=g\",\"caption\":\"Leo\"},\"url\":\"https:\/\/meettfit.com\/es\/author\/1659230944qq-com\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"What PVC Flooring Data Should a BIM Model Include - MF FLOOR","description":"Learn what PVC flooring BIM data should include, from geometry and performance to IFC, COBie, installation, cost and FM data.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/meettfit.com\/es\/blog-sobre-suelos-de-pvc\/que-datos-sobre-los-suelos-de-pvc-debe-incluir-un-modelo-bim\/","og_locale":"es_ES","og_type":"article","og_title":"What PVC Flooring Data Should a BIM Model Include - MF FLOOR","og_description":"Learn what PVC flooring BIM data should include, from geometry and performance to IFC, COBie, installation, cost and FM data.","og_url":"https:\/\/meettfit.com\/es\/blog-sobre-suelos-de-pvc\/que-datos-sobre-los-suelos-de-pvc-debe-incluir-un-modelo-bim\/","og_site_name":"MF FLOOR","article_publisher":"https:\/\/www.facebook.com\/profile.php?id=100079773047357","article_published_time":"2026-08-17T07:00:01+00:00","og_image":[{"width":800,"height":600,"url":"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2-10.jpg","type":"image\/jpeg"}],"author":"Leo","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"Leo","Tiempo de lectura":"7 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#article","isPartOf":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/"},"author":{"name":"Leo","@id":"https:\/\/meettfit.com\/#\/schema\/person\/ba93f0ead95f571b725acc83f6544fef"},"headline":"What PVC Flooring Data Should a BIM Model Include","datePublished":"2026-08-17T07:00:01+00:00","mainEntityOfPage":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/"},"wordCount":1249,"commentCount":0,"publisher":{"@id":"https:\/\/meettfit.com\/#organization"},"image":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#primaryimage"},"thumbnailUrl":"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2-10.jpg","articleSection":["Vinyl Flooring Insights"],"inLanguage":"es","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/","url":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/","name":"What PVC Flooring Data Should a BIM Model Include - MF FLOOR","isPartOf":{"@id":"https:\/\/meettfit.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#primaryimage"},"image":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#primaryimage"},"thumbnailUrl":"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2-10.jpg","datePublished":"2026-08-17T07:00:01+00:00","description":"Learn what PVC flooring BIM data should include, from geometry and performance to IFC, COBie, installation, cost and FM data.","breadcrumb":{"@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#breadcrumb"},"inLanguage":"es","potentialAction":[{"@type":"ReadAction","target":["https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/"]}]},{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#primaryimage","url":"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2-10.jpg","contentUrl":"https:\/\/meettfit.com\/wp-content\/uploads\/2026\/08\/PVC-Flooring-2-10.jpg","width":800,"height":600,"caption":"PVC Flooring (2)"},{"@type":"BreadcrumbList","@id":"https:\/\/meettfit.com\/pvc-floor-blog\/what-pvc-flooring-data-should-a-bim-model-include\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/meettfit.com\/"},{"@type":"ListItem","position":2,"name":"What PVC Flooring Data Should a BIM Model Include"}]},{"@type":"WebSite","@id":"https:\/\/meettfit.com\/#website","url":"https:\/\/meettfit.com\/","name":"MF FLOOR","description":"fitness and sports floor China factory","publisher":{"@id":"https:\/\/meettfit.com\/#organization"},"alternateName":"MF FLOOR","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/meettfit.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"es"},{"@type":"Organization","@id":"https:\/\/meettfit.com\/#organization","name":"MF FLOOR","alternateName":"MF FLOOR","url":"https:\/\/meettfit.com\/","logo":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/meettfit.com\/#\/schema\/logo\/image\/","url":"https:\/\/meettfit.com\/wp-content\/uploads\/2025\/02\/cropped-icon.png","contentUrl":"https:\/\/meettfit.com\/wp-content\/uploads\/2025\/02\/cropped-icon.png","width":512,"height":512,"caption":"MF FLOOR"},"image":{"@id":"https:\/\/meettfit.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/profile.php?id=100079773047357"]},{"@type":"Person","@id":"https:\/\/meettfit.com\/#\/schema\/person\/ba93f0ead95f571b725acc83f6544fef","name":"Leo","image":{"@type":"ImageObject","inLanguage":"es","@id":"https:\/\/meettfit.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/848b16970688cfb2f4cc64e85a2e2233183d3242ed0a21ffa4c859df339031f6?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/848b16970688cfb2f4cc64e85a2e2233183d3242ed0a21ffa4c859df339031f6?s=96&d=mm&r=g","caption":"Leo"},"url":"https:\/\/meettfit.com\/es\/author\/1659230944qq-com\/"}]}},"_links":{"self":[{"href":"https:\/\/meettfit.com\/es\/wp-json\/wp\/v2\/posts\/9838","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/meettfit.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/meettfit.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/meettfit.com\/es\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/meettfit.com\/es\/wp-json\/wp\/v2\/comments?post=9838"}],"version-history":[{"count":1,"href":"https:\/\/meettfit.com\/es\/wp-json\/wp\/v2\/posts\/9838\/revisions"}],"predecessor-version":[{"id":9849,"href":"https:\/\/meettfit.com\/es\/wp-json\/wp\/v2\/posts\/9838\/revisions\/9849"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/meettfit.com\/es\/wp-json\/wp\/v2\/media\/9845"}],"wp:attachment":[{"href":"https:\/\/meettfit.com\/es\/wp-json\/wp\/v2\/media?parent=9838"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/meettfit.com\/es\/wp-json\/wp\/v2\/categories?post=9838"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/meettfit.com\/es\/wp-json\/wp\/v2\/tags?post=9838"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}